EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/CG/CMIN/59215/2016
ii. MoEFCC File No. :
J-11015/76/2016-IA-II (M)
iii.Short narrative of the project:
Parsa Opencast Coal Mine Project (5 MTPA) and Pit Head Coal Washery (5 MTPA)
iv. Project Sector :
Coal Mining
v. Company/Proponent :
RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Chhattisgarh
Surajpur
Surajpur
2.
Chhattisgarh
Surajpur
Surajpur
3.
Chhattisgarh
Surguja
Ambikapur
4.
Chhattisgarh
Surguja
Ambikapur
vii.Date of TOR Granted
23 Mar 2017
viii.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
10 Jan 2018
x.Project Type:
New
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
29 Oct 2017
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
The ToR for EIA/EMP was issued by MoEF&CC vide letter no. J-11015 /76/2016-IA.I1 (M) dated 23rd March 2017. After collection of baseline data a draft EIA EMP prepared. Public hearing held at two districts i.e. on 29.10.2017 in Surguja Dsitrict & on 12.11.2017 in Surajpur District of Chhattisgarh. This Application is submitted for Environment Clearance.
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
Deferred (Additional Information)
26 Feb 2018
2.
ADS Letter
Dear Sir, Reply to EAC Obsevations in its meeting held on 15-16th February 2018 related to (i) Undertaking for data of EIA-EMP (ii) Comments on Concurrence/Permission from Gram Sabha/Tribal Population under PESA and impact on livelihood of Tribal Population, (iii) Impact of Nala diversion on Hasdeo River, (iv) Comments from SBWL reg Elephant migration; is uploaded for consideration in next EAC meeting.
31 May 2018
3.
NA
Deferred
31 Jul 2018
4.
ADS Letter
Dear Sir, Reply to following EAC observations in its meeting held on 24th July 2018 is being uploaded for consideration-(i) Comments on Concurrence /Permission from Gram Sabha/Tribal Population under PESA and impact on livelihood of Tribal Population, (ii) Impact of Nala diversion on Hasdeo River, (iii) Comments from SBWL reg Elephant migration; is uploaded for consideration in next EAC meeting.
07 Aug 2018
5.
NA
The EAC, after deliberations and especially in view of recommendations of the Forest Advisory Committee (FAC) in the Ministry in its meeting held on 26th July, 2018, desired for their comments on the following:- • Comprehensive study on conservation of biodiversity and wildlife conducted by the ICFRE. • Opinion of Ministry of Law & Justice/ASG on applicability of the approval accorded by the then Hon’ble MEF&CC vide order dated 23rd June, 2011 for prospecting in the said coal block/other coal blocks in Hasdeo Arand forest area pending final disposal of the matter in the Apex court. • Success of reclamation works in the adjoining coal blocks (Tara & PEKB). The Committee also insisted for compliance of its earlier recommendations in respect of opinion of the State Wildlife Boar
05 Oct 2018
6.
ADS Letter
Reply to the comments raised in minutes of meeting of EAC dated 27.09.2018 is being uploaded for consideration.
22 Jan 2019
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/1619/RA 0043
iii. Name of Consultant:
VIMTA LABS LIMITED
iv. Address :
142, IDA, Phase II, Cherlapally, Hyderabad-500051
v. Mobile No.:
9000711309
vi. Landline No.:
040-27264141
vii. Email Id:
janardhan@vimta.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Devendra
ii. Designation :
Addl. Chief Engineer (Fuel)
iii. Name of Company(Applicant Name should not be given here) :
RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
iv. Address :
Vidyut Bhawan, Janpath, Jyoti Nagar, Jaipur
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
Print