|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | 1x660 MW Amarkantak Supercritical Thermal Power Project (Expansion) in place of existing Amarkantak Thermal Power Station (Phase – I &II: 290 MW), Chachai Village, Anuppur District, Madhya Pradesh | (b)Name of the Company / Organisation | MP POWER GENERATING COMPANY LTD JABALPUR | (c)Registered Address | Madhya Pradesh Power Generating Company Ltd., Block-9, Shakti Bhavan: Jabalpur- 482008,,Jabalpur,Madhya Pradesh-482008 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | B L NEWAL | (b)Designation (Owner/ Partner/ CEO) | Executive Director (PRG) | (c)Address | MPPGCL, Shed No 1, 2 Vidyut Nagar, Rampur, Jabalpur (MP),,,Jabalpur,Madhya Pradesh-482008 | (d)Pin code | 482008 | (e)E-mail | edprgmpebatps@gmail.com | (f)STD Code. | 761(f)Telephone No. | 2925650 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(d) Thermal Power Plants
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MP/THE/10749/2003 | (d)Master Proposal Number(Single Window) | SW/255728/2022 | (e)EAC concerned (for category A Projects only) | Thermal Projects | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Within the premises of existing ATPS site | (b)Pincode | 484220 | (c)Bounded Latitudes (North) | | From | | Degree | 23 | Minutes | 9 | Second | 22.1 | From | | Degree | 23 | Minutes | 10 | Second | 08.5 | (d)Bounded Longitudes (East) | | From | | Degree | 81 | Minutes | 37 | Second | 53.7 | From | | Degree | 81 | Minutes | 38 | Second | 45.8 | (e)Survey of India Topo Sheet No. | F44D11 & F44D12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 498 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 1.8 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Anuppur | Anuppur | Chachai Village | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J.13011/20/2002-IA.II(T) | (c)Date of Issue of TOR | | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 02 Nov 2003 | (c)Date of Issue of EC | 29 Apr 2004 | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 17 Dec 2020 | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| near the site of thermal power station in the Government High School, Gram Panchayat Kelhauri, Tehsil and District Anuppur MP | State : | Madhya Pradesh | District : | Anuppur | Tehsil : | Anuppur | Village : | Chachai Village |
| 100 | Response with action plan for comments & suggestions received are given in section 7.8 of chapter 7 in EIA report | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 4-1/2004/(ENV)/233 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 13 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Thermal Power Plant of 1x660 MW | 210 | 660 | 870.000 | Mega Watt(MW) | | Others | Transmission Lines | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Thermal Power Plant | 210 | 660 | 870 | 1x660MW unit is proposed in place of decommissioned units of total capacity 290MW | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 29 Jul 2021 | (iv)Valid Upto | 28 Feb 2022 | (v)File No. | 113134 | (vi)Application No. | 1082023-19/05/2021 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 4665.87 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 768.75 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 15.7 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 46.13 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2542000 | (b)Existing quantity of raw material/fuel | 933000 | (c)Total quantity of raw material/fuel | 3475000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coal | 2542000 | Tons per Annum | | M/s. South Eastern Coalfields Limited (SECL) | Rail | | 50 | LOA | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Apr 2019 To 22 Jun 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 11 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 45.9 | 27.5 | 45.9 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 17.1 | 7.9 | 17.1 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 68.6 | 46.5 | 68.6 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 26.3 | 16.4 | 26.3 | 80 | (5.) | Others | CO | Micro Gram per Meter Cube | 940 | 540 | 940 | 2000 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 762 | 214 | 500 | 2000 | (2.) | Fluoride | | | mg/l | | 0.5 | 0.5 | 1 | 1.5 | (3.) | pH | | | NA | | 7.8 | 6.8 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 32 | 10 | 0 | 0 | (5.) | Chlorides | | | mg/l | | 158 | 22 | 250 | 1000 | (6.) | Heavy Metals | | Pb | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (7.) | Total Hardness | | | mg/l | | 528 | 132 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 70 | 10 | D | (2.) | DO | | mg/l | | 4.4 | 2.8 | E | (3.) | pH | | NA | | 7.8 | 7.3 | A | (4.) | BOD | | mg/l | | 18 | 3 | D | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.3 | 49.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 47.9 | 39.9 | 70 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.4 | 6.4 | (2.) | N(Nitrogen) | Kilogram per hectare | | 325 | 249 | (3.) | P(Phosphorus) | Kilogram per hectare | | 24.6 | 10.8 | (4.) | K(Potassium) | Kilogram per hectare | | 161 | 60 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 211 | 73 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 30 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 02 To 16 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 12000 | 0 | Not Appliacble | Pipeline | | Others | Pipeline | 31 /th/Amarkantak/ 2003/190 | 07 Mar 2020 | 14110 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Effluent from SSF, ESP, FGD, Oil waste, etc. | 2304 | 3360 | Oil separator, Sedimentation (AHP) | Reuse within the Plant & Recycling | | 2304 | | (2.) | Effluent DM, TG, Boiler wash, CT blowdown, etc. | 1056 | 1320 | ETP/CMB | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 1056 | | (3.) | Sewage | 6.1 | 10 | STP | Green Belt Renewal Plant | | 6.1 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 3366.1 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 3366.1 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Municipal Solid Waste | Municipal Solid Waste | | 37 | Tons | 10 | Road | | Authorized Recyclers | | (2.) | Total Ash | Others | Total Ash | 1605079 | Tons | 1.1 | Others | Ash pipeline | Others | Sale/Auction | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 45.9 | 1.3 | 0.25 | 46.15 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 17.1 | 1.3 | 1.3 | 18.5 | 80 | (3.) | NOx | | Microgram per Meter Cube | 26.3 | 1.3 | 1.3 | 27.6 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 68.6 | 1.3 | 0.42 | 69.02 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | TPP (1x660 MW) stack | Coal | 100 | 4.0 | PM10 | | 69.02 | (2.) | TPP (1x660 MW) stack | Coal | 100 | 4.0 | NOx | | 27.6 | (3.) | TPP (1x660 MW) stack | Coal | 100 | 4.0 | SO2 | | 18.5 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | Inhouse/MPEB station | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 6.171 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 84.069 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 90.24 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 84.069 | (g)Forest (ha.) | 6.171 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 90.2400 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 30.92 | | (2.) | Main Plant | | 8.50 | | (3.) | Others | Infrastructure & Miscellaneous | 50.82 | Infrastructure & Miscellaneous | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | None | 0 | None within the study area | (2.) | ESAs | None | 0 | None within the study area | (3.) | Corridors | None | 0 | None within the study area | (4.) | Critically Polluted Area | None | 0 | None within the study area | (5.) | NPA | None | 0 | None within the study area | (6.) | ESZs | None | 0 | None within the study area | (7.) | Wildlife Corridors | None | 0 | None within the study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Burhar RF | 0 | Adjacent (North) | (2.) | Archaeological Sites | | None | 0 | None within the study area | (3.) | Defence Installations | | None | 0 | None within the study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 586 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 90.24 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Under possession of Project Proponent | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chachai lake | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 100 | (b)Permanent Employment-During Operation | 200 | (c)Temporary Employment- During Construction | 3000 | (d)Temporary Employment- During Operation | 200 | (e)No. of working days | 365 | (f)Total Manpower | 3500 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 22.70 | 30.92 | 53.620000000000005 | (2.) | Percentage of Total Project Area | 34 | 34 | 68 | (3.) | No. of Plants | 30000 | 61469 | 91469 | (4.) | Funds Allocated | 0 | 1.75 | 1.75 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Proposed project shall have a comprehensive EMP develop as part of EIA. Proper protective & mitigative measures will be implemented to minimize any impact due to proposed activity | (2.) | Social | Project will have positive impact on socioeconomic environment in study area by generating new direct and indirect jobs with improve standard of living and quality of life. | (3.) | Financial | Project proposed to invest about 4665 crores as part of project development activities. This will generate considerable number of direct and indirect jobs for local people thereby increasing economic activity and financial capabilities of stakeholders/people living in the study area | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Thermal Projects |
|
1. | Specifications of Plant: | (b) Technology Proposed | Supercritical | (b) Plant Load Factor(%) | 85 | (c) Station Heat Rate (Kcal/Kwh) | 2292 | (d) Steam Rate/Flow Rate | 1890 | (e) Boiler Temperature | 593 | (f) Boiler Pressure | 247 | (g) Type of Stack | Single flue | (h) No. of Stacks | 1 | |
|
S. No. | Stack ID | Stack Height (m) | Stack Diameter at exit (m) | Exit Velocity of Stack Gas (m/s) | Exit Temperature of Stack Gas (Degree Celsius) |
---|
(1.) | 660 | 100 | 4 | 25 | 100 | |
|
2. Details of Fuel Linkage |
---|
S. No. | Type of Fuel | Type of Linkage | Other Type of Linkage | Details | Characteristics |
---|
(1.) | Coal | LOA | | Source of Linkage : | M/s. South Eastern Coalfields Limited (SECL) | Quantity of Linkage Granted : | 2542000 | Date of Linkage : | 20 Dec 2019 | Duration of Linkage : | Long term supply |
| Gross Calorific Value (Kcal/Kg) : | 3200 | Ash Content (%) : | 45.60 | Sulphur Content (%) : | 0.44 | Moisture (%) : | 15.0 | Mercury (mg/kg) : | 0 | Fixed Carbon (%) : | 20.0 | Volatile Matter (%) : | 19.4 |
| |
|
3. Details of Transportation of Fuel |
---|
S. No. | Fuel | Rail | Road | Pipe Conveyor | Conveyor Belt | Arial Ropeway | Other Mode of Transportation | Total Distance | Total Quantity |
---|
(1.) | Coal | Distance : | 50 | Quantity : | 2542000 |
| | | | | | 50 | 2542000 | |
TOTAL | Distance : 50 Quantity : 2542000 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | |
|
4. | Details of Cooling System: | (a) Type of Cooling System | Air Cooled | (b) Type of Draft | Natural Draft | (c) Type of Air Circulation | Parallel Flow | (d) Cycle of Cooling (COC) | 5 | (e) Water Req. For Cooling (m3/day) | 95 | (f) Boiler Blow Down Temperature | 30 | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/SA 0134 | (ii)Name of the EIA Consultant | Ramky Enviro Services Private Limited | (iii)Address | 12th Floor, Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad-32 | (iv)Mobile No. | 9949991029 | (v)Landline No. | 0402301500 | (vi)Email Id | vvijaykumar@resustainability.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Thermal Projects | (ix)Validity of Accreditation | 21 May 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | With reference to MoM of 31st EAC meeting held on 11-10-2022, we hereby submitting pointwise replies of ADS2 dated 22-10-2022, kindly consider our proposal in the next EAC meeting for a further grant of EC. | 27 Dec 2022 | 2. | NA | deferred | 22 Oct 2022 | 3. | ADS Reply Letter | With reference to MoM of 23rd EAC meeting held on 07-04-2022, we hereby submitting pointwise replies of ADS, kindly consider our proposal in the next EAC meeting for a further grant of EC. | 28 Sep 2022 | 4. | NA | deferred | 26 Apr 2022 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | B L NEWAL | Designation | Executive Director (PRG) | Name of Company (Applicant Name should not be given here) | MP POWER GENERATING COMPANY LTD JABALPUR | Address | Chief Engineer (PRG), MPPGCL, SHED No. 1&2, Rampur, Jabalpur |
|