EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/GJ/IND2/64176/2017
ii. MoEFCC File No. :
IA-J-11011/207/2017-IA-II(I)
iii.Short narrative of the project:
M/s. Swastik Laminates
iv. Project Sector :
Industrial Projects-3
v. Company/Proponent :
SWASTIK
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Gujarat
Rajkot
Gondal
vii.Date of TOR Granted
30 May 2017
viii.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
17 Jul 2018
x.Project Type:
New
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
06 Feb 2018
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
we have uploaded EDS reply letter- swastik in the column of "upload additional report / study / document as desired by Ministry/EAC"
Additional Attachments, if any
S.no.
Attached File
Date of Submission
1.
EDS 3 reply letter_swastik
17 Jul 2018
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
Deferred
09 Sep 2018
2.
ADS Letter
Respected sir, as per minutes of meeting received for M/s. Swastik Laminates, we have submitted herewith reply letter. hope that the attached details meet with your requirement
29 Sep 2018
3.
NA
The EAC, after detailed deliberations, observed no change in the status from that reported during the last meeting on 27-29 August, 2018. The consent to establish dated 12th July, 2018 issued by the SPCB still shows present resin production of 300 TPM, whereas the present proposal is for setting up resin manufacturing unit of capacity 1000 TPM. The project proponent was asked to first get the same rectified. The proposal was, therefore, deferred for the needful.
26 Nov 2018
4.
ADS Letter
Respected Sir, It is requested to note that our director list is changed. New MOA of director is attached with this letter as annexure – A. It is to be noted that due to change in director profile, decision are pending since long time for application of environment clearance. However now our director list is final and we have taken decision to first clear out pending government procedure and restart application for environment clearance. Also please note that we have revise our company name from SWASTIK LAMINATES to TIRUPATI LAMINATES and Dastavej copy is also attached here as annexure-B for your reference. As part of environment clearance application we would like to submit answer of our ADS. which is attach in above pdf.
27 Nov 2020
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/1619/RA0033
iii. Name of Consultant:
T. R. Associates
iv. Address :
block - C, office - 605 A, Ganesh Meridian, Opp. KArgil petrol pump, near sola overbridge, S. G. Highway, Ahmedabad.
v. Mobile No.:
9825371099
vi. Landline No.:
07927450694
vii. Email Id:
swastiklaminates2017@gmail.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Pradeepbhai
ii. Designation :
partner
iii. Name of Company(Applicant Name should not be given here) :
SWASTIK
iv. Address :
Survey No. 203/15, Behind Shaktiman Rotawetar, NH-8B, Village: Bhunava, Ta. Gondal
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency