Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of 470 MW to 680 MW with an additional 45 MW and debottlenecking of existing petrochemical complex at Hazira
(b)Name of the Company / Organisation MS RELIANCE INDUSTRIES LIMITED
(c)Registered Address Reliance Industries Limited, Hazira Manufacturing Division, Hazira Industrial Area, Village - Mora, P.O. - Bhatha, District - Surat,,Surat,Gujarat-394510
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Prashant Gogate
(b)Designation (Owner/ Partner/ CEO) Sr VP
(c)Address PO Reliance Greens, Motikhavdi, Jamnagar 361142,,Mumbai,Mumbai City,Maharashtra-400021
(d)Pin code 400021
(e)E-mail hmd.ec@ril.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(d) Thermal Power Plants
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/THE/290329/2021
(d)Master Proposal Number(Single Window) SW/290328/2022
(e)EAC concerned (for category A Projects only) Thermal Projects
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. RIL HMD, Hazira Notified Industrial area, Hazira,
(b)Pincode 394510
(c)Bounded Latitudes (North)
From
Degree 21
Minutes 9
Second 3.99
From
Degree 21
Minutes 10
Second 46.25
(d)Bounded Longitudes (East)
From
Degree 72
Minutes 39
Second 57.46
From
Degree 72
Minutes 42
Second 4.12
(e)Survey of India Topo Sheet No. F43M12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 11
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratSuratChorasiMora
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-II011/40/2015-IA-II(I)
(b)Date of Apply of TOR 12 Nov 2021
(c)Date of Issue of TOR / Standard ToR 18 May 2022
(d)Date of Apply of EC 04 Nov 2016
(e)Date of Issue of EC 10 Jul 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Jun 2022
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Jul 2022
Distance of Public Hearing Venue from the Proposed Project :0.9
EPH, Reliance DoT Center, Behind L & T Training Center, RS Nos. 60, 63/1, 65/2+3, 66, 67/1, 67/2, 68, Vill. Mora, Ta. Choryasi, Dist. Surat - 394510
State :Gujarat
District :Surat
Tehsil :Chorasi
Village :Mora
170The people welcomed the proposed project and expressed their gratitude towards RIL-HMD because of the development brought about to the area. Issues pertaining to employment opportunities, road conditiDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Gandhinagar
(iii)Letter No. J-11/29-2022-IROGNR dated 21st June 2022
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 16 2022 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Steam (gas based PP)4.646.0410.680Othersmillion TPAOthersPipeline
(2.)Coal based power3600360.000Mega Watt(MW)OthersNA
(3.)Steam (coal based PP)15.77015.770Othersmillion TPAOthersPipeline
(4.)Gas based power139181320.000Mega Watt(MW)OthersNA
(5.)Power from waste heat recovery (PTA)02020.000Mega Watt(MW)OthersNA
(6.)Power from steam extraction (CF)02525.000Mega Watt(MW)OthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Captive Power Generation (45 MW)Does not existPTA-20 MW (Waste heat rec.), CF-25 MW (Steam ext.)Additional 45 MW generationRefer section 9
(2.)Captive Power Generation499 MW - 360 MW (coal) & 139 MW (gas)181 MW to be operationalized680 MW - 360 MW (coal) & 320 MW (gas)Refer section 9
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 11 Jan 2021
(iv)Valid Upto 31 Mar 2027
(v)File No. GPCB/CCA-SRT-52(16)/ID_21170
(vi)Application No. 175575
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 10000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 790
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 47
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 109248.75
(b)Existing quantity of raw material/fuel 36416.25
(c)Total quantity of raw material/fuel 145665
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Liquid Fuel (Naphtha/HSD/C9)187OthersMT/hIndigenousRoad350 CaptiveCopy of Linkage
(2.)Natural Gas145665OthersSm3/hIndigenous / ImportOthersPipeline1 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2021 To 31 May 2021
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 17
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube77.0271.0477.01100
(2.)NOxMicro Gram per Meter Cube16.5213.9416.2880
(3.)PM2.5Micro Gram per Meter Cube44.9640.7544.5260
(4.)SO2Micro Gram per Meter Cube15.4212.3815.2280
    14.2.     No. of Ground Water monitoring locations : 14
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l17422485002000
(2.)pHNA8.187.498.58.5
(3.)TSSmg/l0000
(4.)Heavy MetalsIronmg/l0.050.050.30.3
(5.)Total Hardnessmg/l598.3844.17200600
(6.)Fluoridemg/l1.040.0511.5
(7.)Chloridesmg/l804.721.12501000
    14.3.     No. of Surface Water monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l8.347.24B
(2.)DOmg/l7.246.94B
(3.)BODmg/l2.961.0B
(4.)CODmg/l13.722.01B
    14.4.     No. of Ambient Noise monitoring locations : 21
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))65.962.570
(2.)Leq(Day)A-weighted decibels(dB(A))67.362.575
    14.5.     No. of Soil Sample Monitored locations : 15
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram8.992.15
(2.)Electric ConductivityMillisiemens per Centimetre0.870.27
(3.)pH8.747.51
(4.)N(Nitrogen)Milligram per Kilogram1242.5537.0
(5.)P(Phosphorus)Milligram per Kilogram30.9310.86
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface2136417Copy of Permission LetterPipelineWeirPB-2 / WTR / RELIANCE / F / 42146005 May 2004160347
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Effluent8228690000ETPDischarge into Surface Water Body,Reuse within the Plant & Recycling1000072286
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 82286
(b)Total Discharged Water (Kilolitre per Day) 72286
(c)Total Reused Water (Kilolitre per Day) 10000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NoneOthersNone0Tons1OthersNAOthersNA
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube76.527.922.1778.69100
(2.)PM2.5Microgram per Meter Cube44.287.922.1746.4560
(3.)NOxMicrogram per Meter Cube16.357.927.3723.7380
(4.)SO2Microgram per Meter Cube13.967.9212.9428.980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)HRSG IIIGas603.1OthersPM, SO2, NOx, CO0.8042, 4.0215, 28.15, 12.068
(2.)HRSG IVGas603.1OthersPM, SO2, NOx, CO0.8042, 4.0215, 28.15, 12.068
(3.)HRSG VGas603.1OthersPM, SO2, NOx, CO0.8042, 4.0215, 28.15, 12.068
(4.)HRSG IXGas603.1OthersPM, SO2, NOx, CO0.8042, 4.0215, 28.15, 12.068
(5.)HRSG VIIIGas603.1OthersPM, SO2, NOx, CO0.8042, 4.0215, 28.15, 12.068
(6.)HRSG VIGas603.1OthersPM, SO2, NOx, CO0.8042, 4.0215, 28.15, 12.068
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NA
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 398.32
    Total Land (ha.) 398.32
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 6372.1
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 17.1
(d)Surface Water Bodies (ha.) 2868.5
(e)Settlements (ha.) 1876.6
(f)Industrial (ha.) 3404.7
(g)Forest (ha.) 1632.1
(h)Mangroves (ha.) 1588.6
(i)Marine Area (ha.) 5908.6
(j)Others (ha.) : Aquafarm, Mud flats, Scrubland, Airport, Port 7728.96
    Total (ha.) 31397.2600
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant294.24Land available with RIL - Plants and Utilities
(2.)Green belt98Land available with RIL - Greenbelt developed
(3.)OthersOpen areas, roads and approaches6.08Land available with RIL - Roads, Approaches
Total (ha.) 398.32
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone0NA
(2.)Wildlife CorridorsNone0NA
(3.)NPANone0NA
(4.)WLSNone0NA
(5.)ESZsNone0NA
(6.)Critically Polluted AreaNone0NA
(7.)CorridorsNone0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestHazira and Dumas Reserve forest8NA
(2.)Defence InstallationsNone0NA
(3.)Archaeological SitesNone0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Please refer Section 3.10.3 and Annexure 17 of EIA report
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made NA
(iii)Period of Implementation NA
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Tapi estuary
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gulf of Khambhat
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 2000
(d)Temporary Employment- During Operation 500
(e)No. of working days 330
(f)Total Manpower 2550
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt12350173
(2.)Percentage of Total Project Area311243
(3.)No. of Plants20700093000300000
(4.)Funds Allocated498000002880000078600000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalSourcing of power from captive power plant will help in efficient operations and reduction in transmission losses and allied emissions. Use of biomass as a fuel in CCPP to the extent of its availability will help in reducing carbon footprint.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Thermal Projects
S. No.Item Details
1.
Specifications of Plant:
(a) Technology Proposed Combined cycle PP
(b) Plant Load Factor(%) 95
(c) Station Heat Rate (Kcal/Kwh) 1850
(d) Steam Rate/Flow Rate 275
(e) Boiler Temperature 350
(f) Boiler Pressure 85
(g) Type of Stack Single flue
(h) No. of Stacks 6
S. No. Stack ID Stack Height (m) Stack Diameter at exit (m) Exit Velocity of Stack Gas (m/s) Exit Temperature of Stack Gas (Degree Celsius)
(1.)1603.116187
(2.)2603.116187
(3.)3603.116187
(4.)4603.116187
(5.)5603.116187
(6.)6603.116187
      2.        Details of Fuel Linkage
S. No.Type of Fuel Type of Linkage Other Type of Linkage DetailsCharacteristics
(1.)Liquid Fuel (Naphtha/HSD/C9)Captive
Source of Linkage :Indigenous
Quantity of Linkage Granted :187
Date of Linkage :01 Jan 2000
Duration of Linkage :30
Gross Calorific Value (Kcal/Kg) :10000
Ash Content (%) :0
Sulphur Content (%) :0.5
Moisture (%) :0
Mercury (mg/kg) :0
Fixed Carbon (%) :80
Volatile Matter (%) :0
(2.)Natural GasOpen Market
Source of Linkage :Indigenous / Import
Quantity of Linkage Granted :145665
Date of Linkage :01 Jan 2000
Duration of Linkage :30
Gross Calorific Value (Kcal/Kg) :9500
Ash Content (%) :0
Sulphur Content (%) :0
Moisture (%) :0
Mercury (mg/kg) :0
Fixed Carbon (%) :74
Volatile Matter (%) :100
     3.       Details of Transportation of Fuel
S. No.Fuel Rail RoadPipe ConveyorConveyor BeltArial RopewayOther Mode of TransportationTotal DistanceTotal Quantity
(1.)Liquid Fuel (Naphtha/HSD/C9)
Distance :
Quantity :
Distance :350
Quantity :187
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
350187
(2.)Natural Gas
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :1
Quantity :145665
1145665
TOTAL Distance : 0
Quantity : 0
Distance : 350
Quantity : 187
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 1
Quantity : 145665
4.
Details of Cooling System:
(a) Type of Cooling System Water Cooled
(b) Type of Draft Forced Draft
(c) Type of Air Circulation Counter Flow
(d) Cycle of Cooling (COC) 5
(e) Water Req. For Cooling (m3/day) 6000
(f) Boiler Blow Down Temperature 45
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/IA0062
(ii)Name of the EIA Consultant Aqua-Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJ.) INDIA
(iv)Mobile No. 9904433995
(v)Landline No. 0261246085
(vi)Email Id aquaair_surat@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Thermal Projects
(ix)Validity of Accreditation 07 Oct 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPrashant Gogate
DesignationSr VP
Name of Company (Applicant Name should not be given here)MS RELIANCE INDUSTRIES LIMITED
AddressReliance Industries Limited, Hazira Manufacturing Division, Hazira Industrial Area, Village - Mora, P.O. - Bhatha, District - Surat
Print