EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/KA/IND/73001/2018    ii. MoEFCC File No. : J-11011/458/2008-IA-II(I)    iii.Short narrative of the project: Regarding amendment in Environmental Clearance under the Provision of Section 7(ii) of EIA Notification 2006 with respect to increase in Waste Heat Power Generation Capacity from 20 MW to 30 MW without changing the Clinker Capacity of 2.4 Million TPA    iv. Project Sector : Industrial Projects - 1    v. Company/Proponent : SHREE CEMENT EAST PRIVATE LIMITED
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.KarnatakaGulbargaSedam
 
   vii.Date of TOR Granted N/A viii.TOR letter issued by Ministry: N/A ix.Date of Submission for EC: 21 Feb 2018 x.Project Type: Expansion under para 7(ii)
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i. Uploaded EC Compliance report by rigional office of MoEFCC: Annexure-Uploaded EC Compliance report ii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report iii. Uploaded Form I: Annexure-Uploaded Form I   iv. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   v. Uploaded Cover Letter: Annexure-Cover Letter   vi.Remarks: Proposal is for expansion of Waste Heat Power Generation from 20 to 30 MW without using any auxiliary fuel. However, as per the MOEF&CC Notification dt 25th June 2014, 1st December 2009 and OM dated 11th November 2009 thermal power plants using waste heat boiler without auxiliary fuel are exempted from EC. In view of above, it is requested to kindly consider above proposal and grant the amendment in EC at the earliest.
Additional Attachments, if any
S.no. Attached File Date of Submission
1. Key Plan15 Feb 2018
3. Additional Detail Sought:   NIL
4. Accredited Consultant Details
   i. Accreditation status : No    ii. Reason for not hiring the Consultant : We are submitting the proposal under the Provision of Section 7(ii) of EIA Notification 2006 with respect to increase in Waste Heat Power Generation Capacity from 20 MW to 30 MW. Hence No requirement of consultant.
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Dr Anil    ii. Designation : Authorized Signatory    iii. Name of Company(Applicant Name should not be given here) : SHREE CEMENT EAST PRIVATE LIMITED    iv. Address : 21, Strand Road, Kolkata v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency