Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Banhardih Coal Mining Project of 12 MTPA in mine lease area of 1818.10 ha of to M/s. Patratu Vidyut Utapdan Nigam Limited (PVUNL) located in villages Ate, Banhardih, Bari, Barwadih, Jagaldaga, Rampur, Sabano, Surli, Tota and Udaypura in Latehar & Chandwa tehsils, Latehar District in Jharkhand State
(b)Name of the Company / Organisation PATRATU VIDYUT UTPADAN NIGAM LIMITED
(c)Registered Address Patratu Vidyut Utpadan Nigam Limited. P.O. : PTPS District : Ramgarh.,,Ramgarh,Jharkhand-829119
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Subodh John Purti
(b)Designation (Owner/ Partner/ CEO) Manager
(c)Address Patratu Vidyut Utpadan Nigam Limited. P.O.- PTPS, District - Ramgarh, Pin Code-829119.,,Patratu,Ramgarh,Jharkhand-829119
(d)Pin code 829119
(e)E-mail sjpurti@ntpc.co.in
(f)STD Code. 6553(f)Telephone No. 286041
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/CMIN/268464/2020
(d)Master Proposal Number(Single Window) SW/267780/2022
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 254,249,251,255,250,252,256 (P)
(b)Pincode 829119
(c)Bounded Latitudes (North)
From
Degree 23
Minutes 43
Second 23.48
From
Degree 23
Minutes 45
Second 58.781
(d)Bounded Longitudes (East)
From
Degree 84
Minutes 34
Second 35.146
From
Degree 84
Minutes 39
Second 54.757
(e)Survey of India Topo Sheet No. F45A9 & F45A10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 459
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandLateharChandwaAte, Banhardih, Bari, Barwadih, Jagaldaga, Rampur, Sabano, Surli, Tota and Udaypura in Latehar & Chandwa tehsils
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/13/2020-IA-II(M)
(b)Date of Apply of TOR 26 Jun 2020
(c)Date of Issue of TOR / Standard ToR 02 Oct 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Nov 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Dec 2021
Distance of Public Hearing Venue from the Proposed Project :2.5
Project High School, Sasang, Village-Ate, Panchayat-Bari, Tehsil – Chandwa, District – Latehar
State :Jharkhand
District :Latehar
Tehsil :Chandwa
Village :Sasang
800Air Pollution, water pollution, land acquisition and employment etcOthersAdditional Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Proposed Coal Mine12 MTPACaptive Coal Mine for PVUNL Thermal Power Plant
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal Mine12OthersMTPARail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Dec 2021
(iv)Valid Upto 31 Dec 2021
(v)File No. Not apllicable
(vi)Application No. Not applicable
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6750
(b) Funds Allocated for Environment Management (Capital) (in Crores) 11.73
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 125
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5.86
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not applicable0OthersNANARoad0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2020 To 30 Nov 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube32.011.329.360
(2.)NOxMicro Gram per Meter Cube21.010.020.080
(3.)OthersCOMicro Gram per Meter Cube3341513152000
(4.)PM10Micro Gram per Meter Cube61.627.161.4100
(5.)SO2Micro Gram per Meter Cube16.69.116.460
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l298.634.82501000
(2.)Fluoridemg/l0.720.511.5
(3.)Heavy MetalsArsenicmg/l0.010.010.010.01
(4.)OthersMagnesiummg/l36.89.430100
(5.)pHNA7.666.856.58.5
(6.)TDSmg/l1072.1141.95002000
(7.)Total Hardnessmg/l432.979.7300600
(8.)TSSmg/l005002000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.686.7A
(2.)DOmg/l6.25.6B
(3.)OthersTotal hardnessmg/l229.371.6A
(4.)BODmg/l32.9A
(5.)CODmg/l54.9A
    14.4.     No. of Ambient Noise monitoring locations : 15
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))44.637.855
(2.)Leq(Night)A-weighted decibels(dB(A))41.534.745
    14.5.     No. of Soil Sample Monitored locations : 15
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare132.652.6
(2.)Electric ConductivityOthersMicrosiemens per cm124.538.6
(3.)pH7.415.84
(4.)N(Nitrogen)Kilogram per hectare73.837.6
(5.)K(Potassium)Kilogram per hectare362.5253.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.02 To 6.1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 8.05
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 73710
(f)Date of Issue 18 Apr 2022
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater112500Copy of Permission LetterPipelineOthersBorewells7371018 Apr 202212711.09
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic14721500Activated Sludge ProcessOthersGrenbelt/Plantation14720
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1472
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1472
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Top Soil in McumOthersTop Soil in MCum0.6Tons0RoadOthersPlantation
(2.)Overburden waste generation in Mm3OthersOverburden39.1Tons0RoadOthersBackfilling and external dumping
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube16.60.60.5917.1980
(2.)NOxMicrogram per Meter Cube21.00.68.8629.8680
(3.)PM10Microgram per Meter Cube61.60.519.981.5100
(4.)PM2.5Microgram per Meter Cube32.00.56.3138.3160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setDiesel300.5SO20.03
(2.)DG setDiesel300.5NOx0.87
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 400000
(b)Source 132/33 kV GSS at Chandwa
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 549.48
(b)Private Land (ha.) 561.92
(c)Government Land (ha.) 356.02
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 350.68
    Total Land (ha.) 1818.10
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 21854.5
(b)Waste/Barren Land (ha.) 7030.5
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 5395.5
(e)Settlements (ha.) 2888.5
(f)Industrial (ha.) 163.5
(g)Forest (ha.) 17167.5
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 54500.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area727.24
(2.)Safety Zone7.85
(3.)OB Dump Area440.70
(4.)OthersRoads, Settling Pond etc291.63
Total (ha.) 1467.42
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNil0Not applicable
(2.)NPANil0Not applicable
(3.)ESZsNil0Not applicable
(4.)Wildlife CorridorsNil0Not applicable
(5.)ESAsNil0Not applicable
(6.)Critically Polluted AreaNil0Not applicable
(7.)WLSNil0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestUdaypura P.F0Within Mine Lease Area
(2.)Archaeological SitesNil0NA
(3.)Defence InstallationsNil0NA
(4.)OthersNilNil0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 1467.42
(c)Status of Land acquisition if not acquired 1467.42
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 10
(b)No. of Households 1592
(c)No. of PDFs (Project Displaced Families) 1592
(d)No. of PAFs (Project Affected Families) 1592
(e)Funds Allocated for R&R(in INR) (in Lacs) 116500
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Sloth Bear,Indian Peafowl, Monitor Lizard,Indian rock Python
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 2500000
(iii)Period of Implementation one year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Bagdagga nala (Within Mine lease area, South) , Rajdaha nala (Within Mine lease area, W)
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Bagdagga nala and Rajdaha nala
(ii)Details of Study Conducted Yes
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Auranga River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 1.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 32
(b)Permanent Employment-During Operation 32
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 742
(e)No. of working days 330
(f)Total Manpower 1306
32.
Green Belt in Ha:
(a)Total Area of Green Belt 7.85
(b)Percentage of Total Project Area 0.43
(c)No. of Plants to be Planted 1100000
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialDirect and Indirect employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Coal MiningMajor
2.
Mine Capacity in ROM (Run of Mine) 12 Million tonnes per annum
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. CC/MP/MC/102/2021-22/Banhardih
(b)Date of Approval 15 Jul 2021
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 1467.42
(f)Approved Capacity 12000000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 1234.98
(b)Mineable Reserves (Million Ton) 270.81
(c)Extractable Reserves(Million Ton) 250.50
(d)Percent(%) of Extraction 62.38
(e)Grade of Coal /Ore /Mineral G11
(f)Stripping Ratio 1 : 4.68
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 30
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 2
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1500
(2.)2500
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 18
(c)Thickness of seams to be worked on 4.5
(d)Maximum Thickness of Seams (metres) 2.2
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1467.42
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Central Public Sector Unit
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Not Applicable for CPSU
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Not Applicable
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 2
(ii)Total Area (in Hectare) 467.14
(iii)Height (in meter) 60
(iv)Quantity (in Million Cubic meter) 322.76
(v)No. of year back fill up 6
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 727.24
(iii)Height (in meter) 30
(iv)Quantity (in Million Cubic meter) 832.30
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 17.94
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 17.94
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 727.24
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumpers
(b)Surface to Siding/Loading Dumpers by Road
(c)Transportation / Conveyor Details Combination of Road & conveyor
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND425.620425.62
(2.)GRAZING LAND000
(3.)WASTE LAND359.730359.73
(4.)SURFACE WATER BODIES41.44041.44
(5.)SETTLEMENTS000
(6.)OTHERS(Specify)Roads & common resources91.15091.15
(7.)FOREST LAND549.480549.48
TOTAL1467.4201467.42
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS727.2400727.24
(2.)GREEN BELT7.85007.85
(3.)EXCAVATION/QUARRY0000
(4.)TOP SOIL STORAGE12.240012.24
(5.)ROADS0033.2433.24
(6.)BUILT UP AREA (COLONY/OFFICE)0000
(7.)VIRGIN AREA00219.68219.68
(8.)EXTERNAL OB DUMPS467.1700467.17
TOTAL1214.50252.9201467.42
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 467.14
(b)Internal Dump(in hectare) 727.24
(c)Quarry(in hectare) 727.24
(d)Safety Zone(in hectare) 7.85
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 1167.51
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/21/2194
(ii)Name of the EIA Consultant Vimta Labs Ltd
(iii)Address 142, IDA, Phase II, Cherlapally Hyderabad - 500 051
(iv)Mobile No. 9000711309
(v)Landline No. 0402726414
(vi)Email Id janardhan@vimta.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 27 May 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAOn examination of application, following may be supplemented ; 1. Topo sheet and KML file both is inadequately attached. KML file should be uploaded properly with proper coordinate of ML area. 2. As per the TOR condition, Current status of FC-1 stage may be provided with copy of application filed for permission. 3. As per the TOR letter, a copy of letter from DFO to be submitted that site does not fall in wildlife corridor. The same may be provided. 10 May 2022
2. Eds Reply LetterPlease find the attachment of EDS Response 18 May 2022
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSubodh John Purti
DesignationManager
Name of Company (Applicant Name should not be given here)PATRATU VIDYUT UTPADAN NIGAM LIMITED
AddressPatratu Vidyut Utpadan Nigam Limited. P.O. : PTPS District : Ramgarh.
Print