1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | 3.5 MTPA Pottangi Bauxite Mine by NALCO | (b)Name of the Company / Organisation | NALCO | (c)Registered Address | NALCO Bhawan, P-1, Nayapalli,P.O.-RRL, Bhubaneswar,Angul,Orissa-751013 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kalikinkar Panda | (b)Designation (Owner/ Partner/ CEO) | Executive Director (P&T) | (c)Address | NALCO Bhawan, P-1, Nayapalli,P.O.-RRL, Bhubaneswar,Khordha,Khordha,Orissa-751013 | (d)Pin code | 751013 | (e)E-mail | gm_uecb@nalcoindia.co.in | (f)STD Code. | 674(f)Telephone No. | 2300633 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/MIN/69870/2017 | (d)Master Proposal Number(Single Window) | SW/135930/2020 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Nil | (b)Pincode | 764039 | (c)Bounded Latitudes (North) | | From | | Degree | 18.575322 | Minutes | | Second | | From | | Degree | 18.618460 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 82.940374 | Minutes | | Second | | From | | Degree | 82.997195 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E44K/14, E44K/15, E44L/2, E44L/3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 1400 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Orissa | Koraput | Pottangi | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/8/2018-IA-II(M) | (b)Date of Apply of TOR | 07 Dec 2017 | (c)Date of Issue of TOR / Standard ToR | 28 Jun 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 17 Dec 2019 | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| At Pottangi Mini Stadium | State : | Orissa | District : | Koraput | Tehsil : | Pottangi | Village : | Pottangi |
| 700 | Main issues are Infrastructure development, employment opportunities to surrounding local people, CSR implementation, peripheral development | Others | Addl. District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Open Cast Bauxite Mine | 3.5 MTPA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 697.979 Ha | 3.5 | Others | Million Tones per Annum | Conveyor Belt | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1436.9 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 120 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 7.18 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | EXPLOSIVE | 300 | Others | Million Tons per Annum | Local Market | Road | | 200 | Others | Purchase Agreement from Authorized vendors | Copy of Linkage | (2.) | HSD | 200 | Kilo Litre per Day | | Local Market | Road,Rail | | 200 | Others | Purchase Agreement from Authorized vendors | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Sep 2018 To 30 Nov 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 38.2 | 21.1 | 38.2 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 14.2 | 4.8 | 14.2 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 23.2 | 14.3 | 23.2 | 80 | (4.) | Others | O3 | Micro Gram per Meter Cube | 19.4 | 10.5 | 19.4 | 100(8hrs) | (5.) | PM10 | | Micro Gram per Meter Cube | 55.4 | 35.8 | 55.4 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.4 | 6.5 | 8.5 | 0 | (2.) | Chlorides | | | mg/l | | 254 | 10 | 250 | 1000 | (3.) | Fluoride | | | mg/l | | 1.8 | 0.5 | 1 | 1.5 | (4.) | Others | Cu | | mg/l | | 0.05 | 0.05 | 0.05 | 0 | (5.) | TSS | | | mg/l | | 0 | 0 | 100 | 100 | (6.) | TDS | | | mg/l | | 850 | 65 | 500 | 2000 | (7.) | Total Hardness | | | mg/l | | 408 | 36 | 200 | 600 | (8.) | Heavy Metals | | Pb | mg/l | | 0.01 | 0.01 | 1 | 0 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.7 | 7.6 | B | (2.) | DO | | mg/l | | 5.4 | 5.2 | B | (3.) | COD | | mg/l | | 42 | 35 | D | (4.) | BOD | | mg/l | | 12 | 8 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 58.1 | 42.1 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.1 | 40.2 | 45 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.1 | 6.4 | (2.) | N(Nitrogen) | Kilogram per hectare | | 345 | 157 | (3.) | P(Phosphorus) | Kilogram per hectare | | 35.8 | 12.1 | (4.) | K(Potassium) | Kilogram per hectare | | 376 | 22 | (5.) | Electric Conductivity | Others | micromohs/cm | 193 | 120 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.3 To 7.64 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.4 To 5.89 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 700 | 3.5 | Not Appliacble | Pipeline | | Intake Well | | 21-4/2509/OR/MIN/2020 | 05 Jul 2020 | 700 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 104 | 125 | STP | Reuse within the Plant & Recycling,Green Belt Renewal Plant,Others | Dust suppression | 100 | 4 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 104 | (b)Total Discharged Water (Kilolitre per Day) | 4 | (c)Total Reused Water (Kilolitre per Day) | 100 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Domestic waste | Municipal Solid Waste | | 13.8 | Tons | 5 | Road | | Authorized Recyclers | | (2.) | STP sludge | Others | Sludge | 4.2 | Tons | 0 | Road | | Others | Used as a Manure for Greenbelt | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 14.2 | 0.5 | 0.03 | 14.23 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 55.4 | 0.5 | 6.1 | 61.51 | 100 | (3.) | NOx | | Microgram per Meter Cube | 23.2 | 0.5 | 5.5 | 28.71 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 0 | 0.5 | 0 | 1 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 1500 kVA DG set | HSD | 30 | 0.3 | SO2 | | 0.051 | (2.) | 1500 kVA DG set | HSD | 30 | 0.3 | NOx | | 1.69 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4460 | (b)Source | Captive Power Generation from Alumina Refinary, Da | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | DG set | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 697.979 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 697.979 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 697.979 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : None | 0 | Total (ha.) | 697.9790 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 28.33 | | (2.) | Green belt | | 284.11 | Including Safety zone | (3.) | Others | Power corridor, conveyor belt and roads | 30.769 | Power corridor, conveyor belt and roads | (4.) | Quarry Area | | 354.77 | Mining & Backfilling | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None | 0 | None within the study area | (2.) | WLS | None | 0 | None within the study area | (3.) | NPA | None | 0 | None within the study area | (4.) | Wildlife Corridors | None | 0 | None within the study area | (5.) | Corridors | None | 0 | None within the study area | (6.) | Critically Polluted Area | None | 0 | None within the study area | (7.) | ESZs | None | 0 | None within the study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Rallagedda | 9.1 | South | (2.) | Archaeological Sites | | None | 0 | None within the study area | (3.) | Defence Installations | | None | 0 | None within the study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Under Process(Stage-II) | (b)Legal Status of Forest Land | Govt. Land | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 697.98 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock (Pavo cristatus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 1,00,000 | (iii)Period of Implementation | 3 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kunduli River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 3.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 229 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 350 | (f)Total Manpower | 229 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 284.11 | (b)Percentage of Total Project Area | 40.70 | (c)No. of Plants to be Planted | 101750 | (d)Funds Allocated for Plantation | 3000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Prevent illegal mining | (2.) | Social | Development of Physical and social infrastructure | (3.) | Financial | Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Bauxite | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 3.5 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MP/FM/13-ORI/BHU/2018-19 | (b)Date of Approval | 27 Jul 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 697.979 | (f)Approved Capacity | 3.5 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 111.794 | (b)Mineable Reserves (Million Ton) | 110.400 | (c)Extractable Reserves(Million Ton) | 110.400 | (d)Percent(%) of Extraction | 98.7 | (e)Grade of Coal /Ore /Mineral | 45.6 | (f)Stripping Ratio | 1 : 0.12 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 45 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 32 years | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 697.979 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 14 May 2018 | (iii)Validity of LOI | 50 | (iv)Reference No. of LOI | 3794/SM, Bhubaneswar | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Applied | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Not Applicable | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 1 | (ii)Total Area (in Hectare) | 5.23 | (iii)Height (in meter) | 16 | (iv)Quantity (in Million Cubic meter) | 671050 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 267560 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 267560 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 46.113 | (b)Depth (in meter) | 40 | (c)Volume (in Million Cubic meter) | 9913200 | |
|
12. | Details of Quarry: | (a)Final Void of 46.113 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 46.113 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | shovel/Loaders | (b)Surface to Siding/Loading | Dumpers | (c)Transportation / Conveyor Details | Over land Conveyor belt system | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (2.) | WASTE LAND | | 0 | 0 | 0 | (3.) | FOREST LAND | | 697.979 | 0 | 697.979 | (4.) | AGRICULTURE LAND | | 0 | 0 | 0 | (5.) | SETTLEMENTS | | 0 | 0 | 0 | (6.) | OTHERS(Specify) | None | 0 | 0 | 0 | (7.) | GRAZING LAND | | 0 | 0 | 0 | |
TOTAL | 697.979 | 0 | 697.979 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | ROADS | | 0 | 0 | 16.150 | | 16.15 | (2.) | EXCAVATION/QUARRY | | 0 | 0 | 46.113 | | 46.113 | (3.) | TOP SOIL STORAGE | | 0 | 0 | 2.390 | | 2.39 | (4.) | VIRGIN AREA | | 0 | 0 | 550.597 | | 550.597 | (5.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (6.) | INTERNAL OB DUMPS | | 0 | 0 | 2.840 | | 2.84 | (7.) | GREEN BELT | | 23.40 | 0 | 0 | | 23.4 | (8.) | Other | Mineral Separation Plant, Power Corridor | 0 | 0 | 22.63 | | 22.63 | (9.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 33.859 | | 33.859 | |
TOTAL | 23.4 | 0 | 674.579 | 0 | 697.979 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 5.23 | (c)Quarry(in hectare) | 46.113 | (d)Safety Zone(in hectare) | 23.40 | (e)Final Void of 22.713 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 23.40 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2020 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA0140 | (ii)Name of the EIA Consultant | Ramky Enviro Services Private Limited. | (iii)Address | Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad | (iv)Mobile No. | 9000604455 | (v)Landline No. | 0402301500 | (vi)Email Id | drchakradhar@ramky.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 21 May 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | On examination of the proposals, the following observations were made
1) Copy of documents in support of the competence/authority of the person making this application is not proper. Also applicant is different than the signatory in covering letter. 2) PP did not upload the copy of advertisement given in both the news paper,3) Green Belt development plan over the life of mine is not mentioned, 4) Accreditation of consultant is required for period during which study was conducted till date, 5) Incremental concentration of for PM 2.5 in control and worst case is not provided,6) Proof of submission for withdrwal of water is not submitted, 7) There is one schedule-1 species mentioned in EIA Report but in Form-2 it has mentioned as nil, 8) PP did not submit the authenticated list of flora & fauna in core and buffer zone from competent authority, in case there is schedule-1 species then conservation plan needs to be submitted along with its proof of submission to CWLW.
You requested to submit the reply for the above observation for further consideration | 01 Apr 2020 | 2. | NA | On examination of the proposals, the following observations were made
1) Copy of documents in support of the competence/authority of the person making this application is not proper. Also applicant is different than the signatory in covering letter. 2) PP did not upload the copy of advertisement given in both the news paper,3) Green Belt development plan over the life of mine is not mentioned, 4) Accreditation of consultant is required for period during which study was conducted till date, 5) Incremental concentration of for PM 2.5 in control and worst case is not provided,6) Proof of submission for withdrwal of water is not submitted, 7) There is one schedule-1 species mentioned in EIA Report but in Form-2 it has mentioned as nil, 8) PP did not submit the authenticated list of flora & fauna in core and buffer zone from competent authority, in case there is schedule-1 species then conservation plan needs to be submitted along with its proof of submission to CWLW.
You requested to submit the reply for the above observation for further consideration | 01 Apr 2020 | 3. | NA | The correction have been made as per the instruction received | 06 Jul 2020 | 4. | NA | i) Copy of documents in support of the competence/authority of the person making the application is not correct rather covering letter was uploaded, ii) clear copy of Topo Sheet is to be uploaded as the same is not readable on zooming, iii) village name is not mentioned in the Form-II, iv) written comments in the PH is not translated to English, v) it has mentioned that 700 persons attend the PH but attendance sheet is only for 30-40 persons, iv) copy of application to obtain NOC from CGWA for withdrawal of water is not uploaded, v) how a stack height of 30 meters is maintained in DG set drawing and guidelines for the same needs to be submitted, vi) ESZ is mentioned within 1.5 km but protected area within 10 KM is nil the same needs to be verified, vii) FC application is mentioned as yet to be submitted in Form-II, the same is required to be provided/corrected, viii) tree cutting is mention as Nil justification for the same needs to be submitted, ix) environmental benefit is mentioned as prevention of illegal mining what about other environmental benefits of the project, x) mineral separation plant is mentioned in Form-II but the application is made only for schedule 1 (a) and even in the ToR and Form-1 there is no mention of benificiation plant. How it was added without obtaing the ToR for the same , xi) post mining land use needs to be checked, xii) list of Schedule-1 Species duly authenticated by Forest Dept. is not submitted by PP. The conservation plan needs to be prepared for Schedule-1 species as per the authenticated list and proof of its submission to CWLW needs to be submitted. Conservation plan should clearly mention the activities to be carried out and budget for the same, xiii) Complete original test report is not uploaded. | 16 Jul 2020 | 5. | NA | The correction have been made as per the instruction received | 30 Aug 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kalikinkar Panda | Designation | Executive Director (P&T) | Name of Company (Applicant Name should not be given here) | NALCO | Address | NALCO Bhawan, P-1, Nayapalli |
|