1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of 470 MW to 680 MW with an additional 45 MW and debottlenecking of existing petrochemical complex at Hazira | (b)Name of the Company / Organisation | MS RELIANCE INDUSTRIES LIMITED | (c)Registered Address | Reliance Industries Limited,
Hazira Manufacturing Division,
Hazira Industrial Area, Village - Mora, P.O. - Bhatha, District - Surat,,Surat,Gujarat-394510 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Prashant Gogate | (b)Designation (Owner/ Partner/ CEO) | Sr VP | (c)Address | PO Reliance Greens, Motikhavdi, Jamnagar 361142,,Mumbai,Mumbai City,Maharashtra-400021 | (d)Pin code | 400021 | (e)E-mail | hmd.ec@ril.com | (f)STD Code. | 0(f)Telephone No. | | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(d) Thermal Power Plants
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/THE/290329/2021 | (d)Master Proposal Number(Single Window) | SW/290328/2022 | (e)EAC concerned (for category A Projects only) | Thermal Projects | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | RIL HMD, Hazira Notified Industrial area, Hazira, | (b)Pincode | 394510 | (c)Bounded Latitudes (North) | | From | | Degree | 21 | Minutes | 9 | Second | 3.99 | From | | Degree | 21 | Minutes | 10 | Second | 46.25 | (d)Bounded Longitudes (East) | | From | | Degree | 72 | Minutes | 39 | Second | 57.46 | From | | Degree | 72 | Minutes | 42 | Second | 4.12 | (e)Survey of India Topo Sheet No. | F43M12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 11 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 0.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Surat | Chorasi | Mora | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-II011/40/2015-IA-II(I) | (b)Date of Apply of TOR | 12 Nov 2021 | (c)Date of Issue of TOR / Standard ToR | 18 May 2022 | (d)Date of Apply of EC | 04 Nov 2016 | (e)Date of Issue of EC | 10 Jul 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 26 Jul 2022 | Distance of Public Hearing Venue from the Proposed Project : | 0.9 |
| EPH, Reliance DoT Center, Behind L & T Training Center, RS Nos. 60, 63/1, 65/2+3, 66, 67/1, 67/2, 68, Vill. Mora, Ta. Choryasi, Dist. Surat - 394510 | State : | Gujarat | District : | Surat | Tehsil : | Chorasi | Village : | Mora |
| 170 | The people welcomed the proposed project and expressed their gratitude towards RIL-HMD because of the development brought about to the area. Issues pertaining to employment opportunities, road conditi | District Collector | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Gandhinagar | (iii)Letter No. | J-11/29-2022-IROGNR dated 21st June 2022 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 16 2022 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Steam (gas based PP) | 4.64 | 6.04 | 10.680 | Others | million TPA | Others | Pipeline | (2.) | Coal based power | 360 | 0 | 360.000 | Mega Watt(MW) | | Others | NA | (3.) | Steam (coal based PP) | 15.77 | 0 | 15.770 | Others | million TPA | Others | Pipeline | (4.) | Gas based power | 139 | 181 | 320.000 | Mega Watt(MW) | | Others | NA | (5.) | Power from waste heat recovery (PTA) | 0 | 20 | 20.000 | Mega Watt(MW) | | Others | NA | (6.) | Power from steam extraction (CF) | 0 | 25 | 25.000 | Mega Watt(MW) | | Others | NA | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Captive Power Generation (45 MW) | Does not exist | PTA-20 MW (Waste heat rec.), CF-25 MW (Steam ext.) | Additional 45 MW generation | Refer section 9 | (2.) | Captive Power Generation | 499 MW - 360 MW (coal) & 139 MW (gas) | 181 MW to be operationalized | 680 MW - 360 MW (coal) & 320 MW (gas) | Refer section 9 | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 11 Jan 2021 | (iv)Valid Upto | 31 Mar 2027 | (v)File No. | GPCB/CCA-SRT-52(16)/ID_21170 | (vi)Application No. | 175575 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 10000 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 790 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 47 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 109248.75 | (b)Existing quantity of raw material/fuel | 36416.25 | (c)Total quantity of raw material/fuel | 145665 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Liquid Fuel (Naphtha/HSD/C9) | 187 | Others | MT/h | Indigenous | Road | | 350 | Captive | | Copy of Linkage | (2.) | Natural Gas | 145665 | Others | Sm3/h | Indigenous / Import | Others | Pipeline | 1 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2021 To 31 May 2021 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 17 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 77.02 | 71.04 | 77.01 | 100 | (2.) | NOx | | Micro Gram per Meter Cube | 16.52 | 13.94 | 16.28 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 44.96 | 40.75 | 44.52 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 15.42 | 12.38 | 15.22 | 80 | |
14.2. No. of Ground Water monitoring locations : 14 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1742 | 248 | 500 | 2000 | (2.) | pH | | | NA | | 8.18 | 7.49 | 8.5 | 8.5 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | Heavy Metals | | Iron | mg/l | | 0.05 | 0.05 | 0.3 | 0.3 | (5.) | Total Hardness | | | mg/l | | 598.38 | 44.17 | 200 | 600 | (6.) | Fluoride | | | mg/l | | 1.04 | 0.05 | 1 | 1.5 | (7.) | Chlorides | | | mg/l | | 804.7 | 21.1 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 11 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 8.34 | 7.24 | B | (2.) | DO | | mg/l | | 7.24 | 6.94 | B | (3.) | BOD | | mg/l | | 2.96 | 1.0 | B | (4.) | COD | | mg/l | | 13.72 | 2.01 | B | |
14.4. No. of Ambient Noise monitoring locations : 21 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 65.9 | 62.5 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 67.3 | 62.5 | 75 | |
14.5. No. of Soil Sample Monitored locations : 15 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 8.99 | 2.15 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.87 | 0.27 | (3.) | pH | | | 8.74 | 7.51 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 1242.5 | 537.0 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 30.93 | 10.86 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 4 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 2 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 21364 | 17 | Copy of Permission Letter | Pipeline | | Weir | | PB-2 / WTR / RELIANCE / F / 421460 | 05 May 2004 | 160347 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Effluent | 82286 | 90000 | ETP | Discharge into Surface Water Body,Reuse within the Plant & Recycling | | 10000 | 72286 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 82286 | (b)Total Discharged Water (Kilolitre per Day) | 72286 | (c)Total Reused Water (Kilolitre per Day) | 10000 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | None | Others | None | 0 | Tons | 1 | Others | NA | Others | NA | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 76.52 | 7.92 | 2.17 | 78.69 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 44.28 | 7.92 | 2.17 | 46.45 | 60 | (3.) | NOx | | Microgram per Meter Cube | 16.35 | 7.92 | 7.37 | 23.73 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 13.96 | 7.92 | 12.94 | 28.9 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | HRSG III | Gas | 60 | 3.1 | Others | PM, SO2, NOx, CO | 0.8042, 4.0215, 28.15, 12.068 | (2.) | HRSG IV | Gas | 60 | 3.1 | Others | PM, SO2, NOx, CO | 0.8042, 4.0215, 28.15, 12.068 | (3.) | HRSG V | Gas | 60 | 3.1 | Others | PM, SO2, NOx, CO | 0.8042, 4.0215, 28.15, 12.068 | (4.) | HRSG IX | Gas | 60 | 3.1 | Others | PM, SO2, NOx, CO | 0.8042, 4.0215, 28.15, 12.068 | (5.) | HRSG VIII | Gas | 60 | 3.1 | Others | PM, SO2, NOx, CO | 0.8042, 4.0215, 28.15, 12.068 | (6.) | HRSG VI | Gas | 60 | 3.1 | Others | PM, SO2, NOx, CO | 0.8042, 4.0215, 28.15, 12.068 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | NA | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 398.32 | Total Land (ha.) | 398.32 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 6372.1 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 17.1 | (d)Surface Water Bodies (ha.) | 2868.5 | (e)Settlements (ha.) | 1876.6 | (f)Industrial (ha.) | 3404.7 | (g)Forest (ha.) | 1632.1 | (h)Mangroves (ha.) | 1588.6 | (i)Marine Area (ha.) | 5908.6 | (j)Others (ha.) : Aquafarm, Mud flats, Scrubland, Airport, Port | 7728.96 | Total (ha.) | 31397.2600 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 294.24 | Land available with RIL - Plants and Utilities | (2.) | Green belt | | 98 | Land available with RIL - Greenbelt developed | (3.) | Others | Open areas, roads and approaches | 6.08 | Land available with RIL - Roads, Approaches | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None | 0 | NA | (2.) | Wildlife Corridors | None | 0 | NA | (3.) | NPA | None | 0 | NA | (4.) | WLS | None | 0 | NA | (5.) | ESZs | None | 0 | NA | (6.) | Critically Polluted Area | None | 0 | NA | (7.) | Corridors | None | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Hazira and Dumas Reserve forest | 8 | NA | (2.) | Defence Installations | | None | 0 | NA | (3.) | Archaeological Sites | | None | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not Applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Please refer Section 3.10.3 and Annexure 17 of EIA report | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | NA | (iii)Period of Implementation | NA | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Tapi estuary | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Gulf of Khambhat | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 2000 | (d)Temporary Employment- During Operation | 500 | (e)No. of working days | 330 | (f)Total Manpower | 2550 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 123 | 50 | 173 | (2.) | Percentage of Total Project Area | 31 | 12 | 43 | (3.) | No. of Plants | 207000 | 93000 | 300000 | (4.) | Funds Allocated | 49800000 | 28800000 | 78600000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Sourcing of power from captive power plant will help in efficient operations and reduction in transmission losses and allied emissions.
Use of biomass as a fuel in CCPP to the extent of its availability will help in reducing carbon footprint. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Thermal Projects |
|
1. | Specifications of Plant: | (a) Technology Proposed | Combined cycle PP | (b) Plant Load Factor(%) | 95 | (c) Station Heat Rate (Kcal/Kwh) | 1850 | (d) Steam Rate/Flow Rate | 275 | (e) Boiler Temperature | 350 | (f) Boiler Pressure | 85 | (g) Type of Stack | Single flue | (h) No. of Stacks | 6 | |
|
S. No. | Stack ID | Stack Height (m) | Stack Diameter at exit (m) | Exit Velocity of Stack Gas (m/s) | Exit Temperature of Stack Gas (Degree Celsius) |
---|
(1.) | 1 | 60 | 3.1 | 16 | 187 | (2.) | 2 | 60 | 3.1 | 16 | 187 | (3.) | 3 | 60 | 3.1 | 16 | 187 | (4.) | 4 | 60 | 3.1 | 16 | 187 | (5.) | 5 | 60 | 3.1 | 16 | 187 | (6.) | 6 | 60 | 3.1 | 16 | 187 | |
|
2. Details of Fuel Linkage |
---|
S. No. | Type of Fuel | Type of Linkage | Other Type of Linkage | Details | Characteristics |
---|
(1.) | Liquid Fuel (Naphtha/HSD/C9) | Captive | | Source of Linkage : | Indigenous | Quantity of Linkage Granted : | 187 | Date of Linkage : | 01 Jan 2000 | Duration of Linkage : | 30 |
| Gross Calorific Value (Kcal/Kg) : | 10000 | Ash Content (%) : | 0 | Sulphur Content (%) : | 0.5 | Moisture (%) : | 0 | Mercury (mg/kg) : | 0 | Fixed Carbon (%) : | 80 | Volatile Matter (%) : | 0 |
| (2.) | Natural Gas | Open Market | | Source of Linkage : | Indigenous / Import | Quantity of Linkage Granted : | 145665 | Date of Linkage : | 01 Jan 2000 | Duration of Linkage : | 30 |
| Gross Calorific Value (Kcal/Kg) : | 9500 | Ash Content (%) : | 0 | Sulphur Content (%) : | 0 | Moisture (%) : | 0 | Mercury (mg/kg) : | 0 | Fixed Carbon (%) : | 74 | Volatile Matter (%) : | 100 |
| |
|
3. Details of Transportation of Fuel |
---|
S. No. | Fuel | Rail | Road | Pipe Conveyor | Conveyor Belt | Arial Ropeway | Other Mode of Transportation | Total Distance | Total Quantity |
---|
(1.) | Liquid Fuel (Naphtha/HSD/C9) | | Distance : | 350 | Quantity : | 187 |
| | | | | 350 | 187 | (2.) | Natural Gas | | | | | | Distance : | 1 | Quantity : | 145665 |
| 1 | 145665 | |
TOTAL | Distance : 0 Quantity : 0 | Distance : 350 Quantity : 187 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 1 Quantity : 145665 | |
|
4. | Details of Cooling System: | (a) Type of Cooling System | Water Cooled | (b) Type of Draft | Forced Draft | (c) Type of Air Circulation | Counter Flow | (d) Cycle of Cooling (COC) | 5 | (e) Water Req. For Cooling (m3/day) | 6000 | (f) Boiler Blow Down Temperature | 45 | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/2023/IA0062 | (ii)Name of the EIA Consultant | Aqua-Air Environmental Engineers Pvt. Ltd. | (iii)Address | 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJ.) INDIA | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246085 | (vi)Email Id | aquaair_surat@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Thermal Projects | (ix)Validity of Accreditation | 07 Oct 2023 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Prashant Gogate | Designation | Sr VP | Name of Company (Applicant Name should not be given here) | MS RELIANCE INDUSTRIES LIMITED | Address | Reliance Industries Limited,
Hazira Manufacturing Division,
Hazira Industrial Area, Village - Mora, P.O. - Bhatha, District - Surat |
|