EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/MP/MIS/67217/2017    ii. MoEFCC File No. : 10-50/2017-IA.III    iii.Short narrative of the project: Madhya Pradesh Waste Management Project (a Division of Ramky Enviro Engineers Limited)    iv. Project Sector : Infrastructure and Miscellaneous Projects & CRZ    v. Company/Proponent : RAMKY ENVIRO ENGINEERS LTD
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.Madhya PradeshDharDhar
 
   vii.Date of TOR Granted 08 Sep 2017 viii.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 07 Apr 2018 x.Project Type: New
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 08 Sep 2017   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAKindly see the final minutes of 32nd meeting of EAC (Infra-2) 16 Jul 2018
2. ADS LetterWith the reference to the minutes of 32nd EAC meeting (Infra - 2), we hereby provide the details/documents for your consideration 08 Aug 2018
3.NAThe EAC deliberated upon the information provided by the project proponent and found that information provided is inadequate. After deliberation, the Committee sought following documents/certificates: (i) Submit affidavit that project has been operational prior September, 2006 and therefore do not require prior environmental clearance. (ii) Submit details of court case along with its present status. (iii) Submit revised water balance and permission for use of water for existing facility. (iv) Submit Plan for green belt development. In view of the foregoing observations, the EAC recommend to defer the proposal. The proposal shall be reconsidered after the above essential details are addressed and submitted. 03 Oct 2018
4. ADS LetterWith the reference to the meeting minutes of 34th EAC Meeting (Infra - 2) held on 24th to 26th September 2018, we hereby submit the documents enclosed to answer the question raised by the EAC. 02 Feb 2019
5.NAFrom the information submitted, it appears that the details submitted is of another project. Kindly upload the correct information pertaining to the instant project. 07 Mar 2019
6. ADS Lettercorrect information has been attached for your kind consideration. 07 Mar 2019
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : NABET/EIA/1518/SA 061    iii. Name of Consultant: Ramky Enviro Services Private Limited   iv. Address : Ramky Enviro Services Pvt. Ltd, Ramky Grandiose, Ramky Towers, Gachibowli, Hyderabad   v. Mobile No.: 9949991029   vi. Landline No.: 04023015369   vii. Email Id: suresh.pasali@ramky.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Sanjiv    ii. Designation : IWMHead    iii. Name of Company(Applicant Name should not be given here) : RAMKY ENVIRO ENGINEERS LTD    iv. Address : Ramky Enviro Engineers Limited 13th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency