Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Construction of Motel Building
(b)Name of the Company / Organisation ANANTRAJ LIMITED
(c)Registered Address H-65, Connaught Circus, New Delhi,,Central,Delhi-110001
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajay Pathania
(b)Designation (Owner/ Partner/ CEO) DGM
(c)Address H-65, Connaught Circus, New Delhi-110001,,Pahar Ganj,Central,Delhi-110001
(d)Pin code 110001
(e)E-mail asheramotel2020@gmail.com
(f)STD Code. 11(f)Telephone No. 43034400
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/143072/2020
(d)Master Proposal Number(Single Window) SW/143070/2020
(e)EAC concerned (for category A Projects only) Infrastructure and Miscellaneous Projects  +  CRZ
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra No. 2 Min (1-1), 3 Min (3-10), 4 Min (4-12)
(b)Pincode 110016
(c)Bounded Latitudes (North) FROM 3151406.65 To 3151434.58
(d)Bounded Longitudes (East) FROM 714126.23 To 714382.67
(e)Survey of India Topo Sheet No. 53H/03
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 260
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.07
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Since, it is a Building Construction Project. Henc
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)No. of Towers01Unit - Number
(2.)No. of Guest Rooms176Unit - Number
(3.)Maximum Height of Building (Upto Terrace Level)67.3Unit - Meters
(4.)Number of Basements03Unit - Number
(5.)Maximum No. of FloorsG+14Not Applicable
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Total Plot Area10875.57OthersSquare MetersOthersNot Applicable
(2.)Total Built-up Area48012.36OthersSquare MetersOthersNot Applicable
(3.)Road Widening Area367.30OthersSquare MetersOthersNot Applicable
(4.)Net Plot Area10508.27OthersSquare MetersOthersNot Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jan 2020
(iv)Valid Upto 29 Feb 2020
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 115
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.87
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.725
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.119
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)000OthersNot Applicable0OthersNot Applicable0.9 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 12 Jan 2020 To 16 Jan 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 01
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCarbon MonoxideMili Gram per Meter Cube1.331.210.332
(2.)PM2.5Micro Gram per Meter Cube140.8138.4139.860
(3.)SO2Micro Gram per Meter Cube8.78.27.780
(4.)PM10Micro Gram per Meter Cube218.3211.5217.3100
(5.)NOxMicro Gram per Meter Cube45.642.844.680
    14.2.     No. of Ground Water monitoring locations : 01
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)pHNA7.56.58.58.5
(3.)Total Hardnessmg/l232232200200
(4.)TDSmg/l830.2500500500
(5.)Chloridesmg/l124124250250
(6.)Fluoridemg/l0.580.5811
(7.)Heavy MetalsLeadmg/l000.010.01
    14.3.     No. of Surface Water monitoring locations : 01
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.97.9E
(2.)BODmg/l77E
(3.)CODmg/l7.97.9E
(4.)DOmg/l3.63.6E
    14.4.     No. of Ambient Noise monitoring locations : 01
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.952.965
(2.)Leq(Night)A-weighted decibels(dB(A))46.746.755
    14.5.     No. of Soil Sample Monitored locations : 01
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram75.675.6
(2.)P(Phosphorus)Milligram per Kilogram18.418.4
(3.)K(Potassium)Milligram per Kilogram26.826.8
(4.)pH7.687.68
(5.)Electric ConductivityOthersMicroseimens per centimeter312.6312.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.05 To 6.44
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.05 To 6.11
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPipeline1730Copy of Permission LetterPipelineOthersPipeline001 Jan 2020173
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Flushing etc.224280Sewage Treatment PlantReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersWater Losses- 20 KLD18242
(2.)Laundry810Effluent Treatment PlantOthersSupply to Sewage Treatment Plant71
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 232
(b)Total Discharged Water (Kilolitre per Day) 43
(c)Total Reused Water (Kilolitre per Day) 189
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Non-Biodegradable WasteMunicipal Solid Waste71Tons10RoadAuthorized Recyclers
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.43Kilolitre10RoadAuthorized Recyclers
(3.)Biodegradable WasteMunicipal Solid Waste95Tons10RoadOthersOrganic Waste Convertor
(4.)Plastic WasteMunicipal Solid Waste71Tons10RoadAuthorized Recyclers
(5.)E-WasteE Waste0.02Tons10RoadAuthorized Recyclers
(6.)Battery WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.06Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube45.60.91.0046.780
(2.)SO2Microgram per Meter Cube8.70.90.39.180
(3.)PM2.5Microgram per Meter Cube140.80.90.5141.460
(4.)Others(Specify)Carbon MonoxideMicrogram per Meter Cube13300.910014402000
(5.)PM10Microgram per Meter Cube218.30.90.7219.1100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (2x750 kVA)LSD300.3PM100.025
(2.)DG Set (2x750 kVA)LSD300.3OthersCO0.15
(3.)DG Set (2x1010 kVA)LSD300.3PM100.370
(4.)DG Set (2x1010 kVA)LSD300.3SO20.075
(5.)DG Set (2x1010 kVA)LSD300.3OthersCO0.55
(6.)DG Set (2x1010 kVA)LSD300.3OthersPM2.50.175
(7.)DG Set (2x1010 kVA)LSD300.3NOx0.70
(8.)DG Set (2x750 kVA)LSD300.3SO20.09
(9.)DG Set (2x750 kVALSD300.3OthersPM2.50.010
(10.)DG Set (2x750 kVA)LSD300.3NOx0.175
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3576
(b)Source BSES Rajdhani Power Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x750 kVA and 2x1010 kVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1.08755
    Total Land (ha.) 1.08755
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Total Plot Area 1.08755
    Total (ha.) 1.08755
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area4.801236
Total (ha.) 4.801236
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0NA
(2.)ESAsNone0NA
(3.)CorridorsNone0NA
(4.)Wildlife CorridorsNone0NA
(5.)Critically Polluted AreaOkhla14.34It is in NE direction of site.
(6.)NPANone0NA
(7.)ESZsAsola Wildlife Sanctuary1.20It is in SE direction of site.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsAirforce Force Station Arjangarh5.38It is in NNW direction of site
(2.)ForestRajokri Protected Forest7.22It is in NW direction of site
(3.)Archaeological SitesMosque4.68It is in NNW direction of site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.08
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Shahpur Nala
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 2.07
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 2426
(e)No. of working days 365
(f)Total Manpower 2626
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.17
(b)Percentage of Total Project Area 15.63
(c)No. of Plants to be Planted 140
(d)Funds Allocated for Plantation 0.08
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1773.63 sqm (680.63 sqm on Ground & 1093.00 sqm) i.e. 16.3 % of total plot area wil be developed as Green Area that will reduce pollution load
(2.)SocialEmployment will be generated.
(3.)FinancialTax and Revenue will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Infrastructure and Miscellaneous Projects  +  CRZ
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 67.3
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 10875.57
(e)Total built up area (sqm) 48012.36
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 3
(d)Capacity 86
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 717
5.
Energy Saving Measures:
(a)Source/Mode Solar Energy, LED etc
(b)Percentage 6
(c)Quantity 193.14
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will be no impact on Water Bodies and Drains
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev 83, 20th January 2020 at S.No.-120
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt Ltd.
(iii)Address 5th Floor, NN Mall, Sector-3, Rohini, New Delhi-110085
(iv)Mobile No. 9871591330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Infrastructure and Miscellaneous Projects  +  CRZ
(ix)Validity of Accreditation 08 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

Kindly see minutes of 50th meeting of EAC (Infra-2)

01 May 2020
2. ADS LetterReply to Query raised in 50th EAC Meeting submitted 24 Jun 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjay Pathania
DesignationDGM
Name of Company (Applicant Name should not be given here)ANANTRAJ LIMITED
AddressH-65, Connaught Circus, New Delhi