Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) 1x660 MW Amarkantak Supercritical Thermal Power Project (Expansion) in place of existing Amarkantak Thermal Power Station (Phase – I &II: 290 MW), Chachai Village, Anuppur District, Madhya Pradesh
(b)Name of the Company / Organisation MP POWER GENERATING COMPANY LTD JABALPUR
(c)Registered Address Madhya Pradesh Power Generating Company Ltd., Block-9, Shakti Bhavan: Jabalpur- 482008,,Jabalpur,Madhya Pradesh-482008
(d)Legal Status of the Company State PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant B L NEWAL
(b)Designation (Owner/ Partner/ CEO) Executive Director (PRG)
(c)Address MPPGCL, Shed No 1, 2 Vidyut Nagar, Rampur, Jabalpur (MP),,,Jabalpur,Madhya Pradesh-482008
(d)Pin code 482008
(e)E-mail edprgmpebatps@gmail.com
(f)STD Code. 761(f)Telephone No. 2925650
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(d) Thermal Power Plants
Minor Activity
(b)Category A
(c)Proposal Number IA/MP/THE/10749/2003
(d)Master Proposal Number(Single Window) SW/255728/2022
(e)EAC concerned (for category A Projects only) Thermal Projects
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Within the premises of existing ATPS site
(b)Pincode 484220
(c)Bounded Latitudes (North)
From
Degree 23
Minutes 9
Second 22.1
From
Degree 23
Minutes 10
Second 08.5
(d)Bounded Longitudes (East)
From
Degree 81
Minutes 37
Second 53.7
From
Degree 81
Minutes 38
Second 45.8
(e)Survey of India Topo Sheet No. F44D11 & F44D12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 498
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshAnuppurAnuppurChachai Village
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J.13011/20/2002-IA.II(T)
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 02 Nov 2003
(c)Date of Issue of EC 29 Apr 2004
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Nov 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Dec 2020
Distance of Public Hearing Venue from the Proposed Project :2
near the site of thermal power station in the Government High School, Gram Panchayat Kelhauri, Tehsil and District Anuppur MP
State :Madhya Pradesh
District :Anuppur
Tehsil :Anuppur
Village :Chachai Village
100Response with action plan for comments & suggestions received are given in section 7.8 of chapter 7 in EIA reportOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 4-1/2004/(ENV)/233
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 13 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Thermal Power Plant of 1x660 MW210660870.000Mega Watt(MW)OthersTransmission Lines
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Thermal Power Plant2106608701x660MW unit is proposed in place of decommissioned units of total capacity 290MW
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Jul 2021
(iv)Valid Upto 28 Feb 2022
(v)File No. 113134
(vi)Application No. 1082023-19/05/2021
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4665.87
(b) Funds Allocated for Environment Management (Capital) (in Crores) 768.75
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 15.7
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 46.13
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2542000
(b)Existing quantity of raw material/fuel 933000
(c)Total quantity of raw material/fuel 3475000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal2542000Tons per AnnumM/s. South Eastern Coalfields Limited (SECL)Rail50 LOACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2019 To 22 Jun 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube45.927.545.960
(2.)SO2Micro Gram per Meter Cube17.17.917.180
(3.)PM10Micro Gram per Meter Cube68.646.568.6100
(4.)NOxMicro Gram per Meter Cube26.316.426.380
(5.)OthersCOMicro Gram per Meter Cube9405409402000
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l7622145002000
(2.)Fluoridemg/l0.50.511.5
(3.)pHNA7.86.86.58.5
(4.)TSSmg/l321000
(5.)Chloridesmg/l158222501000
(6.)Heavy MetalsPbmg/l0.010.010.010.01
(7.)Total Hardnessmg/l528132200600
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l7010D
(2.)DOmg/l4.42.8E
(3.)pHNA7.87.3A
(4.)BODmg/l183D
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.349.575
(2.)Leq(Night)A-weighted decibels(dB(A))47.939.970
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.46.4
(2.)N(Nitrogen)Kilogram per hectare325249
(3.)P(Phosphorus)Kilogram per hectare24.610.8
(4.)K(Potassium)Kilogram per hectare16160
(5.)Electric ConductivityMillisiemens per Centimetre21173
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 02 To 16
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface120000 Not Appliacble PipelineOthersPipeline31 /th/Amarkantak/ 2003/19007 Mar 202014110
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Effluent from SSF, ESP, FGD, Oil waste, etc.23043360Oil separator, Sedimentation (AHP)Reuse within the Plant & Recycling2304
(2.)Effluent DM, TG, Boiler wash, CT blowdown, etc.10561320ETP/CMBReuse within the Plant & Recycling,Green Belt Renewal Plant1056
(3.)Sewage6.110STPGreen Belt Renewal Plant6.1
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3366.1
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3366.1
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid WasteMunicipal Solid Waste37Tons10RoadAuthorized Recyclers
(2.)Total AshOthersTotal Ash1605079Tons1.1OthersAsh pipelineOthersSale/Auction
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube45.91.30.2546.1560
(2.)SO2Microgram per Meter Cube17.11.31.318.580
(3.)NOxMicrogram per Meter Cube26.31.31.327.680
(4.)PM10Microgram per Meter Cube68.61.30.4269.02100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)TPP (1x660 MW) stackCoal1004.0PM1069.02
(2.)TPP (1x660 MW) stackCoal1004.0NOx27.6
(3.)TPP (1x660 MW) stackCoal1004.0SO218.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source Inhouse/MPEB station
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 6.171
(b)Private Land (ha.) 0
(c)Government Land (ha.) 84.069
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 90.24
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 84.069
(g)Forest (ha.) 6.171
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 90.2400
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt30.92
(2.)Main Plant8.50
(3.)OthersInfrastructure & Miscellaneous50.82Infrastructure & Miscellaneous
Total (ha.) 90.24
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0None within the study area
(2.)ESAsNone0None within the study area
(3.)CorridorsNone0None within the study area
(4.)Critically Polluted AreaNone0None within the study area
(5.)NPANone0None within the study area
(6.)ESZsNone0None within the study area
(7.)Wildlife CorridorsNone0None within the study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBurhar RF0Adjacent (North)
(2.)Archaeological SitesNone0None within the study area
(3.)Defence InstallationsNone0None within the study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 586
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 90.24
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Under possession of Project Proponent
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chachai lake
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 3000
(d)Temporary Employment- During Operation 200
(e)No. of working days 365
(f)Total Manpower 3500
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt22.7030.9253.620000000000005
(2.)Percentage of Total Project Area343468
(3.)No. of Plants300006146991469
(4.)Funds Allocated01.751.75
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProposed project shall have a comprehensive EMP develop as part of EIA. Proper protective & mitigative measures will be implemented to minimize any impact due to proposed activity
(2.)SocialProject will have positive impact on socioeconomic environment in study area by generating new direct and indirect jobs with improve standard of living and quality of life.
(3.)FinancialProject proposed to invest about 4665 crores as part of project development activities. This will generate considerable number of direct and indirect jobs for local people thereby increasing economic activity and financial capabilities of stakeholders/people living in the study area
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Thermal Projects
S. No.Item Details
1.
Specifications of Plant:
(b) Technology Proposed Supercritical
(b) Plant Load Factor(%) 85
(c) Station Heat Rate (Kcal/Kwh) 2292
(d) Steam Rate/Flow Rate 1890
(e) Boiler Temperature 593
(f) Boiler Pressure 247
(g) Type of Stack Single flue
(h) No. of Stacks 1
S. No. Stack ID Stack Height (m) Stack Diameter at exit (m) Exit Velocity of Stack Gas (m/s) Exit Temperature of Stack Gas (Degree Celsius)
(1.)660100425100
      2.        Details of Fuel Linkage
S. No.Type of Fuel Type of Linkage Other Type of Linkage DetailsCharacteristics
(1.)CoalLOA
Source of Linkage :M/s. South Eastern Coalfields Limited (SECL)
Quantity of Linkage Granted :2542000
Date of Linkage :20 Dec 2019
Duration of Linkage :Long term supply
Gross Calorific Value (Kcal/Kg) :3200
Ash Content (%) :45.60
Sulphur Content (%) :0.44
Moisture (%) :15.0
Mercury (mg/kg) :0
Fixed Carbon (%) :20.0
Volatile Matter (%) :19.4
     3.       Details of Transportation of Fuel
S. No.Fuel Rail RoadPipe ConveyorConveyor BeltArial RopewayOther Mode of TransportationTotal DistanceTotal Quantity
(1.)Coal
Distance :50
Quantity :2542000
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
502542000
TOTAL Distance : 50
Quantity : 2542000
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
4.
Details of Cooling System:
(a) Type of Cooling System Air Cooled
(b) Type of Draft Natural Draft
(c) Type of Air Circulation Parallel Flow
(d) Cycle of Cooling (COC) 5
(e) Water Req. For Cooling (m3/day) 95
(f) Boiler Blow Down Temperature 30
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/SA 0134
(ii)Name of the EIA Consultant Ramky Enviro Services Private Limited
(iii)Address 12th Floor, Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad-32
(iv)Mobile No. 9949991029
(v)Landline No. 0402301500
(vi)Email Id vvijaykumar@resustainability.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Thermal Projects
(ix)Validity of Accreditation 21 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWith reference to MoM of 31st EAC meeting held on 11-10-2022, we hereby submitting pointwise replies of ADS2 dated 22-10-2022, kindly consider our proposal in the next EAC meeting for a further grant of EC. 27 Dec 2022
2.NA

deferred

22 Oct 2022
3. ADS Reply LetterWith reference to MoM of 23rd EAC meeting held on 07-04-2022, we hereby submitting pointwise replies of ADS, kindly consider our proposal in the next EAC meeting for a further grant of EC. 28 Sep 2022
4.NA

deferred

26 Apr 2022
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantB L NEWAL
DesignationExecutive Director (PRG)
Name of Company (Applicant Name should not be given here)MP POWER GENERATING COMPANY LTD JABALPUR
AddressChief Engineer (PRG), MPPGCL, SHED No. 1&2, Rampur, Jabalpur
Print