Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Adarsh Industrial Chemicals
(b)Name of the Company / Organisation ADARSH INDUSTRIAL CHEMICALS
(c)Registered Address Survey No.343/7A, Murthangady, Sanoor, Karkala taluk, Udupi District - 574114, Karnataka State,,Udupi,Karnataka-574114
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ganesh KamathN
(b)Designation (Owner/ Partner/ CEO) Managingpartner
(c)Address Survey No.343/7A, Murthangady, Sanoor, karkala Taluk, Udupi District - 574114, Karnataka State,,Karkala,Udupi,Karnataka-574114
(d)Pin code 574114
(e)E-mail udupiadarsh123@gmail.com
(f)STD Code. 80(f)Telephone No. 23460102
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/KA/IND2/140706/2018
(d)Master Proposal Number(Single Window) SW/140698/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 343/7
(b)Pincode 574114
(c)Bounded Latitudes (North)
From
Degree 13.095861
Minutes
Second
From
Degree 13.10015
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.593926
Minutes
Second
From
Degree 74.594288
Minutes
Second
(e)Survey of India Topo Sheet No. D43P4, D43016,D43P3, D43015
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 80
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/233/2018-IA-II(I)
(c)Date of Issue of TOR 16 Aug 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 08 Oct 2020
(c)Date of Issue of EC 28 Dec 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :20 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :24 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :1
Sri Rama Mandira Sabha Bhavana
State :Karnataka
District :Udupi
Tehsil :Karkala
Village :Sanoor
101Whether any study is conducted on nearby wells and tanks. Imported raw material cashew nuts contains Endosulphan and it would affect the next generation The report is prepared to show that the IndusOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. AW-306181
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 15 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Expeller for extraction of cashew nut shell liquid3000300OthersTPMRoad
(2.)Recidol204060OthersTPMRoad
(3.)Liquid resin20020OthersTPMRoad
(4.)Adducts08080OthersTPMRoad
(5.)Phenalkamine0120120OthersTPMRoad
(6.)cardanol30120150OthersTPMRoad
(7.)Paints and varnishes06060OthersTPMRoad
(8.)Phenolic resin08080OthersTPMRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Thermic fluid heater111Existing 4 Lakh kilo calories TFH will be expanded to 6 Lakh Kilo calories
(2.)Boiler8500850kg/hr
(3.)Sedimentation tank426Numbers
(4.)DG set125125250KVA
(5.)Electrolysis plant-11To treat Phenalkamine effluent
(6.)CNSL storage tank4 numbers - 400 Ton0400 toncapacity
(7.)Expeller2 x 150 TPM0300 TPM
(8.)Thin Film Evaporator101Number
(9.)Solvents-Stored in barrelsBarrelsStored in barrels
(10.)ETP10 KLD5 KLD15 KLDupgrading and refurbishing the ETP
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 May 2018
(iv)Valid Upto 30 Jun 2022
(v)File No. AW-306181
(vi)Application No. AW-306181
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.71
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.086
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.02
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.069
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 600
(b)Existing quantity of raw material/fuel 300
(c)Total quantity of raw material/fuel 900
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)LAWS oil6OthersKL/mLocal sourcesRoad200 Open MarketCopy of Linkage
(2.)Kerosene6OthersKL/mLocal sourcesRoad200 Open MarketCopy of Linkage
(3.)Hexamine5OthersTPMLocal sourcesRoad200 Open MarketCopy of Linkage
(4.)Xylene3OthersKL/mLocal sourcesRoad200 Open MarketCopy of Linkage
(5.)Ethylene Diamine15OthersTPMLocal sourcesRoad200 Open MarketCopy of Linkage
(6.)Cashew nut shell900OthersTPMLocally procuredRoad34 Open MarketCopy of Linkage
(7.)Turpentine3OthersKL/mLocal sourcesRoad200 Open MarketCopy of Linkage
(8.)Slop oil6OthersKL/mLocal sourcesRoad200 Open MarketCopy of Linkage
(9.)Di ethylene triamine15OthersTPMLocal sourcesRoad200 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 06 Nov 2018 To 25 Jan 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube15.479.8715.0680
(2.)NOxMicro Gram per Meter Cube18.7610.5618.5180
(3.)PM10Micro Gram per Meter Cube56.3249.8749.87100
(4.)PM2.5Micro Gram per Meter Cube29.9120.1220.660
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.57.27.468.5
(2.)TSSmg/l0000
(3.)TDSmg/l310.2105.23102000
(4.)Chloridesmg/l42.641.242.371000
(5.)Fluoridemg/l0000
(6.)Total Hardnessmg/l184130183.36600
(7.)Heavy MetalsLeadmg/l0000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l00B
(2.)pHNA7.367.12B
(3.)BODmg/l00B
(4.)DOmg/l6.25.6B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.950.975-55
(2.)Leq(Night)A-weighted decibels(dB(A))37.432.170-50
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare474386
(2.)pH6.916.01
(3.)P(Phosphorus)Kilogram per hectare11993
(4.)Electric ConductivityOthersmicromhos/cm3723
(5.)N(Nitrogen)Kilogram per hectare289211
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15.2 To 4.1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.7 To 8.6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersOpen well14.50 Not Appliacble PipelineOthersPipe line016 Aug 20180
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste20Septic tank and soak pitOthersSeptic tank and soak pit02
(2.)Industrial waste water510ETP and electrolysis processOthersGreen belt05
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7
(b)Total Discharged Water (Kilolitre per Day) 7
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic solid wasteOthersDomestic solid waste3.17Tons0OthersWithin industry premisesOtherscomposting
(2.)Boiler ashIndustrial Waste5.47Tons0OthersWithin premisesOthersSoil conditioner
(3.)ETP sludgeIndustrial Waste0.07Tons0OthersWithin premisesOthersDried and used as fuel
(4.)Thermic fluid heater ashIndustrial Waste3.6Tons0OthersWithin premisesOthersSoil conditioner
(5.)Cashew shell cakeIndustrial Waste2520Tons0OthersWithin premisesOthersfuel for boiler
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube004.1260.44100
(2.)PM2.5Microgram per Meter Cube00010
(3.)NOxMicrogram per Meter Cube001.1319.9280
(4.)SO2Microgram per Meter Cube004.8820.3580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler - 850 Kg/hrFire wood mixed with cashew shell cake180.3OthersPM100
(2.)DG - 125 kVA X 2 No'sDiesel40.15SO280
(3.)Thermic fluid heater - 4 lakh kilo calorieFire wood mixed with cashew shell cake180.3OthersPM100
(4.)Thermic Fluid heater - 6 lakh kilo calorieFire wood cashew shell cake180.3OthersPM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source MESCOM - Mangalore Electricity Supply Company
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) - 250 kVA – 1 No - 125 kVA – 1 No
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.728
    Total Land (ha.) 0.728
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0.72
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Industrial land 0
    Total (ha.) 0.7200
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersIndustrial land0.72
Total (ha.) 0.72
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone0None
(2.)Critically Polluted AreaNone0None
(3.)WLSNone0None
(4.)ESZsNone0None
(5.)CorridorsNone0None
(6.)Wildlife CorridorsNone0None
(7.)NPANone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDurgamalai8Reserve forest
(2.)Archaeological SitesBahubali5Archaelogical site
(3.)Defence InstallationsNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.72
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Small pond is located at a distance of around 750 m towards east of the project site. Anekere Lake and Matadha Kere are located at a distance of 4.3 Km (North) & 3.1 km (North)
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 3.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 20
(e)No. of working days 365
(f)Total Manpower 55
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.6200.62
(2.)Percentage of Total Project Area35035
(3.)No. of Plants60060
(4.)Funds Allocated123
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social• The project will create job opportunities for the locals in the form of direct or indirect employment • Improved standard of living of the area • Opportunity for the development of small scale industries/business • Increased revenue to the exchequer
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/IA0051
(ii)Name of the EIA Consultant Samrakshan
(iii)Address Swastik Manandi Arcade, F- 4, 1st Floor, S. C. Road, Sheshadripuram, Bangalore - 560 020, INDIA
(iv)Mobile No. 9845381819
(v)Landline No. 0802346010
(vi)Email Id samrakshanblr@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 24 Jul 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (Sno. 7.1) (ii) All old CTOs not uploaded to verify the violation, if any done by PP. (iii) Copy of earlier EC is not uploaded in at S. No. 6 of Form 2. (iv) The is an expansion of EC case. Certified compliance report of earlier EC from RO, MoEFCC need to be uploaded in form 2 at S. No. 9. (v) TOR compliance is not adequate in EIA/EMP report and need to revise as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. (vi) Status of Conservation Plan approval from CWLW. (vii) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. 05 Mar 2020
2.NAThe correction have been made as per the instruction received 24 Sep 2020
3.NA1. Please read the earlier EDS sought by the Ministry earlier w.r.t. certified compliance report of CTO from SPCB. The matter was again examined and noted that SPCB has submitted the compliance report and as per the Report PP has already constructed building without prior EC, it is a violation case and PP needs to apply under provisions of the Notification dated 14.03.2017. 2. Further, PP has not revised the Form 2 and not uploaded the requisite information as sought by the Ministry earlier. 3. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. 4. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. 29 Sep 2020
4.NAThe correction have been made as per the instruction received 08 Oct 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGanesh KamathN
DesignationManagingpartner
Name of Company (Applicant Name should not be given here)ADARSH INDUSTRIAL CHEMICALS
AddressSurvey No.343/7A, Murthangady, Sanoor, Karkala taluk, Udupi District - 574114, Karnataka State
Print