Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of existing jetty & and storage terminal capacity at Gujarat Chemical Port Terminal Company Limited (GCPTCL)
(b)Name of the Company / Organisation GUJARAT CHEMICAL PORT TERMINAL COMPANY LIMITED
(c)Registered Address P.O. Lakhigam, Tal: Vagra, Via: Dahej,Dist:- Bharuch, Gujarat,Bharuch,Gujarat-392130
(d)Legal Status of the Company Joint Venture(Pvt+Govt.)
(e)Joint Venture Yes
     1.1.         No. of JV Partners         7
S. No. Name of the JV PartnerShare of the JV Partner Address of the JV Partner Email Id of JV Partner Mobile No. of JV Partner
(1.)Gujarat Industrial Development Corporation Limited15.652nd Floor, Udhyog Bhawan, Block no 4, Sec-11, Gandhinagar-382011vcmd@gidcgujarat.com 9978407033
(2.)Gujarat Alkalies and Chemicals Limited3.99PO- Petrochemicals, Vadodara-391346girija.paliwal@gacl.com 9879109310
(3.)Gujarat State Fertilisers and Chemicals Ltd7.97PO-Fertiliser Nagar, Vadodara-391750mayur.garg@gsfcltd.com 7573948699
(4.)Gujarat Narmada Valley Fertilisers Company Limited11.96Post -Narmada Nagar, District Bharuch, Gujaratdvparikh@gnfc.in 7227822622
(5.)Gujarat Industrial Investment Corporation Limited0.966th Floor, Udyog Bhawan Block 11-12 Gandhinagar Gujarat 382011md-gic@gujarat.gov.in 9925043811
(6.)Gujarat Maritime Board17.67Sector 10A opp Air force station, Gandhinagarvc.gmb@gujarat.gov.in 9978407676
(7.)Reliance Industries Limited41.80Maker Chamber IV, 3rd Floor, Nariman Point Mumbaikishor.jhalaria@ril.com 9867610614
2.
Address for the correspondence:
(a)Name of the Applicant sanjay chandrakant gupte
(b)Designation (Owner/ Partner/ CEO) General Manager- Terminal
(c)Address Gujarat Chemical Port Terminal Company Limited. P.O. Lakhigam, Tal:Vagra, Via: Dahej,Dist: Bharuch, Gujarat,Vagra,Bharuch,Gujarat-392130
(d)Pin code 392130
(e)E-mail sanjay.gupte@gcptcl.in
(f)STD Code. 2641(f)Telephone No. 261004
(g)Fax No. 261055
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity7(e) Ports, Harbours
(b)Category A
(c)Proposal Number IA/GJ/MIS/139630/2014
(d)Master Proposal Number(Single Window) SW/139612/2020
(e)EAC concerned (for category A Projects only) Infrastructure and Miscellaneous Projects  +  CRZ
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No 6 and adjoining land plot no 6 falling wit
(b)Pincode 392130
(c)Bounded Latitudes (North) FROM 214156.54 To 214158.27
(d)Bounded Longitudes (East) FROM 723153.60 To 72377.25
(e)Survey of India Topo Sheet No. SOI toposheet/maps is not available, as the maps a
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 6.07
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number No. SEIAA/GUJ/EC/6(b)&7(e)/28/2016
(b)Date of Apply of TOR 19 May 2014
(c)Date of Issue of TOR / Standard ToR 30 Sep 2014
(d)Date of Apply of EC 29 Sep 2015
(e)Date of Issue of EC 27 Jan 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :0
GCPTCL, Plot No-6, GIDC Dahej, Taluka-Vagra, Bharuch (Gujarat)
State :Gujarat
District :Bharuch
Tehsil :Vagra
Village :Dahej
60Please refer Public hearing proceedingDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. file No: 6-3/2018(ENV)/994
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 27 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Jetty Expansion4.9797.02112OthersMMTPAOthersShip
(2.)Storage Terminal8.5917.5OthersLakh KLOthersPipeline
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Please refer EIA ReportPlease refer EIA ReportPlease refer EIA ReportPlease refer EIA ReportNone
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 10 Jan 2019
(iv)Valid Upto 25 Nov 2023
(v)File No. AWH98682
(vi)Application No. 146074
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1200
(b) Funds Allocated for Environment Management (Capital) (in Crores) 10.6
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.25
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0.67
(b)Existing quantity of raw material/fuel 1.468
(c)Total quantity of raw material/fuel 2.138
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Liquefied Petroleum Gas0.85OthersMT/ hrIndiaRoad480 OthersRIL Jamnagar RefineryCopy of Linkage
(2.)HSD1.30OthersMT/ hrIndiaRoad480 OthersRIL Jamnagar RefineryCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 Mar 2018
(b)Season Three-Sesions
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube104.227.599.7100
(2.)NOxMicro Gram per Meter Cube39.78.335.480
(3.)PM2.5Micro Gram per Meter Cube49.811.539.860
(4.)SO2Micro Gram per Meter Cube30.45.827.780
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l8601985002000
(2.)pHNA8.217.348.58.5
(3.)Total Hardnessmg/l360120200600
(4.)Fluoridemg/l0.480.3311.5
(5.)Heavy MetalsIron as Femg/l0.080.060.31
(6.)TSSNA0000
(7.)Chloridesmg/l270352501000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.977.18C
(2.)DOmg/l5.64.9C
(3.)CODmg/l16.48C
(4.)BODmg/l22C
    14.4.     No. of Ambient Noise monitoring locations : 20
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))69.940.475
(2.)Leq(Night)A-weighted decibels(dB(A))61.33570
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH9.147.6
(2.)Electric ConductivityOthersdS/m4.20.13
(3.)N(Nitrogen)Milligram per Kilogram12428.1
(4.)P(Phosphorus)Milligram per Kilogram6813.7
(5.)K(Potassium)Milligram per Kilogram1084.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC159010Copy of Permission LetterPipelineOthersGIDCMOU17 Jun 20061590
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Service water/Domestic165165ETP and Septic tankGreen Belt Renewal Plant165
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 165
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 165
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Oil soaked cotton & other wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons5RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons5RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Tank sludge/ iron sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons5RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Cargo tank residue, sludge containing oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons5RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Cargo tank residue containing chemicalHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons5RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Discarded containers/ barrels/ linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Tons5RoadOthersSale/Incinerate/Co processing
(7.)Used foam pig of chemicalHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons5RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Ballast bilge water containing oil from shipHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons5RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)Used or spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7.2Tons280RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube64.61.33.1468100
(2.)PM2.5Microgram per Meter Cube29.71.31.483260
(3.)SO2Microgram per Meter Cube15.635.162180
(4.)NOxMicrogram per Meter Cube21.335.212780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Propane HeaterLPG060.45SO2100 ppm
(2.)Propane HeaterLPG060.45NOx50 ppm
(3.)Propylene HeaterLPG060.45SO2100 ppm
(4.)Thermax HeaterHSD300.45NOx50 ppm
(5.)DG Set -2000 kVAHSD300.62SO2100 ppm
(6.)Diesel Generator Fire water pump (3 Nos)HSD30.15NOx50 ppm
(7.)DG Set- 2000 kVAHSD300.62NOx50 ppm
(8.)propylene heaterLPG060.45NOx50 ppm
(9.)DG set (2 Nos) -2000 kvAHSD300.62PM10150 mg/nm3
(10.)DG Set -2000 KVAHSD300.62PM10150 mg/Nm3
(11.)Thermax HeaterHSD300.45PM10150 mg/nm3
(12.)DG Set (2 Nos)-2000 kVAHSD300.62SO2100 ppm
(13.)Thermax HeaterHSD300.45SO2100 ppm
(14.)Diesel Generator Fire water pump (3 nos)HSD30.15PM10150 mg/Nm3
(15.)Diesel Generator Fire water pump (3 Nos)HSD30.15SO2100 ppm
(16.)DG set (2 Nos)-2000 KVAHSD300.62NOx50 ppm
(17.)Propane HeaterLPG060.45PM10150 mg/nm3
(18.)propylene heaterLPG060.45PM10150 mg/nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4350
(b)Source Dakshin Gujarat Vij Company Ltd
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 39
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 151.8
    Total Land (ha.) 190.8
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 151.8
(g)Forest (ha.) 39
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 190.8
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt35
(2.)OthersPort Operational Area155.8
Total (ha.) 190.8
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0None
(2.)ESZsNA0None
(3.)CorridorsNA0None
(4.)Critically Polluted AreaNA0None
(5.)WLSNA0None
(6.)Wildlife CorridorsNA0None
(7.)NPANA0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0None
(2.)Defence InstallationsNA0None
(3.)ForestReserved Forest0.2None
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 190.8
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1 lakh
(iii)Period of Implementation Continous Activity
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Sea
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sea
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 525
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt351045
(2.)Percentage of Total Project Area18.345.223.54
(3.)Funds Allocated150000030000004500000
(4.)No. of Plants8750020000107500
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialGeneration direct and indirect employment
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification IV
(b)Location Type Low and Medium Eroding Coast
(c)Details of Mangroves Land Involved, if Any No
(d)Area of Mangroves Land (hectare) 0
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies Please refer EIA Report
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 01 Mar 2017
(iv)Period of Study To (EIA Terrestrial) 31 Mar 2018
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies Please refer EIA Report
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 01 Mar 2017
(iv)Period of Study to (EIA Marine) 31 Mar 2018
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan Please refer EIA report
2.
Description of the Project Under Consideration:
(a)Type of Project Facility for Storage of Goods/Chemicals
(i)Agency Name for Preparing CRZ Maps Institute of Remote Sensing, Anna University
(ii)Name and Type of Chemical Liquid, gaseous and Cryogenic
(iii)End use of the Chemical Industrial
(iv)No. of Tanks for Storage 50
(v)Capacity of tanks 900000
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity IV
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 0
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 0
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained No
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed Please refer attached GCZMA recommandations
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) Please refer attached GCZMA CRZ recommendations
   35.   Sector Specific Details For Infrastructure and Miscellaneous Projects  +  CRZ
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Gas Liquid Cargo
(d)Quantity of Cargo 12000000
(e)Control Measures of Cargo Please refer chapter 8 of EIA report
(f)Dust Control Measures Please refer chapter 8 of EIA report
(g)Quantum 12000000
(h)Quantity of Dredging (Cubic meter per day) 4109
(i)Type of Dredging Capital
(j)Disposal of Dredge Material Dredge Material will be disposed as proposed in EI
(k)Details of Outfall Diffusers NA
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 0
(n)Details of Monitoring at Outfall no marine outfall planned
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking NA
5.
Energy Saving Measures:
(a)Source/Mode LEDs, Energy efficient pump and motors
(b)Percentage 10
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA90
(ii)Name of the EIA Consultant Indomer Coastal Hydraulic (P) Ltd
(iii)Address 63, Gandhi Road, Alwar Thirunagar, Chennai
(iv)Mobile No. 9940141650
(v)Landline No. 0442486248
(vi)Email Id ocean@indomer.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Infrastructure and Miscellaneous Projects  +  CRZ
(ix)Validity of Accreditation 12 Sep 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

Kindly see minutes of 50th meeting of EAC (Infra-2)

01 May 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantsanjay chandrakant gupte
DesignationGeneral Manager- Terminal
Name of Company (Applicant Name should not be given here)GUJARAT CHEMICAL PORT TERMINAL COMPANY LIMITED
AddressP.O. Lakhigam, Tal: Vagra, Via: Dahej