| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | M/s. Ambition Remedies | | (b)Name of the Company / Organisation | AMBITION REMEDIES | | (c)Registered Address | Plot No 1719/4, GIDC-Panoli Estate, Tal-Ankleshwar, Dist-Bharuch-394116,,Bharuch,Gujarat-394116 | | (d)Legal Status of the Company | Private | | (e)Joint Venture | No | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Ashvinkumar Dobariya | | (b)Designation (Owner/ Partner/ CEO) | Partner | | (c)Address | Plot No. H-3086/60,Antilia Street, Near Adarsh Niwashi Shala, Garden City Road, GIDC-Ankleshwar-393002.,,Anklesvar,Bharuch,Gujarat-393002 | | (d)Pin code | 393002 | | (e)E-mail | ambition.remedies@yahoo.com | | (f)STD Code. | 12(f)Telephone No. | 123456 | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| | Minor Activity | | | (b)Category | B1 | | Reason for Applying at Ministry | general | | (c)Proposal Number | IA/GJ/IND2/123295/2019 | | (d)Master Proposal Number(Single Window) | SW/135052/2020 | | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | | (f)Project Type | Fresh EC |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | Plot No.-1719/4, GIDC-Panoli Estate, Pin-394116, T | | (b)Pincode | 393002 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 21.3304555 | | Minutes | | | Second | | | From | | | Degree | 22.130476 | | Minutes | | | Second | | | (d)Bounded Longitudes (East) | | | From | | | Degree | 72.585518 | | Minutes | | | Second | | | From | | | Degree | 72.585782 | | Minutes | | | Second | | | (e)Survey of India Topo Sheet No. | F43M14(46C/14), F43N2(46G/2), F43M15(46C/15), F43N | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 25 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 45 | | (j)Seismic Zone | 3 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Gujarat | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Gujarat | Bharuch | Anklesvar | | |
|
| 6. | | Details of Terms of Reference (ToR): | | (a)MoEF&CC / SEIAA File Number | IA-J-11011/321/2019-IA-II(I) | | (b)Date of Apply of TOR | 26 Oct 2019 | | (c)Date of Issue of TOR / Standard ToR | 08 Dec 2019 | | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | Yes | | (b)Reason | project is located in notified industrial estate P | | (c)Supporting Document | Copy of Supporting Document | |
|
| 8. | | Details of Project Configuration/Product: | |
|
| 8.1. Project Configuration |
|---|
| S. No. | Plant/Equipment/Facility | Configuration | Remarks |
|---|
| (1.) | Boiler & Cooling tower | 2 TPH, 20 TR | 1, 1 Nos | | (2.) | Nutch Filter | 48" | 7 Nos | | (3.) | Rotary Vacuumed Dryer | 1000 Kg | 2 Nos | | (4.) | SS316 rector with condenser and receiver | 3000, 4000, 5000, 6000 Lit | 5, 5, 2, 1 Nos | | (5.) | GLR Reactor with condenser, receiver | 3000, 4000 lit | 4, 4 Nos | |
| 8.2. Product |
|---|
| S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | Bulk Drug & Bulk Drug Intermediates (Ketoconazole and its intermediates Cis-Tosylate Cis-Bromobenzoate N, N, Bis (2-chloroethyl) amine Hydrochloride 1-Acetyl-4-(4-Hydroxy Phenyl) Piperazine 2-Chloro Ethylamine Hydrochloride Meloxicam and its intermediates 2-Amino-5-methyl Thiozol Methyl Benzothiazine Isopropyl Ester Chloroxazone 1-(2, 3 DichloroPhenyl) Piperazine HCL 1-(4-Methoxy-Phenyl)-4-(4-Nitro-Phenyl)-Piperazine N-Methyl-1-Naptheline Methyl Amine Hydrochloride Ambroxol HCl 1-[2-(2-Hydroxyet | 420 | Tons per Annum | | Road,Rail | | | (2.) | R&D | 1.2 | Tons per Annum | | Road,Rail | | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | Details Not Applicable | |
|
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | N/A | | (iv)Valid Upto | N/A | | (v)File No. | NA | | (vi)Application No. | NA | | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in Crores) | 4 | | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.39 | | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.18 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.1725 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 87289.39 | | (b)Existing quantity of raw material/fuel | N/A | | (c)Total quantity of raw material/fuel | 87289.39 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | Ethyl Acetate | 4424.62 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (2.) | CBB Coomassie Brilliant Blue | 1188.60 | Tons per Annum | | Local | Road,Rail | | 50 | MoU | | Copy of Linkage | | (3.) | Di Methyl Formamide | 1264.54 | Tons per Annum | | Local | Road,Rail | | 50 | MoU | | Copy of Linkage | | (4.) | Biofuel (Agrowaste) | 3060 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (5.) | Sodium Bicarbonate | 242.42 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (6.) | MDC | 6036.41 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (7.) | diesel | 172.80 | Tons per Annum | | Local | Road,Rail | | 50 | Open Market | LOI | Copy of Linkage | | (8.) | p toluene sulfonyl chloride | 708.29 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (9.) | Methanol | 13390.51 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (10.) | Acetone | 3430.06 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (11.) | Bromine | 525.96 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (12.) | Thionyl chloride | 1108.92 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (13.) | I P A | 3852.96 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (14.) | Xylene | 2215.92 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (15.) | Urea | 399 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (16.) | Liq. Ammonia | 273.84 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (17.) | Acetic Acid | 2079.72 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (18.) | 1,3 Di Chloro Benzene | 3920.16 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (19.) | Naphthalene | 268.80 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (20.) | Piperazine | 1017.72 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (21.) | HCl 30% | 965.71 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (22.) | Sulfuryl Chloride | 525.84 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (23.) | Toluene | 12158.35 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (24.) | Imidazole | 1056.22 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (25.) | EDC | 2467.56 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (26.) | Alluminum chloride | 3573.36 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (27.) | Phosphoric Acid | 105 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (28.) | Hydrogen Peroxide | 85.20 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (29.) | Tetra hydrofuran | 2937.60 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (30.) | Salt | 9.07 | Tons per Annum | | Local | Road,Rail | | 50 | Others | LOI | Copy of Linkage | | (31.) | Sodium hydroxide | 1166.54 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (32.) | Sulfuric Acid | 42 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (33.) | acetyl chloride | 1053.36 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | | (34.) | IPA HCl | 361.20 | Tons per Annum | | Local | Road | | 50 | Others | LOI | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | | (b)Season | Post-Monsoon | |
|
| 14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | NOx | | Micro Gram per Meter Cube | 25.50 | 14.40 | 25.45 | 80 | | (2.) | PM10 | | Micro Gram per Meter Cube | 95.70 | 75.20 | 95.70 | 100 | | (3.) | PM2.5 | | Micro Gram per Meter Cube | 57.40 | 44.80 | 57.17 | 60 | | (4.) | SO2 | | Micro Gram per Meter Cube | 29.60 | 10.90 | 29.05 | 80 | | (5.) | Others | CO | Micro Gram per Meter Cube | 175 | 43 | 170.86 | 2000 | |
| 14.2. No. of Ground Water monitoring locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | TSS | | | mg/l | | 18 | 2 | 0 | 0 | | (2.) | TDS | | | mg/l | | 1537 | 594 | 500 | 2000 | | (3.) | Others | Sulphate | | mg/l | | 131.8 | 14.7 | 200 | 400 | | (4.) | Chlorides | | | mg/l | | 474.4 | 69.2 | 250 | 1000 | | (5.) | Heavy Metals | | Cd | mg/l | | 0 | 0 | 0.00 | 0.00 | | (6.) | pH | | | NA | | 8.27 | 7.37 | 6.5 | 8.5 | | (7.) | Total Hardness | | | mg/l | | 428.8 | 116 | 200 | 600 | | (8.) | Fluoride | | | mg/l | | 0.04 | 0.0 | 1 | 1.5 | | (9.) | Heavy Metals | | Arsenic | mg/l | | 0 | 0 | 0.01 | 0.05 | | (10.) | Heavy Metals | | Pb | mg/l | | 0 | 0 | 0.01 | 0.0 | | (11.) | Others | Total Alklinity | | mg/l | | 341 | 267 | 200 | 600 | |
| 14.3. No. of Surface Water monitoring locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | pH | | NA | | 8.05 | 7.01 | E | | (2.) | BOD | | mg/l | | 18 | 0 | E | | (3.) | Others | TSS | mg/l | | 60 | 19 | E | | (4.) | DO | | mg/l | | 6.9 | 4.70 | E | | (5.) | COD | | mg/l | | 64 | 7.5 | E | | (6.) | Others | TDS | mg/l | | 878 | 230 | E | |
| 14.4. No. of Ambient Noise monitoring locations : 8 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Day) | A-weighted decibels(dB(A)) | 71.16 | 48.03 | 75 | | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 67.66 | 42.11 | 70 | |
| 14.5. No. of Soil Sample Monitored locations : 4 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | pH | | | 7.74 | 7.28 | | (2.) | N(Nitrogen) | Milligram per Kilogram | | 397.3 | 203.8 | | (3.) | P(Phosphorus) | Milligram per Kilogram | | 15.2 | 4.04 | | (4.) | K(Potassium) | Milligram per Kilogram | | 5419 | 1224 | | (5.) | Electric Conductivity | Millisiemens per Centimetre | microsiemens per cm | 0.3 | 0.2 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4 To 7 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | Others | GIDC Authority | 27.8 | 0.2 | Copy of Permission Letter | Pipeline | | Others | Pipe Line | NAO/PNL/005/134 | 20 Jul 2019 | 30 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | Domestic | 1.6 | 2 | Soak Pit & Septic Tank | Others | Soak Pit / Septic Tank | 0 | 1.6 | | (2.) | Process | 4.0 | 6.4 | Stripper, ETP And CMEE | Others | Sent to CMEE For ZLD | 0 | 4.0 | | (3.) | Washing | 1.0 | 6.4 | ETP And CMEE | Others | Sent to CMEE For ZLD | 0 | 1.0 | | (4.) | Boiler Blowdown | 0.4 | 6.4 | ETP And CMEE | Others | Sent to CMEE For ZLD | 0 | 0.4 | | (5.) | Cooling | 0.2 | 6.4 | ETP And CMEE | Others | Sent to CMEE For ZLD | 0 | 0.2 | | (6.) | Scrubber | 0.9 | 6.4 | ETP And CMEE | Others | Sent to CMEE For ZLD | 0 | 0.9 | | (7.) | Boiler Condensate Recovery | 33 | 0 | Condensate Recovery System | Reuse within the Plant & Recycling | | 33 | | | (8.) | Scrubber | 1.9 | 0 | Sale to End User | Others | Sale to End User | 0 | 1.9 | |
|
| 16.1. | | (a)Total Waste Water Generation (Kilolitre per Day) | 43 | | (b)Total Discharged Water (Kilolitre per Day) | 10 | | (c)Total Reused Water (Kilolitre per Day) | 33 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | Liq. Ammonia Solution (22-25 Percentage) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 274.08 | Kilolitre | 0 | Others | DRUM / PIPLELINE | Others | Collection Storage And Reuse Inhouse | | (2.) | Aluminium Solution 20-25 Percentage | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 536 | Kilolitre | 10 | Road | | Others | CollectionStorageAndSale to User Under Rule 9 | | (3.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Tons | 10 | Road | | Authorized Recyclers | | | (4.) | Inorganic Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 63 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (5.) | Spent Carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Tons | 10 | Road | | Others | Treatment, Storage and Disposal Facility (CHWIF) | | (6.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 38 | Tons | 10 | Road | | Others | Treatment, Storage and Disposal Facility (CHWIF) | | (7.) | Spent Solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10252 | Tons | 0 | Others | Drum / Pipeline | Others | Collection Storage Recovery and Reuse inhouse | | (8.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 36 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (9.) | Discarded Containers, Liners, Barrels, PP Bags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2.5 | Tons | 10 | Road | | Authorized Recyclers | | | (10.) | HCL Solution 8 to 10 Percentage | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 330 | Kilolitre | 0 | Others | Drum / Pipeline | Others | Collection Storage And Reuse Inhouse | | (11.) | Sodium Bisulphite 22-25 Percentage | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Kilolitre | 10 | Road | | Others | CollectionStorageAndSale to User Under Rule 9 | | (12.) | NaBr Solution 20-22 Percentage | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 183 | Kilolitre | 10 | Road | | Others | CollectionStorageAndSale to User Under Rule 9 | | (13.) | Manganese Dioxide (MnO2) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 863 | Tons | 10 | Road | | Others | CollectionStorageAndSale to User Under Rule 9 | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | PM10 | | Microgram per Meter Cube | 87.03 | 2.4 | 0.07 | 88.10 | 100 | | (2.) | PM2.5 | | Microgram per Meter Cube | 52.02 | 2.4 | 0.04 | 53.06 | 60 | | (3.) | SO2 | | Microgram per Meter Cube | 18.78 | 2.4 | 0.18 | 19.96 | 80 | | (4.) | NOx | | Microgram per Meter Cube | 20.00 | 2.4 | 0.06 | 21.06 | 80 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | Boiler 2 TPH | Bio-Coal/ Coal / Briquette or Natural Gas | 15 | 0.5 | SO2 | | 80 | | (2.) | Reaction Vessel - Bromination | Nil | 11 | 0.2 | Others | HBr | 24 | | (3.) | Thermopack | Bio-Coal / Coal / Briquette or Natural Gas | 15 | 0.5 | Others | SPM | 120 | | (4.) | Boiler 2 TPH | Bio-Coal / Coal / Briquette or Natural Gas | 15 | 0.5 | NOx | | 40 | | (5.) | Thermopack | Bio-Coal / Coal / Briquette or Natural Gas | 15 | 0.5 | SO2 | | 80 | | (6.) | Reaction Vessel - Sulphonation | Nil | 11 | 0.2 | Others | SO2 | 32 | | (7.) | Reaction Vessel | Nil | 11 | 0.2 | Others | NH3 | 140 | | (8.) | Boiler 2 TPH | Bio-Coal / Coal / Briquette or Natural Gas | 15 | 0.5 | Others | SPM | 120 | | (9.) | Thermopack | Bio-Coal / Briquette / Coal or Natural Gas | 15 | 0.5 | NOx | | 40 | | (10.) | DG Set (Standby) | Diesel | 9 | 0.5 | Others | SPM | 120 | | (11.) | DG Set (Standby) | Diesel | 9 | 0.5 | SO2 | | 80 | | (12.) | DG Set (Standby) | Diesel | 9 | 0.5 | NOx | | 40 | | (13.) | Reaction Vessel - Chlorination | Nil | 11 | 0.2 | Others | HCL | 16 | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 250 | | (b)Source | DGVCL (GIDC PANOLI) | | (c)Uploaded Copy of Agreement | Copy of Agreement | | (d)Standby Arrangement (Details of DG Sets) | 125 KVA X 1 Nos | | (e)Stack Height (in m) | 9 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land (ha.) | 0 | | (b)Private Land (ha.) | 0.1977 | | (c)Government Land (ha.) | 0 | | (d)Revenue Land (ha.) | 0 | | (e)Other Land (ha.) | 0 | | Total Land (ha.) | 0.1977 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area (ha.) | 8223 | | (b)Waste/Barren Land (ha.) | 5450 | | (c)Grazing/ Community Land (ha.) | 7136 | | (d)Surface Water Bodies (ha.) | 239 | | (e)Settlements (ha.) | 2178 | | (f)Industrial (ha.) | 2084 | | (g)Forest (ha.) | 0 | | (h)Mangroves (ha.) | 0 | | (i)Marine Area (ha.) | 0 | | (j)Others (ha.) : Agriculture Fallow | 6105 | | Total (ha.) | 31415 | |
|
| 22. Land requirement for various activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
|---|
| (1.) | Green belt | | 0.07 | 40% of Total Plot Area | | (2.) | Main Plant | | 0.12 | All Other Area | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Corridors | NA | 0 | NA | | (2.) | Wildlife Corridors | NA | 0 | NA | | (3.) | ESZs | NA | 0 | NA | | (4.) | WLS | NA | 0 | NA | | (5.) | NPA | NA | 0 | NA | | (6.) | Critically Polluted Area | Ankleshwar GIDC | 9 | Ankleshwar GIDC CPA | | (7.) | ESAs | NA | 0 | NA | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Forest | | NA | 0 | NA | | (2.) | Archaeological Sites | | NA | 0 | NA | | (3.) | Defence Installations | | NA | 0 | NA | | (4.) | Others | NA | NA | 0 | NA | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
| 25. | | Tree Cutting: | | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 0.19 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | 0 | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | 0 | | (b)No. of Households | 0 | | (c)No. of PDFs (Project Displaced Families) | 0 | | (d)No. of PAFs (Project Affected Families) | 0 | | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | | (f)Status of R&R | Yet To Start | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | No | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | | (i)Details of Water Bodies in Core Area | Canal Passing Nearby the Plot on the East Side | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | | (i)Details of Water Bodies in Buffer Area | Panoli Pond | | (ii)Direction of Water Bodies in Buffer Area | North | | (iii)Distance of Water Bodies in Buffer Area | 1.2 | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 0 | | (b)Permanent Employment-During Operation | 10 | | (c)Temporary Employment- During Construction | 10 | | (d)Temporary Employment- During Operation | 0 | | (e)No. of working days | 365 | | (f)Total Manpower | 20 | |
|
| 32. | | Green Belt in Ha: | | (a)Total Area of Green Belt | 0.78 | | (b)Percentage of Total Project Area | 394.54 | | (c)No. of Plants to be Planted | 150 | | (d)Funds Allocated for Plantation | 100000 | | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Environmental | Fund allocation for EMS of 39.0 Lacs | | (2.) | Social | Generating Employment for 20 people. Local people will be given preference | | (3.) | Financial | Fund allocation for CER of 18.0 Lacs for nearby villages | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details For Industrial Projects - 3 |
|
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | Stay Order Againts QCI NABTE | | (ii)Name of the EIA Consultant | GreenLeaf Envirotech Pvt Ltd | | (iii)Address | 3rd Floor, Kankavati Complex, Singanpor Rd, Manipark Society, Singanpor, Surat, Gujarat 395 | | (iv)Mobile No. | 9375964607 | | (v)Landline No. | 0000000 | | (vi)Email Id | shailendrab.umrigar@gmail.com | | (vii)Category of Accreditation | A | | (viii)Sector of Accreditation | Industrial Projects - 3 | | (ix)Validity of Accreditation | 01 Oct 2020 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Detail Sought : NIL |
| Additional Detail Sought: |
|---|
| Sno. | ADS Letter | Remarks | Date of ADS |
|---|
| 1. | NA | |
|