EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/GJ/IND2/61999/2017
ii. MoEFCC File No. :
J-11011/511/2010-IA.II(I)
iii.Short narrative of the project:
PI Industries Ltd.
iv. Project Sector :
Industrial Projects-2
v. Company/Proponent :
PI INDUSTRIES LTD.
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Gujarat
Bharuch
Jambusar
2.
Gujarat
Bharuch
Jambusar
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
Annexure-Uploaded EC Compliance report
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
29 May 2017
x.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
03 May 2018
x.Project Type:
Expansion
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
19 Feb 2018
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
NIL
Additional Attachments, if any
S.no.
Attached File
Date of Submission
1.
Reply of query is attached.
25 Apr 2018
2.
Reply of query is attached.
03 May 2018
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
The EAC, after deliberations, insisted for more inputs and clarifications in respect of the following: • Clarity on products and quantity, which is necessarily to be consistent with the earlier EC dated 4th April, 2011 and the ToR dated 29th May, 2017. • Revised water balance for the unit conforming to Zero Liquid Discharge. • Factual status on the representation from Shri Girishbhai K Patel, already forwarded to the Ministry’s Regional Office vide letter dated 12th December, 2013. • Comments from GPCB also on the above representation vis-à-vis their monitoring report dated 3rd April, 2018 on compliance status of existing EC conditions. The proposal was deferred for the needful on the above lines.
04 Jul 2018
2.
ADS Letter
Please find attached our point wise reply to the queries raised during MOM of 25-27th June, 2018.
13 Aug 2018
3.
NA
Deffered
09 Sep 2018
4.
ADS Letter
Please find attached herewith the details required as per MOM of 29th August
10 Oct 2018
5.
ADS Letter
Please find attached herewith the details required as per MOM of 29th August
10 Oct 2018
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/1619/RA0084
iii. Name of Consultant:
San Envirotech Pvt. Ltd.
iv. Address :
424. Medicine Market, Paldi Cross Road, Paldi, Ahmedabad
v. Mobile No.:
9825007201
vi. Landline No.:
07926583077
vii. Email Id:
dharmendra.mehra@piind.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Sushil
ii. Designation :
VicepresidentEHS
iii. Name of Company(Applicant Name should not be given here) :
PI INDUSTRIES LTD.
iv. Address :
Plot No: SPM-28, Sterling SEZ & Infrastructure Ltd., At & Po: Sarod
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
Print