EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/TG/IND2/36540/2015    ii. MoEFCC File No. : J-11011/19/2016-IA II (I)    iii.Short narrative of the project: Hazelo Lab Pvt. Ltd.    iv. Project Sector : Industrial Projects-2    v. Company/Proponent : HAZELO LAB PVT LTD
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.TelanganaNalgondaPochampalle
2.TelanganaNalgondaPochampalle
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: Annexure-Uploaded EC Compliance report viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 31 Mar 2016 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 04 May 2018 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 12 Jul 2017   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
Additional Attachments, if any
S.no. Attached File Date of Submission
1. Hazelo EDS Response04 May 2018
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe EAC, after deliberations, insisted for more inputs, clarifications and/or necessary actions in respect of the following: • Existing environmental clearance dated 23rd November, 2010 to be transferred from M/s Venlar labs (P) Ltd to M/s Hazelo Lab Pvt Ltd. The same was already stipulated in the ToR dated 31st March, 2016, but no proposal for the same has been submitted so far on the Ministry’s portal. • Compliance of terms and conditions of the earlier EC dated 23rd November, 2010 from the concerned Regional Office of the Ministry. • Revised water balance for the fresh water requirement reduced by 20%. • Addressing the issues raised during public hearing to be supported with comments from SPCB/State Government. The proposal was deferred for the needful on the above lines 04 Jul 2018
2. ADS LetterRespected Sir, Please find the enclosed ADS response 20 Dec 2018
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 160    iii. Name of Consultant: Team Labs and Consultants   iv. Address : TEAM Labs and Consultants B-115-117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad-500 038   v. Mobile No.: 9866415966   vi. Landline No.: 04023748555   vii. Email Id: sridhar.r@heterodrugs.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : J Sambi    ii. Designation : Director    iii. Name of Company(Applicant Name should not be given here) : HAZELO LAB PVT LTD    iv. Address : Hetero Drugs Limited Plot No. 7-2-A2, Hetero Corp, Industrial Estate, Sanath Nagar v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency