Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Integrated Cement Project - Clinker (1.48 to 4.38 MTPA), Cement (2.28 to 6.14 MTPA), CPP (25 to 60 MW) and WHRB (4.7 to 15 MW) at Villages - Nimbol and Sinla, Tehsil - Jaitaran, District
(b)Name of the Company / Organisation NIRMA LIMITED
(c)Registered Address Nirma Ltd., Nirma House, near Income Tax Office, Ashram Road, Ahmedabad.,,Ahmedabad,Gujarat-380009
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ashish Desai
(b)Designation (Owner/ Partner/ CEO) Project Coordinator
(c)Address Nirma Ltd., Nirma House, Near Income Tax Office, Ashram Road, Ahmedabad.,,Ahmedabad City,Ahmedabad,Gujarat-380009
(d)Pin code 380009
(e)E-mail opmoondra@nirma.co.in
(f)STD Code. 79(f)Telephone No. 27549319
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity3(b) Cement plants
(b)Category A
(c)Proposal Number IA/RJ/IND/56521/2011
(d)Master Proposal Number(Single Window) SW/114413/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Modernization
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Map along with Khasra list is enclosed
(b)Pincode 306308
(c)Bounded Latitudes (North) FROM 261931.29 To 262011.25
(d)Bounded Longitudes (East) FROM 735018.94 To 735117.78
(e)Survey of India Topo Sheet No. 45 F/11 & 45 F/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 208
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/1/2010-IA II (I)
(c)Date of Issue of TOR 03 May 2010
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 26 Nov 2010
(c)Date of Issue of EC 29 Mar 2011
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :1.0
Government Upper Primary School
State :Rajasthan
District :Pali
Tehsil :Jaitaran
Village :Sinla
73Issues related to Employment, Plantation, Pollution, CSR related, Land related and others were raised during the Public hearingDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/Ind-130/820/2011/17 dated 09.04.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 9 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement2.283.866.14OthersMTPARoad
(2.)Clinker1.482.94.38OthersMTPARoad
(3.)CPP253560Mega Watt(MW)OthersCaptive Use
(4.)WHRS4.710.315Mega Watt(MW)OthersCaptive Use
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Limestone Stacker1000 TPH1000 TPH1000 + 1000 TPH
(2.)Additives Stacker200 TPH200 TPH200 + 200 TPH
(3.)Coal Reclaimer100 TPH100 TPH100 + 100 TPH
(4.)Coal and Pet coke mill38 TPH70 TPH38 + 70 TPH
(5.)Kiln4100 TPD6000 TPD4100 + 6000 TPD
(6.)Packer3 Nos, 12 spouts double discharge type each3 Nos, 12 spouts single discharge type each6 Nos, 12 spouts single discharge type each
(7.)CPP Boiler140 TPH170 TPH140 + 170 TPH
(8.)Waste Heat Recovery Boilers4.7 MW10.3 MW4.7 + 10.3 MW
(9.)Additives Reclaimer150 TPH150 TPH150 + 150 TPH
(10.)Raw Mill (VRM)350 TPH600 TPH350 + 600 TPH
(11.)CPP Turbine25 MW35 MW25 + 35 MW
(12.)Limestone Reclaimer750 TPH750 TPH750 + 750 TPH
(13.)Cement Mill355 TPH350 TPH355 + 350 TPH
(14.)Crusher1000 TPH1000 TPH1000 + 1000 TPH
(15.)Coal stacker200 TPH200 TPH200 + 200 TPH
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Oct 2017
(iv)Valid Upto 31 Aug 2022
(v)File No. F(CPM)/Pali(Jaitaran)/2683(1)/2016-2017/6226-6228
(vi)Application No. 181182
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 950
(b) Funds Allocated for Environment Management (Capital) (in Crores) 40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.6
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6.415
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 6.415
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Limestone6.57OthersMTPALimestone MinesRoad10 OthersCaptive & MoUCopy of Linkage
(2.)Fly ash1.84OthersMTPACPP, Suratgarh, Kota & Barmer (JSW)Road370 LOACopy of Linkage
(3.)Coal1.43OthersMTPABhavnagar Port & Kandla Port (Imported)Road670 OthersFuel Supply Agreement & LOACopy of Linkage
(4.)Silica Sand0.27OthersMTPANearby MarketRoad10 Open MarketCopy of Linkage
(5.)GYPSUM0.3OthersMTPABhavnagar, Gujarat; RSSM & FCI, RajasthanRoad670 OthersCaptive & LoACopy of Linkage
(6.)Red Ochre/Iron Ore0.44OthersMTPAChhoti Sadri, Bhilwara, ChittorgarhRoad375 LOACopy of Linkage
(7.)Lignite0.97OthersMTPABarmer Nagaur, RajasthanRoad375 Open MarketCopy of Linkage
(8.)Petcoke0.97OthersMTPABhavnagar Port & Kandla Port (Imported)Road670 LOACopy of Linkage
(9.)Clay0.37OthersMTPANearby marketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube89.359.488.7100
(2.)PM2.5Micro Gram per Meter Cube48.427.347.960
(3.)SO2Micro Gram per Meter Cube12.97.112.880
(4.)NOxMicro Gram per Meter Cube26.914.326.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.317.068.58.5
(2.)TDSmg/l14808105002000
(3.)Total Hardnessmg/l480.70288200600
(4.)Chloridesmg/l428.35272.262501000
(5.)Fluoridemg/l0.850.5811.5
(6.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00E
(2.)CODmg/l00E
(3.)BODmg/l00E
(4.)DOmg/l00E
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))67.152.175
(2.)Leq(Night)A-weighted decibels(dB(A))57.342.270
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare292.74173.95
(2.)P(Phosphorus)Kilogram per hectare17.748.02
(3.)K(Potassium)Kilogram per hectare192.46124.45
(4.)Electric ConductivityMillisiemens per Centimetre0.240.20
(5.)pH7.647.41
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 80 To 90
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 60 To 70
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater25000Copy of Permission LetterPipelineTube Well21- 4(493)/WR/CGWA/2011- 495210 Dec 20121123
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Boiler Blow Down25100Neutralization PitOthersUsed for dust supression250
(2.)RO reject275500Neutralization PitOthersUsed for dust supression2750
(3.)Domestic Waste Water136170Sewage Treatment PlantOthersUsed for greenbelt development / plantation1360
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 436
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 436
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Fly ashFly Ash140000Tons0OthersClosed BulkersOthersUtilized for manufacturing of PP Cement
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30.9Kilolitre480RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube89.30.981.5290.83100
(2.)PM2.5Microgram per Meter Cube48.40048.560
(3.)SO2Microgram per Meter Cube12.920.6513.5680
(4.)NOxMicrogram per Meter Cube26.920.7127.6280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Raw Mill / Kiln - Line-ICoal, Petcoke and Lignite14013.6NOx34.04 g/sec
(2.)Clinker Cooler - Line-INA604.5PM103.69 g/sec
(3.)Coal Mill - Line-INA89.52.4PM101.98 g/sec
(4.)Cement Mill - Line-INA512.4PM104.34 g/sec
(5.)CPP Boiler - Line-ICoal & Lignite1016.8PM103.15 g/sec
(6.)CPP Boiler - Line-ICoal & Lignite1016.8SO219.30 g/sec
(7.)Raw Mill / Kiln - Line-IICoal, Petcoke & Lignite14013.6SO214.53 g/sec
(8.)Raw Mill / Kiln - Line-IICoal, Petcoke & Lignite14013.6NOx40.36 g/sec
(9.)Clinker Cooler - Line-IINA604.5PM104.27 g/sec
(10.)CPP Boiler - Line-IICoal & Lignite1016.8PM103.77 g/sec
(11.)CPP Boiler - Line-IICoal & Lignite1016.8SO222.69 g/sec
(12.)Raw Mill / Kiln - Line -ICoal, Petcoke and Lignite14013.6PM106.18 g/sec
(13.)Raw Mill / Kiln - Line -ICoal, Petcoke and Lignite14013.6SO212.74 g/sec
(14.)Raw Mill / Kiln - Line-IICoal, Petcoke & Lignite14013.6PM107.10 g/sec
(15.)Coal Mill - Line-IINA89.52.4PM102.45 g/sec
(16.)CPP Boiler - Line-IICoal & Lignite1016.8NOx15.12
(17.)CPP Boiler - Line-ICoal & Lignite1016.8NOx12.8 g/sec
(18.)Cement Mill - Line-IINA512.4PM105.39
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 68500
(b)Source CPP, RSEB, WHRB & DG Set (for backup)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 4.8 MW
(e)Stack Height (in m) 32
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 95.764
    Total Land (ha.) 95.764
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 95.764
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub Land 0
    Total (ha.) 95.764
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant26.5
(2.)Township1.4
(3.)Green belt31.6
(4.)OthersOpen area36.264
Total (ha.) 95.764
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANot applicable0No NPA within 10 km radius
(2.)ESAsNot applicable0No ESA within 10 km radius
(3.)ESZsNot applicable0No ESZ within 10 km radius
(4.)CorridorsNot applicable0No Corridor within 10 km radius
(5.)Critically Polluted AreaNot applicable0No Critically Polluted Area within 10 km radius
(6.)WLSNot applicable0No WLS within 10 km radius
(7.)Wildlife CorridorsNot applicable0No wildlife corridor within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot applicable0No Forest within 10 km radius
(2.)Archaeological SitesNot applicable0No Archaeological Site within 10 km radius
(3.)Defence InstallationsNot applicable0No Defense Installation within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 95.764
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peafowl & Monitor Lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 30 Lacs
(iii)Period of Implementation 10 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Luni Nadi
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 3.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 125
(b)Permanent Employment-During Operation 125
(c)Temporary Employment- During Construction 1500
(d)Temporary Employment- During Operation 250
(e)No. of working days 26
(f)Total Manpower 2000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt24.47.231.599999999999998
(2.)Percentage of Total Project Area26733
(3.)No. of Plants470004577092770
(4.)Funds Allocated7400000300000010400000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenery of the area will be increased
(2.)SocialEmployment generation and upliftment of the nearby villagers through CER
(3.)FinancialRevenue generation for State and Centre in terms of taxes etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Gurugram (Haryana)
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

NIL

13 Mar 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAshish Desai
DesignationProject Coordinator
Name of Company (Applicant Name should not be given here)NIRMA LIMITED
AddressNirma Ltd., Nirma House, near Income Tax Office, Ashram Road, Ahmedabad.