Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Ambition Remedies
(b)Name of the Company / Organisation AMBITION REMEDIES
(c)Registered Address Plot No 1719/4, GIDC-Panoli Estate, Tal-Ankleshwar, Dist-Bharuch-394116,,Bharuch,Gujarat-394116
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ashvinkumar Dobariya
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Plot No. H-3086/60,Antilia Street, Near Adarsh Niwashi Shala, Garden City Road, GIDC-Ankleshwar-393002.,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail ambition.remedies@yahoo.com
(f)STD Code. 12(f)Telephone No. 123456
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category B1
   Reason for Applying at Ministry general
(c)Proposal Number IA/GJ/IND2/123295/2019
(d)Master Proposal Number(Single Window) SW/135052/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No.-1719/4, GIDC-Panoli Estate, Pin-394116, T
(b)Pincode 393002
(c)Bounded Latitudes (North) FROM 21.3304555 To 22.130476
(d)Bounded Longitudes (East) FROM 72.585518 To 72.585782
(e)Survey of India Topo Sheet No. F43M14(46C/14), F43N2(46G/2), F43M15(46C/15), F43N
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 25
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 45
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/321/2019-IA-II(I)
(b)Date of Apply of TOR 26 Oct 2019
(c)Date of Issue of TOR / Standard ToR 08 Dec 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason project is located in notified industrial estate P
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Boiler & Cooling tower2 TPH, 20 TR1, 1 Nos
(2.)Nutch Filter48"7 Nos
(3.)Rotary Vacuumed Dryer1000 Kg2 Nos
(4.)SS316 rector with condenser and receiver3000, 4000, 5000, 6000 Lit5, 5, 2, 1 Nos
(5.)GLR Reactor with condenser, receiver3000, 4000 lit4, 4 Nos
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bulk Drug & Bulk Drug Intermediates (Ketoconazole and its intermediates Cis-Tosylate Cis-Bromobenzoate N, N, Bis (2-chloroethyl) amine Hydrochloride 1-Acetyl-4-(4-Hydroxy Phenyl) Piperazine 2-Chloro Ethylamine Hydrochloride Meloxicam and its intermediates 2-Amino-5-methyl Thiozol Methyl Benzothiazine Isopropyl Ester Chloroxazone 1-(2, 3 DichloroPhenyl) Piperazine HCL 1-(4-Methoxy-Phenyl)-4-(4-Nitro-Phenyl)-Piperazine N-Methyl-1-Naptheline Methyl Amine Hydrochloride Ambroxol HCl 1-[2-(2-Hydroxyet420Tons per AnnumRoad,Rail
(2.)R&D1.2Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.39
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.18
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.1725
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 87289.39
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 87289.39
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ethyl Acetate4424.62Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(2.)CBB Coomassie Brilliant Blue1188.60Tons per AnnumLocalRoad,Rail50 MoUCopy of Linkage
(3.)Di Methyl Formamide1264.54Tons per AnnumLocalRoad,Rail50 MoUCopy of Linkage
(4.)Biofuel (Agrowaste)3060Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(5.)Sodium Bicarbonate242.42Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(6.)MDC6036.41Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(7.)diesel172.80Tons per AnnumLocalRoad,Rail50 Open MarketLOICopy of Linkage
(8.)p toluene sulfonyl chloride708.29Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(9.)Methanol13390.51Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(10.)Acetone3430.06Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(11.)Bromine525.96Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(12.)Thionyl chloride1108.92Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(13.)I P A3852.96Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(14.)Xylene2215.92Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(15.)Urea399Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(16.)Liq. Ammonia273.84Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(17.)Acetic Acid2079.72Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(18.)1,3 Di Chloro Benzene3920.16Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(19.)Naphthalene268.80Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(20.)Piperazine1017.72Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(21.)HCl 30%965.71Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(22.)Sulfuryl Chloride525.84Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(23.)Toluene12158.35Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(24.)Imidazole1056.22Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(25.)EDC2467.56Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(26.)Alluminum chloride3573.36Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(27.)Phosphoric Acid105Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(28.)Hydrogen Peroxide85.20Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(29.)Tetra hydrofuran2937.60Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(30.)Salt9.07Tons per AnnumLocalRoad,Rail50 OthersLOICopy of Linkage
(31.)Sodium hydroxide1166.54Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(32.)Sulfuric Acid42Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(33.)acetyl chloride1053.36Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
(34.)IPA HCl361.20Tons per AnnumLocalRoad50 OthersLOICopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube25.5014.4025.4580
(2.)PM10Micro Gram per Meter Cube95.7075.2095.70100
(3.)PM2.5Micro Gram per Meter Cube57.4044.8057.1760
(4.)SO2Micro Gram per Meter Cube29.6010.9029.0580
(5.)OthersCOMicro Gram per Meter Cube17543170.862000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l18200
(2.)TDSmg/l15375945002000
(3.)OthersSulphatemg/l131.814.7200400
(4.)Chloridesmg/l474.469.22501000
(5.)Heavy MetalsCdmg/l000.000.00
(6.)pHNA8.277.376.58.5
(7.)Total Hardnessmg/l428.8116200600
(8.)Fluoridemg/l0.040.011.5
(9.)Heavy MetalsArsenicmg/l000.010.05
(10.)Heavy MetalsPbmg/l000.010.0
(11.)OthersTotal Alklinitymg/l341267200600
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.057.01E
(2.)BODmg/l180E
(3.)OthersTSSmg/l6019E
(4.)DOmg/l6.94.70E
(5.)CODmg/l647.5E
(6.)OthersTDSmg/l878230E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))71.1648.0375
(2.)Leq(Night)A-weighted decibels(dB(A))67.6642.1170
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.747.28
(2.)N(Nitrogen)Milligram per Kilogram397.3203.8
(3.)P(Phosphorus)Milligram per Kilogram15.24.04
(4.)K(Potassium)Milligram per Kilogram54191224
(5.)Electric ConductivityMillisiemens per Centimetremicrosiemens per cm0.30.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Authority27.80.2Copy of Permission LetterPipelineOthersPipe LineNAO/PNL/005/13420 Jul 201930
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1.62Soak Pit & Septic TankOthersSoak Pit / Septic Tank01.6
(2.)Process4.06.4Stripper, ETP And CMEEOthersSent to CMEE For ZLD04.0
(3.)Washing1.06.4ETP And CMEEOthersSent to CMEE For ZLD01.0
(4.)Boiler Blowdown0.46.4ETP And CMEEOthersSent to CMEE For ZLD00.4
(5.)Cooling0.26.4ETP And CMEEOthersSent to CMEE For ZLD00.2
(6.)Scrubber0.96.4ETP And CMEEOthersSent to CMEE For ZLD00.9
(7.)Boiler Condensate Recovery330Condensate Recovery SystemReuse within the Plant & Recycling33
(8.)Scrubber1.90Sale to End UserOthersSale to End User01.9
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 43
(b)Total Discharged Water (Kilolitre per Day) 10
(c)Total Reused Water (Kilolitre per Day) 33
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Liq. Ammonia Solution (22-25 Percentage)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)274.08Kilolitre0OthersDRUM / PIPLELINEOthersCollection Storage And Reuse Inhouse
(2.)Aluminium Solution 20-25 PercentageHazardous Waste (as per Hazardous and Other Waste Management rules 2016)536Kilolitre10RoadOthersCollectionStorageAndSale to User Under Rule 9
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Tons10RoadAuthorized Recyclers
(4.)Inorganic SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)63Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4Tons10RoadOthersTreatment, Storage and Disposal Facility (CHWIF)
(6.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)38Tons10RoadOthersTreatment, Storage and Disposal Facility (CHWIF)
(7.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10252Tons0OthersDrum / PipelineOthersCollection Storage Recovery and Reuse inhouse
(8.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)36Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)Discarded Containers, Liners, Barrels, PP BagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.5Tons10RoadAuthorized Recyclers
(10.)HCL Solution 8 to 10 PercentageHazardous Waste (as per Hazardous and Other Waste Management rules 2016)330Kilolitre0OthersDrum / PipelineOthersCollection Storage And Reuse Inhouse
(11.)Sodium Bisulphite 22-25 PercentageHazardous Waste (as per Hazardous and Other Waste Management rules 2016)250Kilolitre10RoadOthersCollectionStorageAndSale to User Under Rule 9
(12.)NaBr Solution 20-22 PercentageHazardous Waste (as per Hazardous and Other Waste Management rules 2016)183Kilolitre10RoadOthersCollectionStorageAndSale to User Under Rule 9
(13.)Manganese Dioxide (MnO2)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)863Tons10RoadOthersCollectionStorageAndSale to User Under Rule 9
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube87.032.40.0788.10100
(2.)PM2.5Microgram per Meter Cube52.022.40.0453.0660
(3.)SO2Microgram per Meter Cube18.782.40.1819.9680
(4.)NOxMicrogram per Meter Cube20.002.40.0621.0680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler 2 TPHBio-Coal/ Coal / Briquette or Natural Gas150.5SO280
(2.)Reaction Vessel - BrominationNil110.2OthersHBr24
(3.)ThermopackBio-Coal / Coal / Briquette or Natural Gas150.5OthersSPM120
(4.)Boiler 2 TPHBio-Coal / Coal / Briquette or Natural Gas150.5NOx40
(5.)ThermopackBio-Coal / Coal / Briquette or Natural Gas150.5SO280
(6.)Reaction Vessel - SulphonationNil110.2OthersSO232
(7.)Reaction VesselNil110.2OthersNH3140
(8.)Boiler 2 TPHBio-Coal / Coal / Briquette or Natural Gas150.5OthersSPM120
(9.)ThermopackBio-Coal / Briquette / Coal or Natural Gas150.5NOx40
(10.)DG Set (Standby)Diesel90.5OthersSPM120
(11.)DG Set (Standby)Diesel90.5SO280
(12.)DG Set (Standby)Diesel90.5NOx40
(13.)Reaction Vessel - ChlorinationNil110.2OthersHCL16
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source DGVCL (GIDC PANOLI)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 125 KVA X 1 Nos
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.1977
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.1977
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 8223
(b)Waste/Barren Land (ha.) 5450
(c)Grazing/ Community Land (ha.) 7136
(d)Surface Water Bodies (ha.) 239
(e)Settlements (ha.) 2178
(f)Industrial (ha.) 2084
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Agriculture Fallow 6105
    Total (ha.) 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.0740% of Total Plot Area
(2.)Main Plant0.12All Other Area
Total (ha.) 0.19
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0NA
(2.)Wildlife CorridorsNA0NA
(3.)ESZsNA0NA
(4.)WLSNA0NA
(5.)NPANA0NA
(6.)Critically Polluted AreaAnkleshwar GIDC9Ankleshwar GIDC CPA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
(4.)OthersNANA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.19
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Canal Passing Nearby the Plot on the East Side
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Panoli Pond
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 20
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.78
(b)Percentage of Total Project Area 394.54
(c)No. of Plants to be Planted 150
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalFund allocation for EMS of 39.0 Lacs
(2.)SocialGenerating Employment for 20 people. Local people will be given preference
(3.)FinancialFund allocation for CER of 18.0 Lacs for nearby villages
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay Order Againts QCI NABTE
(ii)Name of the EIA Consultant GreenLeaf Envirotech Pvt Ltd
(iii)Address 3rd Floor, Kankavati Complex, Singanpor Rd, Manipark Society, Singanpor, Surat, Gujarat 395
(iv)Mobile No. 9375964607
(v)Landline No. 0000000
(vi)Email Id shailendrab.umrigar@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA