Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Gevra Opencast Coal Mine
(b)Name of the Company / Organisation SOUTH EASTERN COALFIELDS LIMITED
(c)Registered Address SOUTH EASTERN COALFIELDS LIMITED, SECL BHAVAN, SEEPAT ROAD BILASPUR (C.G.) PIN 495006,SOUTH EASTERN COALFIELDS LIMITED, SECL BHAVAN, SEEPAT ROAD BILASPUR (C.G.) PIN 495006,Bilaspur,Chhattisgarh-495006
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Akshay Shrikant Bapat
(b)Designation (Owner/ Partner/ CEO) GENERAL MANAGER(ENVIRONMENT)
(c)Address NIL
(d)Pin code 495006
(e)E-mail gmenvtsecl@gmail.com
(f)STD Code. 7752(f)Telephone No. 246324
(g)Fax No. 246324
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/CMIN/179634/2020
(d)Master Proposal Number(Single Window) SW/179632/2020
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. SOI toposheet no. 64 J /11 Villages Gevra, Mangaon
(b)Pincode 495452
(c)Bounded Latitudes (North)
From
Degree 221800
Minutes
Second
From
Degree 222142
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 823200
Minutes
Second
From
Degree 823930
Minutes
Second
(e)Survey of India Topo Sheet No. 64 J/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 328
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 7115
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 24 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Opencast Coal mining (49.00 MTPA/4184.486 ha)45.004.0049OthersMTPARoad,Rail,Conveyor Belt
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Opencast mine surface miner silos45449Expansion under Clause 7ii and OM dated 15 sept 2017
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 08 Feb 2021
(iv)Valid Upto 28 Feb 2022
(v)File No. 9690
(vi)Application No. 6396450
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 11816.40
(b) Funds Allocated for Environment Management (Capital) (in Crores) 142.82
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 22.852
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 10.32
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 30705
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 30705
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)POL1.67Kilo Litre per DayNARoad195 MoUCopy of Linkage
(2.)Explosives30705Tons per AnnumNARoad5 MoUCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 14.60 To 5.76
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.98 To 2.30
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA/NOC/MIN/ORIG/2018/4474
(f)Date of Issue 22 Jan 2019
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMine Seepage Water83343Copy of Permission LetterPipelineOthersPumpingCGWA/NOC/MIN/ORIG/2018/447422 Jan 201911487.60
(2.)Surface28597.2Copy of Permission LetterPipelineBarrage81639807 Feb 20113500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial180210Effluent Treatment plantReuse within the Plant & Recycling180
(2.)Domestic Effluent24223000Domestic Effluent treatment plantGreen Belt Renewal Plant2422
(3.)Process28633500000Sedimentation and settling pondsOthersUtilized for Dust suppression except rainy season02863
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 5465
(b)Total Discharged Water (Kilolitre per Day) 2863
(c)Total Reused Water (Kilolitre per Day) 2602
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BMW under yellow white and blue categoryBio-Medical Waste5.70Tons70RoadAuthorized Recyclers
(2.)Waste or residue containing oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)25Tons903RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Over BurdenOthersOver Burden75178600Tons4OthersMine haul road with DumpersOthersBackfilling in internal mine voids
(4.)Used or Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)251.5Kilolitre1100RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube49.000.820.0049.0080
(2.)NOxMicrogram per Meter Cube32.100.820.7532.8580
(3.)PM10Microgram per Meter Cube113.300.826.99120.29100
(4.)PM2.5Microgram per Meter Cube47.500.821.8949.3960
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 35000
(b)Source Chhattisgarh State Power Distribution Company Limi
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Not Applicable
(e)Stack Height (in m) 0.00
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 1016.412
(b)Private Land (ha.) 2520.571
(c)Government Land (ha.) 647.503
(d)Revenue Land (ha.) 0.00
(e)Other Land (ha.) 0.00
    Total Land (ha.) 4184.486
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 2520.571
(b)Waste/Barren Land (ha.) 0.00
(c)Grazing/ Community Land (ha.) 0.00
(d)Surface Water Bodies (ha.) 7.00
(e)Settlements (ha.) 69.280
(f)Industrial (ha.) 0.00
(g)Forest (ha.) 1016.412
(h)Mangroves (ha.) 0.00
(i)Marine Area (ha.) 0.00
(j)Others (ha.) : Government land including waste and grazing land 571.223
    Total (ha.) 4184.4860
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area2032.250
(2.)OB Dump Area480.00External OB Dump
(3.)Township65.00
(4.)Safety Zone418.174
(5.)Built Up Area1184.062Infrastructure RR Site Road etc
(6.)OthersArea for Top soil in quarry5
Total (ha.) 4184.486
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)ESZsNA0NA
(5.)Wildlife CorridorsNA0NA
(6.)CorridorsNA0NA
(7.)Critically Polluted AreaNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBurgahan RF7.24South west direction and Chhindpani PF 9.25 km SW
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4184.48
(b)Land yet to be acquired(Ha) 0.00
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 18
(b)No. of Households 3376
(c)No. of PDFs (Project Displaced Families) 2075
(d)No. of PAFs (Project Affected Families) 3376
(e)Funds Allocated for R&R(in INR) (in Lacs) 45596
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area 7 Ha.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Hasdeo River and Ahiran river
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 4391
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 4391
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1156.321125.522281.84
(2.)Percentage of Total Project Area27.6326.9054.53
(3.)No. of Plants435738339393348296717
(4.)Funds Allocated18986708511545794021344446487
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 45.00 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SECL/BSP/CAD/262 BM/17-18/341
(b)Date of Approval 27 Oct 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department SECL Board
(e)Approved Mining Lease Area 4184.486
(f)Approved Capacity 49.00
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 1940.98
(b)Mineable Reserves (Million Ton) 400.246
(c)Extractable Reserves(Million Ton) 400.246
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral G-10
(f)Stripping Ratio 1.69 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) 1
(h)Average Gradient(Degree) 1 in 6 to 1 in 12
(i)Mining Method Opencast
(j)Life of Mine (Years) 9
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 6
(c)Thickness of seams to be worked on 3.14
(d)Maximum Thickness of Seams (metres) 57.86
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 4184.486
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Not Applicable
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Not Applicable
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Not Applicable
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 07
(ii)Total Area (in Hectare) 480
(iii)Height (in meter) 90
(iv)Quantity (in Million Cubic meter) 147.60
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 08
(ii)Total Area (in Hectare) 1378
(iii)Height (in meter) 90
(iv)Quantity (in Million Cubic meter) 1119.40
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 1.80
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 1.80
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 659.250
(b)Depth (in meter) 40
(c)Volume (in Million Cubic meter) 263.7
12.
Details of Quarry:
(a)Final Void of 659.25 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 2032.250
13.
Details of Transportation:
(a)In Pit/Underground to Surface By dumpers from face to in pit crusher.By Belt Con
(b)Surface to Siding/Loading belt conveyors and silos
(c)Transportation / Conveyor Details Dumpers, belt conveyors, silos and rail.
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND1273.4261247.1452520.571
(2.)SURFACE WATER BODIES707
(3.)GRAZING LAND000
(4.)FOREST LAND441.410575.0021016.412
(5.)SETTLEMENTS069.28069.28
(6.)OTHERS(Specify)Govt land315.414255.809571.223
(7.)WASTE LAND000
TOTAL2037.252147.2364184.486
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0659.2500659.25
(2.)BUILT UP AREA (COLONY/OFFICE)001237.3921237.392
(3.)ROADS0066
(4.)INTERNAL OB DUMPS1378001378
(5.)EXTERNAL OB DUMPS48000480
(6.)VIRGIN AREA418.17400418.174
(7.)TOP SOIL STORAGE0000
(8.)GREEN BELT5.67005.67
TOTAL2281.844659.251243.39204184.486
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 480
(b)Internal Dump(in hectare) 1378
(c)Quarry(in hectare) 2032.250
(d)Safety Zone(in hectare) 418.174
(e)Final Void of 659.25 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 1243.392
(h)Total afforestation plant (in hectare) 2281.844
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)19820050.050
(2.)19870101050
(3.)1988010106.50
(4.)1990010109.70
(5.)19920101013.23.2
(6.)19950101214.624.62
(7.)19970101216.836.83
(8.)19980101217.887.88
(9.)20000101217.297.29
(10.)1985010103.280
(11.)19830050.320
(12.)1989010108.210
(13.)20020101218.978.97
(14.)20040101221.88511.885
(15.)200625252526.461.46
(16.)2010353535350
(17.)2011353535350
(18.)201440404038.700
(19.)2015414141410
(20.)2016414141410
(21.)201945454942.2510
(22.)19910101011.211.21
(23.)19930101213.33.3
(24.)20030101219.549.54
(25.)200825252529.0554.055
(26.)19940101214.044.04
(27.)19990101217.297.29
(28.)200525251226.151.15
(29.)2017414141410
(30.)19840051.430
(31.)1986010104.210
(32.)19960101215.445.44
(33.)20010101218.898.89
(34.)200725252527.222.22
(35.)200925252532.107.10
(36.)2012353535350
(37.)2013353535350
(38.)201845454941.4330
(39.)2020454549450
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Districts Courts
(c)Name of the Sub Court Bilaspur
(d)Case No. 1217/2007
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Next hearing date 25.02.2021
(f)Case Details RO, CECB Korba vs CGM Dipka and Gevra area of SECL
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 0108
(ii)Name of the EIA Consultant Central Mine Planning and Design Institute Limited
(iii)Address Gondwana Place Kanke Road Ranchi 834008 Jharkhand
(iv)Mobile No. 8987789101
(v)Landline No. 0651223005
(vi)Email Id gmenv.cmpdi@coalindia.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 22 Aug 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAkshay Shrikant Bapat
DesignationGENERAL MANAGER(ENVIRONMENT)
Name of Company (Applicant Name should not be given here)SOUTH EASTERN COALFIELDS LIMITED
AddressSOUTH EASTERN COALFIELDS LIMITED, SECL BHAVAN, SEEPAT ROAD BILASPUR (C.G.) PIN 495006
Print