Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Installation of 100 KLPD Lingo-Cellulosic 2G Ethanol Plant at Gram Panchayat Baholi, Block Madlauda, Panipat Refinery Road, Panipat-132140, District Panipat, Haryana
(b)Name of the Company / Organisation INDIAN OIL CORPORATION LIMITED. PANIPAT REFINERY & PETROCHEMICAL COMPLEX
(c)Registered Address PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140,Panipat,Haryana-132140
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant PRAVEEN NAGPAL
(b)Designation (Owner/ Partner/ CEO) CGM HS&E
(c)Address PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140,PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140,Panipat,Panipat,Haryana-132140
(d)Pin code 132140
(e)E-mail phandab@indianoil.in
(f)STD Code. 180(f)Telephone No. 2522011
(g)Fax No. 25788833
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity5(g) Distilleries
(b)Category A
(c)Proposal Number IA/HR/IND2/72123/2018
(d)Master Proposal Number(Single Window) SW/108525/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra No. 44/1 to 4 and 6 to 25 and Khasra No. 45
(b)Pincode 132140
(c)Bounded Latitudes (North) FROM 29.2851 To 29.2982
(d)Bounded Longitudes (East) FROM 76.5316 To 76.5326
(e)Survey of India Topo Sheet No. H43Q15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 242
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaPanipatPanipatBaholi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/43/2018-IA-II(I)
(b)Date of Apply of TOR 20 Feb 2018
(c)Date of Issue of TOR / Standard ToR 05 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Feb 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :27 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
Adjacent to existing Panipat Refinery
State :Haryana
District :Panipat
Tehsil :Panipat
Village :Baholi
95Infrastructure Development , EmploymentDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)2G Ethanol Plant100 KLPDProcess Flow Diagram is given in EIA report
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ethanol100Kilo Litre per DayPipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 766
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.745
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 426
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 426
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Rice Straw426OthersTons Per dayNearby FarmsRoad50 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube25.481824.5980
(2.)PM10Micro Gram per Meter Cube95.7677.095.6100
(3.)PM2.5Micro Gram per Meter Cube58.347.757.660
(4.)NOxMicro Gram per Meter Cube35.152635.0780
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.900.211.01.5
(2.)TSSmg/l0000
(3.)Chloridesmg/l65322501000
(4.)Total Hardnessmg/l391189200600
(5.)Heavy MetalsCoppermg/l000.051.5
(6.)pHNA8.677.400
(7.)TDSmg/l4872575002000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.14.4B
(2.)pHNA7.87.4B
(3.)CODmg/l7424B
(4.)BODmg/l219B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))452770
(2.)Leq(Day)A-weighted decibels(dB(A))6444.675
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram8.26.1
(2.)pH9.67.9
(3.)K(Potassium)Milligram per Kilogram41.7829.31
(4.)N(Nitrogen)OthersKg per hectare224.8143
(5.)Electric ConductivityOthersmicro ohms /cm850129
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface30003Copy of Permission LetterPipelineOthersWestern Yamuna CanalAgreement no. 2999014 Mar 201873397
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process Condensate Blowdown10001000Effluent Treatment PlantReuse within the Plant & Recycling1000
16.1.
(a)Total Waste Water Generation 1000
(b)Total Discharged Water 0
(c)Total Reused Water 1000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Dewatered SludgeIndustrial Waste2000Tons50RoadOthersAs a manure
(2.)AshFly Ash40000Tons50OthersClosed TrucksCo-Processing
(3.)MudOthersMud3000Tons50OthersTractor TrolleyOthersBack to Farm Land
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube25.40.312.527.9180
(2.)PM2.5Microgram per Meter Cube58.30.310.2558.660
(3.)PM10Microgram per Meter Cube95.760.310.596.3100
(4.)NOxMicrogram per Meter Cube35.150.31136.2580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Process BoilerLignin rich cake & conc. syrup852.75SO237
(2.)Process BoilerLignin rich cake & conc. syrup852.75PM105.3
(3.)Process BoilerLignin rich cake & conc. syrup852.75NOx6
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 15000
(b)Source From Panipat Refinery Captive Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 DG of 2000 kva
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 14.02
    Total Land 14.02
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Land Owned By Panipat Refinery 14.02
    Total 14.02
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant6.454Process Plant and Utilities
(2.)Green belt4.53
(3.)OthersParking, Existing Building,Corridor3.036
Total 14.02
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0Not Applicable
(2.)ESAsNot Applicable0Not Applicable
(3.)ESZsNot Applicable0Not Applicable
(4.)Wildlife CorridorsNot Applicable0Not Applicable
(5.)NPANot Applicable0Not Applicable
(6.)CorridorsNot Applicable0Not Applicable
(7.)WLSNot Applicable0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot Applicable0Not applicable
(2.)ForestNot Applicable0Not applicable
(3.)Defence InstallationsNot Applicable0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 14.02
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Munak Regulator on Western Yamuna Canal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 1325
(d)Temporary Employment- During Operation 15
(e)No. of working days 300
(f)Total Manpower 1385
32.
Green Belt in Ha:
(a)Total Area of Green Belt 4.536
(b)Percentage of Total Project Area 32.35
(c)No. of Plants to be Planted 1150
(d)Funds Allocated for Plantation 3500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialemployment
(2.)Environmental(1) Revenue: The proposed project will contribute to reviving the economy through forex saving, generating tax revenue and GST revenues. The blending of 2G ethanol in gasoline will save INR 84 Crore of Forex at the current rate. (2) Renewable: This project is a noble step in utilizing renewable and environment-friendly sources of energy- ethanol to supplement fossil fuels. Reduction in emissions due to the more complete burning of ethanol in the presence of the oxygen molecule within ethanol. (
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
Additional Detail Sought:   NIL ,w ,3.NIL
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Section-33 A of Water Act,1974
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Complied
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Technolabas India Pvt. Ltd.
(iii)Address #400,13th Street,SIDCO Industrial State ,Ambattur,Chennai
(iv)Mobile No. 9821572427
(v)Landline No. 0442625779
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPRAVEEN NAGPAL
DesignationCGM HS&E
Name of Company (Applicant Name should not be given here)INDIAN OIL CORPORATION LIMITED. PANIPAT REFINERY & PETROCHEMICAL COMPLEX
AddressPO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140