Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed malt based distillery unit of 30 KLD by Microbrew Bistro Pvt. Ltd
(b)Name of the Company / Organisation MICROBREW BISTRO PVT. LTD.
(c)Registered Address 308 competent House, F 14 Connaught Place , New Delhi,,New Delhi,Delhi-110001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Anil Kejriwal
(b)Designation (Owner/ Partner/ CEO) AS
(c)Address 308 competent house F 14 connaught Place, New Delhi,,Connaught Place,New Delhi,Delhi-110001
(d)Pin code 110001
(e)E-mail microbrew2019@gmail.com
(f)STD Code. 11(f)Telephone No. 41087888
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity5(g) Distilleries
(b)Category A
(c)Proposal Number IA/UK/IND2/98132/2019
(d)Master Proposal Number(Single Window) SW/134996/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Nos.933, 934, 936, 937, 938, 940, village M
(b)Pincode 244713
(c)Bounded Latitudes (North) FROM 29820.67 To 29821.77
(d)Bounded Longitudes (East) FROM 785723.11 To 785733.55
(e)Survey of India Topo Sheet No. 53K/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 222
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttarakhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshVisakhapatnamVisakhapatnam (Urban)Kanchara Palem
(2.)UttarakhandUdham Singh NagarKashipur
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/66/2019-IA-II(I)
(b)Date of Apply of TOR 05 Mar 2019
(c)Date of Issue of TOR / Standard ToR 12 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :09 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :0
project site
State :Uttarakhand
District :Udham Singh Nagar
Tehsil :Kashipur
Village :Mahuakheraganj
68The issues raised during the public hearing includes pollution, water conservation, employment and waste water discharge.Othersmunicipal commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)BOILER15 TPH2 Nos.
(2.)Plot area15 acres
(3.)Malt Spirit30 KLD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)MALT SPIRIT30Kilo Litre per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 195
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.9
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.34
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 60
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 60
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Rice husk4395Otherskg per daylocal marketRoad10 Open MarketCopy of Linkage
(2.)Enzymes15Otherskg per daylocal marketRoad10 Open MarketCopy of Linkage
(3.)Yeast65OthersKg/daylocal marketRoad10 Open MarketCopy of Linkage
(4.)barley malt60OthersMT/ daylocal marketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Dec 2018 To 26 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube13.55.512.680
(2.)PM10Micro Gram per Meter Cube116.256.4114.6100
(3.)PM2.5Micro Gram per Meter Cube47.5184760
(4.)NOxMicro Gram per Meter Cube287.627.480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.857.198.58.5
(2.)Total Hardnessmg/l259.3190.1300600
(3.)TSSmg/l50035015002000
(4.)TDSmg/l4293425002000
(5.)Chloridesmg/l78.556.62501000
(6.)Fluoridemg/l0.810.321.01.5
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l46.29.7E
(2.)CODmg/l98.728.7D
(3.)DOmg/l3.91.6E
(4.)pHNA7.826.91A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.651.965
(2.)Leq(Night)A-weighted decibels(dB(A))37.233.855
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare192126
(2.)P(Phosphorus)Kilogram per hectare6119
(3.)Electric ConductivityOthersµmhos /cm.472329
(4.)K(Potassium)Kilogram per hectare205119
(5.)pH7.827.22
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.27 To 14
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.42 To 13
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater5780Copy of Permission LetterPipelineTube Well21-4/1248/UT/IND/201918 Sep 2019578
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic7.510STP-MBBRReuse within the Plant & Recycling7.5
(2.)Trade309350ETPReuse within the Plant & Recycling309
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 316.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 316.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)municipal solid wasteMunicipal Solid Waste8.58Tons10RoadOthersmunicipal department
(2.)Boiler ashBottom Ash130Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Paper waste cartonIndustrial Waste2Tons10RoadAuthorized Recyclers
(4.)PPE bagsIndustrial Waste20Tons10RoadAuthorized Recyclers
(5.)Plastic wastePlastic Waste0.5Tons10RoadAuthorized Recyclers
(6.)Spent grainIndustrial Waste20000Tons10RoadOtherscattle feed
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube75.600.0176.61100
(2.)NOxMicrogram per Meter Cube15.7020.4436.1580
(3.)PM2.5Microgram per Meter Cube000160
(4.)SO2Microgram per Meter Cube9.602.4412.0580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SETHSD300.25PM100.3
(2.)BoilerRice husk305PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4375
(b)Source nearest GSS
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) D.G Sets of cumulative capacity 2000kVA(1000 kAV e
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 6.07
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 6.07
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 13237.0
(b)Waste/Barren Land (ha.) 4198.7
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 321.8
(e)Settlements (ha.) 2603.8
(f)Industrial (ha.) 157.8
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : sandy area,Fallow Land and Open Scrub 12154.4
    Total (ha.) 32673.5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt2.0
Total (ha.) 2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0None within 10 kms of study area
(2.)NPANA0None within 10 kms of study area
(3.)ESAsNA0None within 10 kms of study area
(4.)ESZsNA0None within 10 kms of study area
(5.)CorridorsNA0None within 10 kms of study area
(6.)Wildlife CorridorsNA0None within 10 kms of study area
(7.)Critically Polluted AreaNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestLalipur R.F9.3towards NNW
(2.)Archaeological SitesNone00
(3.)Defence InstallationsNone00
(4.)OthersNANone00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.07
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock or Indian peafowl (Pavocristatus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 202500
(iii)Period of Implementation 3 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bahalla Nadi
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 1.7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 30
(e)No. of working days 330
(f)Total Manpower 230
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2
(b)Percentage of Total Project Area 32.95
(c)No. of Plants to be Planted 2230
(d)Funds Allocated for Plantation 1500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialprovide employment
(2.)FinancialGenerate revenue
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0026(Rev.01)
(ii)Name of the EIA Consultant Gaurang Environmental Solutions Private Limited
(iii)Address 102, SNG Shri ratna Apartment, near tambi Petrol Pump, Jhotwara road Banipark Jaipur
(iv)Mobile No. 9784671462
(v)Landline No. 0141402911
(vi)Email Id gaurangenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 22 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

The EAC, after detailed deliberations decided to defer for want of requisite information as under and have asked the PP to revise the Report alongwith following clarification/inputs:-

          

24 Apr 2020
2. ADS LetterReply for the ADS generated during the 18th EAC Meeting dated 13-15 april 2020. for youyr kind perusal. 01 Jun 2020
3. ADS Letters 10 Jul 2020
4. ADS LetterReply for the ADS generated during the 18th EAC Meeting dated 13-15 april 2020. for youyr kind perusal. 10 Jul 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAnil Kejriwal
DesignationAS
Name of Company (Applicant Name should not be given here)MICROBREW BISTRO PVT. LTD.
Address308 competent House, F 14 Connaught Place , New Delhi
Print