1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Prakasham Khani Opencast Coal Mine
(b)Name of the Company / Organisation The Singareni Collieries Company Limited
(c)Registered Address M/s. Singareni Collieries Company Limited PO: Kothagudem Collieries - 507 101 Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bhaskara Rao B
(b)Designation (Owner/ Partner/ CEO) Director (Planning & Projects)
(c)Address NIL
(d)Pin code 507101
(e)E-mail gm_env@scclmines.com
(f)STD Code. 8744(f)Telephone No. 243059
(g)Fax No. 08744244115
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/TG/CMIN/117465/2019
(d)Master Proposal Number(Single Window) SW/145495/2020
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Manuguru (V), Govt. No.341, Pvt. Land: 14,23,309,3
(b)Pincode 507117
(c)Bounded Latitudes (North) FROM 175536 To 175854
(d)Bounded Longitudes (East) FROM 804416 To 804848
(e)Survey of India Topo Sheet No. 56 C/9 and 56 C/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 448
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaBhadradri KothagudemManuguru
(2.)TelanganaBhadradri KothagudemManuguruManuguru
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/78/2013-IA-II(M)
(b)Date of Apply of TOR 09 Sep 2019
(c)Date of Issue of TOR / Standard ToR 17 Dec 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason PH was already conducted under EIA Notification, 2
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Shovel and dumper combination9.75 MTPA in 2402.40 haNil
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)2402.40 ha9750000Tons per AnnumRail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 20 May 2016
(iv)Valid Upto 30 Jun 2020
(v)File No. 16072161793
(vi)Application No. 16072161793
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1473.63
(b) Funds Allocated for Environment Management (Capital) (in Crores) 160.95
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 18.10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 23100
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 23100
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel240Kilo Litre per DayOil companiesRoad200 MoUCopy of Linkage
(2.)Explosives23100Tons per AnnumKothagudemRoad60 MoUCopy of Linkage
(3.)Power10.92Mega Watt(MW)132 KV SubstationOthersOHT Lines3 LOACopy of Linkage
(4.)Water6508Kilo Litre per DayFrom ProjectOthersPumping2 OthersPumpingCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube199133197.2250
(2.)PM2.5Micro Gram per Meter Cube7240.871.8NS
(3.)SO2Micro Gram per Meter Cube18.110.417.9120
(4.)NOxMicro Gram per Meter Cube25.417.225.1120
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.48.16.58.5
(2.)Fluoridemg/l0.980.3411.5
(3.)Heavy MetalsChromium as Crmg/l000.050
(4.)Total Hardnessmg/l240155200600
(5.)TDSmg/l11602405002000
(6.)TSSmg/l0000
(7.)Chloridesmg/l305752501000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.57.3C
(2.)DOmg/l6.55.8C
(3.)BODmg/l32C
(4.)CODmg/l3220C
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))57.530.570
(2.)Leq(Day)A-weighted decibels(dB(A))6942.375
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.67.2
(2.)Electric ConductivityMillisiemens per Centimetre0.390.37
(3.)P(Phosphorus)Kilogram per hectare2212
(4.)K(Potassium)Kilogram per hectare439302
(5.)N(Nitrogen)Kilogram per hectare252180
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.37 To 9.40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.30 To 8.00
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 5789/HGII(2)/07
(f)Date of Issue 15 Oct 2007
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater65082Copy of Permission LetterPipelineOthersquarry5789/HGII(2)/0715 Oct 200717102
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mine water1710217102Settling pond / ETPOthersTo near by vagu650810594
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 17102
(b)Total Discharged Water (Kilolitre per Day) 10594
(c)Total Reused Water (Kilolitre per Day) 6508
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Top SoilOthersTop soil479340Tons2.5OthersDumpersOthersSpreading on dumps
(2.)Hard OBOthersHard OB126040000Tons2.5OthersDumperOthersStorage in dump
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube199021.10220.11250
(2.)NOxMicrogram per Meter Cube25.4004.0529.46120
(3.)SO2Microgram per Meter Cube18.1002.0620.17120
(4.)PM2.5Microgram per Meter Cube70.50012.9383.44NS
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0-00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10920
(b)Source 132 KV substation
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Nil
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 2214.84
(b)Private Land (ha.) 25.498
(c)Government Land (ha.) 162.062
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2402.40
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 152.243
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 35.317
(f)Industrial (ha.) 0
(g)Forest (ha.) 2214.84
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 2402.4
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area1495.47Nil
(2.)OB Dump Area504.34External Dump
(3.)Safety Zone179.74Road, Bund, Transmission line, Safety zone
(4.)Water Reservoir1.33Nil
(5.)Built Up Area137.98Road and infrastructure
(6.)Green belt28.12Nil
(7.)OthersEmbankment - 33.334, Nallah diversion - 22.08555.42Embankment - 33.334, Nallah diversion - 22.085
Total (ha.) 2402.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsKinnerasani2Nil
(2.)CorridorsNA0Nil
(3.)Critically Polluted AreaNA0Nil
(4.)NPANA0Nil
(5.)ESAsNA0Nil
(6.)Wildlife CorridorsNA0Nil
(7.)WLSNA0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0Nil
(2.)Archaeological SitesNA0Nil
(3.)ForestKondaigudem0Adjacent to the Project
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Final(Stage-II) Approval Obtained
(i)MoEFCC file number FP/TG/MIN/2938/2012
(ii)Date of final approval 24 Apr 2017
(iii)Date of In-Principle Approval 24 Apr 2017
(iv)Area diverted 430.42
(v)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2402.40
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Painted stork, Red sand boa are near Threatened and four horned antelope, Gaur are vulnerable as per IUCN guidelines but are common in occurrence in the study area
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1.56 Crores
(iii)Period of Implementation 2019 to 2022
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. Rc.No.905/2010/M4
(iii)Date of issue 14 Jun 2018
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Gorrepeta Vagu
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required 6.19 km of nallah diversion
(ii)Details of Study Conducted Permission obtained from I&CAD
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. EE/IB/KGM/DB/AEE(T)/1732/M
(iii)Date of issue 28 Mar 2018
(iv)Recommendation Structures are to be reconstructed
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gorrepeta vagu, Kodipunjula vagu, Lothu vagu
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 0.07
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 1458
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 710
(e)No. of working days 365
(f)Total Manpower 2168
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1516.20
(b)Percentage of Total Project Area 63.11
(c)No. of Plants to be Planted 3790500
(d)Funds Allocated for Plantation 60648000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalOf the total 2402.40 ha,1516.99 ha will be reclaimed with plantation and 770.10 ha will be left as water body at the end of post closure stage.
(2.)socialthe social infrastructure in terms of road transport, communication, housing, water suply and sanitation, power, education,banking communication,etc will be improved
(3.)FinencialA substantial percentage of population is dependent on mining industry directly or indirectly. Because of this mining project some of the local population may get direct employment but a substantial impact will be on creation of indirect of opportunities and employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 9.75 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. PCA-38011/6/2019-PC
(b)Date of Approval 07 Oct 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 2402.40
(f)Approved Capacity 10
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 402.01
(b)Mineable Reserves (Million Ton) 309.35
(c)Extractable Reserves(Million Ton) 290.55
(d)Percent(%) of Extraction 72.27
(e)Grade of Coal /Ore /Mineral G8
(f)Stripping Ratio 1 : 7.19
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) I
(h)Average Gradient(Degree) 1 in 5.5 to 1 in 7.5
(i)Mining Method Opencast
(j)Life of Mine (Years) 11
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 15
(c)Thickness of seams to be worked on 45.89
(d)Maximum Thickness of Seams (metres) 1 Seam -7.76, H1Seam-2.94, B1 Seam-1.11, B2Seam-1.5, H2 Seam-6.14, B3 Seam- 2.55, H3 Seam-6.7, H4 TOP-2.6, H4 Bottom-2.23, T S Top-6.6, TS Bottom-9.7, TS(Comb)-23.5, Index seam-3.9, SS1 Seam-7.03, SS2
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 2402.40
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 24 Jun 2019
(iii)Validity of LOI 14
(iv)Reference No. of LOI 636/PR-AI/2019
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 2168.86
(iii)Validity of the lease deed From : 05 Aug 1999 To : 17 May 2046
(iv)Date of Execution of Mining Lese 16 Jul 1999
(v)Reference Number S.L.NO.0021770
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 06 Mar 1999 From : 06 Mar 1999 To : 17 May 2046 Copy of Earlier LeaseG.O M.s.No.13 Dt 18.05.2016 2168.86 All existing leases renewed between this period
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 3
(ii)Total Area (in Hectare) 504.341
(iii)Height (in meter) 120
(iv)Quantity (in Million Cubic meter) 437.22
(v)No. of year back fill up 5
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 2
(ii)Total Area (in Hectare) 783.119
(iii)Height (in meter) 120
(iv)Quantity (in Million Cubic meter) 1063.02
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 7.56
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 7.54
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.02
11.
Details of Final Mine Void:
(a)Area (in Hectare) 712.357
(b)Depth (in meter) 270
(c)Volume (in Million Cubic meter) 831.64
12.
Details of Quarry:
(a)Final Void of 712.357 (hectare) at a Depth of 270 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1495.476
13.
Details of Transportation:
(a)In Pit/Underground to Surface Belt conveyor
(b)Surface to Siding/Loading Belt Conveyor
(c)Transportation / Conveyor Details Rail
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND152.2430152.243
(2.)SETTLEMENTS35.317035.317
(3.)FOREST LAND2214.8402214.84
(4.)WASTE LAND000
(5.)GRAZING LAND000
(6.)SURFACE WATER BODIES000
TOTAL2402.402402.4
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXTERNAL OB DUMPS504.34100504.341
(2.)GREEN BELT28.1160028.116
(3.)OtherEmbankment, Nallah, Reservoir33.33423.434056.768
(4.)VIRGIN AREA0000
(5.)INTERNAL OB DUMPS0000
(6.)ROADS82.29334.21963.231179.743
(7.)TOP SOIL STORAGE0000
(8.)BUILT UP AREA (COLONY/OFFICE)84.996052.96137.956
(9.)EXCAVATION/QUARRY783.119712.35701495.476
TOTAL1516.199770.01116.19102402.4
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 504.341
(b)Internal Dump(in hectare) 783.119
(c)Quarry(in hectare) 1495.476
(d)Safety Zone(in hectare) 179.743
(e)Final Void of 712.357 (hectare) at a Depth of 270 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 137.976
(h)Total afforestation plant (in hectare) 1531.844
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2015..169.759.759.759.000
(2.)2017..189.759.759.755.260
(3.)2016..179.759.759.758.730
(4.)2018..199.759.759.755.200
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0143
(ii)Name of the EIA Consultant EPTRI
(iii)Address 91/4, Gachibowli, Hyderabad
(iv)Mobile No. 9885236493
(v)Landline No. 0406756751
(vi)Email Id dgeptri@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 29 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

            The EAC after deliberation suggested to improve the quality of content first in the EIA/EMP report for example it is reported that pH ranging from 7.3 to 8.5 found in surface water is acidic in nature. Also, sought clarification of land details and availability of forest clearance for said land involved in the project. Further, if the mining is in operation then PP must have obtained Stage-II FC. EAC insisted for detailed view on land and desired that the PP should check .kml file, and Stage II FC in the next sit

06 May 2020
2. ADS LetterSir, Please find the point-wise reply to the ADS dated 06/05/2020 for consideration. 10 Jun 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhaskara Rao B
DesignationDirector (Planning & Projects)
Name of Company (Applicant Name should not be given here)The Singareni Collieries Company Limited
AddressKothagudem P.O -507101 Khammam Dt