Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Industrial Model Township, Kharkhoda, Sonepat, Haryana
(b)Name of the Company / Organisation HARYANA STATE INDUSTRIES AND INFRASTRUCTURE DEVELOPMENT CORPORATION HSIIDC
(c)Registered Address HSIIDC, Plot No C-13-14, Sector-6, panchkula, haryana,Sonipat,Haryana-131001
(d)Legal Status of the Company State PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant HSIIDC Haryana
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address HSIIDC, Kharkhoda, SOnepat, Haryana,,Kharkhoda,Sonipat,Haryana-131001
(d)Pin code 131001
(e)E-mail infosmiakundli@gmail.com
(f)STD Code. 130(f)Telephone No. 2370586
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
(b)Category A
(c)Proposal Number IA/HR/NCP/62795/2017
(d)Master Proposal Number(Single Window) SW/108752/2019
(e)EAC concerned (for category A Projects only) New Construction Projects and  Industrial  Estates
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Kharkhoda
(b)Pincode 131402
(c)Bounded Latitudes (North) FROM 284935.92 To 285003.98
(d)Bounded Longitudes (East) FROM 765442.38 To 765812.05
(e)Survey of India Topo Sheet No. 53D13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 222
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaSonipatKharkhodaKharkhoda
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 21-237/2017-IA.III
(c)Date of Apply of TOR 09 Jun 2017
(d)Date of Issue of TOR / Standard ToR 23 Aug 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :0
Kharkhoda
State :Haryana
District :Sonipat
Tehsil :Kharkhoda
Village :Kharkhoda
31Basic issues related to employment and social developmentDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Industrial Model Township Kharkhoda1301.95 hectare
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1301.951301.95HectaresRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.46
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 80
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.46
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coarse Sand0Tons per AnnumNearby AreaRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube255.9133.3253.6100
(2.)SO2Micro Gram per Meter Cube14.17.21480
(3.)NOxMicro Gram per Meter Cube4724.345.980
(4.)PM2.5Micro Gram per Meter Cube129.764.7128.560
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l218112605002000
(2.)Total Hardnessmg/l810450200600
(3.)Fluoridemg/l1.20.711.5
(4.)TSSmg/l218112605002000
(5.)Heavy MetalsZincmg/l10.6515
(6.)Chloridesmg/l5623302501000
(7.)pHNA8.127.096.58.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l4.12.8A
(2.)pHNA7.927.02A
(3.)CODmg/l1610A
(4.)DOmg/l75.4A
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.448.375
(2.)Leq(Night)A-weighted decibels(dB(A))55.739.165
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram10.37.1
(2.)K(Potassium)Milliequivalents per 100 Gram0.450.28
(3.)Electric ConductivityMillisiemens per Centimetre16.413.4
(4.)N(Nitrogen)Percent39.933.5
(5.)pH8.167.56
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.57 To 24.84
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.64 To 22.46
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface872755.2Copy of Permission LetterCanalOthersCanal1170-73/Const14 Jun 201166150
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Waste Water From Site6390063900CETPReuse within the Plant & Recycling,Green Belt Renewal Plant63900
16.1.
(a)Total Waste Water Generation 63900
(b)Total Discharged Water 0
(c)Total Reused Water 63900
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteIndustrial WasteDomestic Waste131Tons0RoadOthersTSDF, Authorised Recycler
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube255.90.70.22256.13100
(2.)PM2.5Microgram per Meter Cube129.70.70.22129.9360
(3.)NOxMicrogram per Meter Cube51.20.76.557.880
(4.)SO2Microgram per Meter Cube14.10.70.815.080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel300.332PM100.0375
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1890 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 1301.95
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1301.95
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 41900.74
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 255.74
(e)Settlements 3396.04
(f)Industrial 0
(g)Forest 232.8
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Open Land, Open Scrub, Vegetation 2363.18
    Total 48148.5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersIndustrial Model Township1301.95Hectare
Total 1301.95
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil
(2.)ESZsNil0Nil
(3.)CorridorsNil0Nil
(4.)Wildlife CorridorsNil0Nil
(5.)ESAsNil0Nil
(6.)WLSNil0Nil
(7.)NPANil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0Nil
(2.)Defence InstallationsNil0Nil
(3.)ForestSultanpur Dabas8Reserve Forest
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1301.95
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Aquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 10
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 5100
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50000
(c)Temporary Employment- During Construction 600
(d)Temporary Employment- During Operation 49400
(e)No. of working days 365
(f)Total Manpower 100000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 433.62
(b)Percentage of Total Project Area 33.31
(c)No. of Plants to be Planted 202400
(d)Funds Allocated for Plantation 20240000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For New Construction Projects and  Industrial  Estates
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 100
(b)Total No. of Flats to be Build 1379
(c)No. of Buildings 3109
(d)Total plot area (sqm) 13019506
(e)Total built up area (sqm) 4449721
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 32
(d)Capacity 3200
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 5947
5.
Energy Saving Measures:
(a)Source/Mode LED CFL SOLAR
(b)Percentage 2
(c)Quantity 10
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Nil
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
(1.)Category B as per EIA Notification2614B
(2.)Category A as per EIA Notification475A
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
Additional Detail Sought Additional Detail Sought, 3.
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0064
(ii)Name of the EIA Consultant Grass Roots Research and Creation India Pvt. Ltd.
(iii)Address F-375, Sector-3, Noida
(iv)Mobile No. 9811554031
(v)Landline No. 0120404463
(vi)Email Id eia@grc-india.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation New Construction Projects and  Industrial  Estates
(ix)Validity of Accreditation 04 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NA

Considering above mentioned points, EAC after detailed deliberation during its 222nd meeting on 20th August, 2019, deferred the proposal for want of following information/clarification/documents:

(i) EIA/EMP as per approved ToR along with clarity on project area, boundaries, industrial units to be housed within the proposed Industrial Model Township. The PP was asked to submit revised EIA/EMP accordingly.

(ii) Revised land use plan and layout of the proposed site as per approved ToR and which to be mentioned in EIA/EMP report accordingly.

(iii) Clarity about villages and people residing therein along with issues related to R&R and land pooling etc., be provided.

30 Aug 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHSIIDC Haryana
DesignationGM
Name of Company (Applicant Name should not be given here)HARYANA STATE INDUSTRIES AND INFRASTRUCTURE DEVELOPMENT CORPORATION HSIIDC
AddressHSIIDC, Plot No C-13-14, Sector-6, panchkula, haryana
Print