1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Extension of runway with blast pad, RESA, taxiway, Apron, GSE area, isolation bay, construction of new domestic terminal building, ATC tower cum Technical block cum fire station and other Miscellaneou
(b)Name of the Company / Organisation AIRPORTS AUTHORITY OF INDIA KOLHAPUR
(c)Registered Address Airports Authority of India Kolhapur Airport,Kolhapur,Maharashtra-416004
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kamal Kataria
(b)Designation (Owner/ Partner/ CEO) AirportDirector
(c)Address NIL
(d)Pin code 416004
(e)E-mail kolhapurairport@gmail.com
(f)STD Code. 231(f)Telephone No. 2677352
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity7(a) Air ports
(b)Category A
(c)Proposal Number IA/MH/MIS/112661/2018
(d)Master Proposal Number(Single Window) SW/112660/2019
(e)EAC concerned (for category A Projects only) Infrastructure and Miscellaneous Projects  +  CRZ
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Govt Land
(b)Pincode 416004
(c)Bounded Latitudes (North) FROM 16.6594 To 16.6691
(d)Bounded Longitudes (East) FROM 74.2757 To 74.3023
(e)Survey of India Topo Sheet No. E43U2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 614
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.85
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraKolhapurKarvirMudsinghi and Ujalaiwadi
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of EC NIL
(c)Date of Issue of EC NIL
(d)Previous EC Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :26 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project Site
State :Maharashtra
District :Kolhapur
Tehsil :Karvir
Village :Ujalaiwadi
106Employment, impact on noise, restriction of developments, expansion orientation, etc.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. Nil
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Airport303.7537.59341.34000000000003Hectares(ha)OthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Runway1370 x 45 m930 x 45 m2300 x 45 m
(2.)GSE Area075 x 20 m75 x 20 m
(3.)Terminal Building174.673900 Sq.m.3900 Sq.m.New building will be utilised
(4.)Taxiway0239 x 23 m239 x 23 m
(5.)Apron82 x 52 m148.5 x 93.5 m148.5 x 93.5 m
(6.)ATC Tower cum Technical Block cum Fire Station085008500 sq.m.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Jun 2019
(iv)Valid Upto 28 Feb 2020
(v)File No. 1906000316
(vi)Application No. 51286
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 275
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.67
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)..0OthersNA0OthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 19 Mar 2018 To 14 Jun 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube82.134.877.2100
(2.)SO2Micro Gram per Meter Cube13.34.612.780
(3.)OthersCOMili Gram per Meter Cube0.900.190.830.83
(4.)PM2.5Micro Gram per Meter Cube43183960
(5.)NOxMicro Gram per Meter Cube26.89.42580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.326.866.58.5
(2.)TSSmg/l0000
(3.)Total Hardnessmg/l270124200600
(4.)Chloridesmg/l88212501000
(5.)Fluoridemg/l0.650.161.01.5
(6.)Heavy MetalsZincmg/l0.240.04515
(7.)TDSmg/l3821765002000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.927.53C
(2.)DOmg/l7.66.7C
(3.)CODmg/l1712.4C
(4.)BODmg/l2.62C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.351.655
(2.)Leq(Night)A-weighted decibels(dB(A))50.240.445
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.016.58
(2.)N(Nitrogen)Kilogram per hectare612246
(3.)P(Phosphorus)Kilogram per hectare72.136.8
(4.)K(Potassium)Kilogram per hectare371177
(5.)Electric ConductivityMillisiemens per Centimetre0.3160.048
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC9510 Not Appliacble PipelineOthersPipelineNil01 Jan 1990100
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage108.5120MBBR technology based STPReuse within the Plant & Recycling,Green Belt Renewal Plant108.5
16.1.
(a)Total Waste Water Generation 108.5
(b)Total Discharged Water 0
(c)Total Reused Water 108.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste75Tons10RoadSanitary Landfills
(2.)STP SludgeOthersSTP3.7Tons0OthersNAOthersManure in green belt development
(3.)Used / Spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Tons20RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube82.10.50.9383.04100
(2.)PM2.5Microgram per Meter Cube430.50.9343.9460
(3.)NOxMicrogram per Meter Cube26.80.52.8629.780
(4.)SO2Microgram per Meter Cube13.30.52.691680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Sets (2 x 750 KVA)Diesel70.3PM100.04
(2.)DG sets (2 x 750 KVA)Diesel70.3SO20.11
(3.)DG Sets (2 x 750 KVA)Diesel70.3NOx0.14
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 625
(b)Source Maharashtra state electricity distribution company
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 750 KVa
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land 10.93
(b)Private Land 0
(c)Government Land 303.74
(d)Revenue Land 0
(e)Other Land 26.67
    Total Land 341.34
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 26.67
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 303.74
(g)Forest 10.93
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 341.34000000000003
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant23.7
(2.)Green belt90
(3.)OthersOpen and landscaping227.64
Total 341.34
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil
(2.)WLSNil0Nil
(3.)NPANil0-
(4.)ESZsNil0-
(5.)CorridorsNil0-
(6.)Wildlife CorridorsNil0-
(7.)ESAsNil0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0-
(2.)ForestUnclassified0Part of project area
(3.)Defence InstallationsNil0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 60
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 303.75
(b)Land yet to be acquired(Ha) 37.59
(c)Status of Land acquisition if not acquired Progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 100
(e)No. of working days 365
(f)Total Manpower 340
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt39093
(2.)Percentage of Total Project Area126.427.4
(3.)No. of Plants30050005300
(4.)Funds Allocated2.53032.5
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialBetter air connectivity to kolhapur region
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Infrastructure and Miscellaneous Projects  +  CRZ
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 20
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 2
(d)Total plot area (sqm) 3413402
(e)Total built up area (sqm) 7400
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 17
(d)Capacity 28
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 100 Cars & 10 Buses
5.
Energy Saving Measures:
(a)Source/Mode Solar power generation plant
(b)Percentage 30
(c)Quantity 100
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No water body will be affected
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
Additional Detail Sought:   NIL ,w ,3.NIL
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno Labs India Private Limited
(iii)Address ABC Tower, No. 400, 13th Street, SIDCO Industrial Estate - North Phase, Ambattur, Chennai - 600098
(iv)Mobile No. 9566067777
(v)Landline No. 0442625778
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Infrastructure and Miscellaneous Projects  +  CRZ
(ix)Validity of Accreditation 25 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKamal Kataria
DesignationAirportDirector
Name of Company (Applicant Name should not be given here)AIRPORTS AUTHORITY OF INDIA KOLHAPUR
AddressAirports Authority of India Kolhapur Airport
Print