Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Jakhol Sankri Hydro Electric Project (44 MW)
(b)Name of the Company / Organisation SJVN CORPORATE ENVIRONMENT
(c)Registered Address SJVN Corporate Office, Shakti Sadan, Shanan, Shimla (HP),Shimla,Himachal Pradesh-171006
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant DEVJANI PATRA
(b)Designation (Owner/ Partner/ CEO) DGM
(c)Address NIL
(d)Pin code 171006
(e)E-mail sjvn.ecfc@gmail.com
(f)STD Code. 177(f)Telephone No. 2660198
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity1(c) River Valley projects
(b)Category A
(c)Proposal Number IA/UK/RIV/41642/2016
(d)Master Proposal Number(Single Window) SW/107691/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Dhara Jakhol, Sunkundi, Paon Malla, Sawani, Paon T
(b)Pincode 249193
(c)Bounded Latitudes (North) FROM 31.08861 To 31.11833
(d)Bounded Longitudes (East) FROM 78.18611 To 78.23527
(e)Survey of India Topo Sheet No. 53 1/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1959.4
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttarakhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/07/2016-IA-I (R)
(b)Date of Apply of TOR 20 Jan 2016
(c)Date of Issue of TOR / Standard ToR 07 Jun 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :14
Vikas Khand Karvalaye Parisar
State :Uttarakhand
District :Uttarkashi
Tehsil :Mori
Village :Mori
136Broadly following issues were raised: a) Infrastructure development b) Education and health facilities c) Employment d) Compliance to environmental norms w.r.t noise, air, water e) Compensation.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANAHYDROPOWER
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Electricity166.19OthersMillion Units/AnnumOthersTransmission on grid
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 340.3687
(b) Funds Allocated for Environment Management (Capital) (in Crores) 55.38
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7.23
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 13.85
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Nil0OthersNilNilOthersNil0 OthersNilCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Jan 2017 To 30 Sep 2017
(b)Season Three-Sesions
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube703167.2100
(2.)PM2.5Micro Gram per Meter Cube35833.160
(3.)NOxMicro Gram per Meter Cube706.6480
(4.)SO2Micro Gram per Meter Cube11.1011.0180
    14.2.     No. of Ground Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOtherspH7.627.126.58.5
(2.)TDSmg/l60285002000
(3.)Heavy Metalsmercurymg/l0.0010.0010.0010.001
(4.)Chloridesmg/l5.571.542501000
(5.)Fluoridemg/l0.320.1911.5
(6.)Total Hardnessmg/l4421200600
(7.)Heavy Metalszincmg/l0.010.01515
(8.)OthersCOLIFORM ORGANISMOthersMPN0000
(9.)Heavy MetalsChromiummg/l0.010.010.050.05
(10.)OthersMagnesiummg/l1.940.00530100
(11.)Heavy MetalsCoppermg/l0.010.010.051.5
(12.)Heavy MetalsArsenicmg/l0.010.010.010.05
(13.)Othersphenolic compoundsmg/l0.0010.0010.0010.002
(14.)Heavy Metalscadmiummg/l0.010.0010.0030.003
(15.)Heavy Metalsleadmg/l0.010.010.010.01
(16.)OthersCALCIUMmg/l14.434.8175200
(17.)TSSmg/l5.9000000000
(18.)Heavy MetalsIRONmg/l1.6.03.3.3
(19.)OthersNITRATEmg/l2.9.024545
(20.)OthersSULPHATEmg/l16.671.66200400
(21.)OthersTOTAL ALKALINITY AS CALCIUM CARBONATEmg/l36.1814.38200600
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l00B
(2.)DOmg/l8.98.1B
(3.)BODmg/l00B
(4.)OthersCONDUCTIVITYOthersmicrosimmonds/cm79.453.7B
(5.)OthersNitratemg/l2.10.016B
(6.)OthersSulphatemg/l16.143.1B
(7.)OthersSodiummg/l4.8.05B
(8.)OthersMagnesiummg/l3.40.005B
(9.)OthersTotal Alkalinity as Calcium Carbonatemg/l40.212.36B
(10.)OthersResidual Sodium Carbonatemg/l00B
(11.)OthersPhosphatesmg/l0.60.01B
(12.)OthersTotal Kjeldahl Nitrogenmg/l4.720.91B
(13.)OthersFaecal ColiformOthersMPN00B
(14.)OthersFluoridemg/l.6.1B
(15.)OthersTDSmg/l5034B
(16.)OthersArsenicmg/l0.010.01B
(17.)OthersCalciummg/l16.033.21B
(18.)OthersIronmg/l1.80.01B
(19.)pHNA7.756.81B
(20.)OthersCoppermg/l.01.01B
(21.)OthersVolatile Suspended Solidsmg/l140B
(22.)OthersSodiummg/l4.80.05B
(23.)OthersMercurymg/l.001.001B
(24.)OthersZincmg/l.01.01B
(25.)OthersLeadmg/l.01.01B
(26.)OthersTotal Hardness as Calcium Carbonatemg/l4420B
(27.)OthersAmmonical Nitrogenmg/l1.40B
(28.)OthersCadmiummg/l.001.001B
(29.)OthersTSSmg/l501B
(30.)Othersphenolic compoundsmg/l0.0010.001B
(31.)OthersPotassiummg/l9.61.5B
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))463455
(2.)Leq(Night)A-weighted decibels(dB(A))37.433.245
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram9542.72599.3
(2.)pH7.635.25
(3.)P(Phosphorus)Milligram per Kilogram349.681.53
(4.)N(Nitrogen)Percent1.680.05
(5.)Electric ConductivityOthersmillimohs/cm0.2080.031
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.79 To 56.28
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.06 To 53.58
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface9849600Copy of Permission LettermodeOthersHRTBarrage624/1/2019-04(08)/77/200503 Jun 2019984960
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DOMESTIC SEWAGE0.180.20STPOthersDRY BEDS0.100.08
16.1.
(a)Total Waste Water Generation 0.18
(b)Total Discharged Water 0.08
(c)Total Reused Water 0.1
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid WasteMunicipal Solid Waste25.55Tons3RoadOthersRecyclers
(2.)Municipal Solid WasteMunicipal Solid Waste124.1Tons7.5RoadSanitary Landfills
(3.)Municipal Solid WasteMunicipal Solid Waste94.9Tons3RoadOthersComposting
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5NA00010
(2.)PM10NA00010
(3.)SO2NILNA00010
(4.)NOxNA00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NilNil00Othersnil0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5000
(b)Source DG Sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NIL
(e)Stack Height (in m) 5.5
20.
Land Ownership Pattern:
(a)Forest Land 2.25
(b)Private Land 15.681
(c)Government Land 22.067
(d)Revenue Land 0
(e)Other Land 0
    Total Land 39.998
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 2593.65
(b)Waste/Barren Land 3160.42
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 522.34
(e)Settlements 125.01
(f)Industrial 0
(g)Forest 17140.3
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Open vegetation, alpine pasture land, snow covered 23820.81
    Total 47362.53
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant27.5318Inc office, roads, components, notional
(2.)Township1.663
(3.)Quarry Area2.25
(4.)OthersDumping Area7.6432Dumping Area
Total 39.088
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANil0Nil
(2.)ESZsNil0Nil
(3.)Wildlife CorridorsNil0Nil
(4.)ESAsNil0Nil
(5.)Critically Polluted AreaNil0Nil
(6.)CorridorsNil0Nil
(7.)WLSGPV Wildlife Sanctuary National Park0.4nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Othersnilnil0nil
(2.)Archaeological SitesNil0Nil
(3.)Defence InstallationsNil0Nil
(4.)ForestGPV Wildlife Sanctuary National Park0.4nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Forest Clearance Under Process(Stage-I)
(i)MoEFCC file number FP/UK/HYD/22889/2016
(ii)Area applied 24.317
Forests Clearance Application Pending with -1
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 14.771
(c)Status of Land acquisition if not acquired Under Process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 4
(b)No. of Households 216
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 216
(e)Funds Allocated for R&R(in Rs) 1369
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Capricornis (Serow) and Panthera pardus
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 235.65 lakhs
(iii)Period of Implementation 4 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Supin River
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Through construction of barrage
(ii)Details of Study Conducted As per EIA and EMP Report
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. 624/1/2019-04(08)/77/2005
(iii)Date of issue 03 Jun 2019
(iv)Recommendation Nil
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 0
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Total Area of Green Belt 30
(b)Percentage of Total Project Area 75.00
(c)No. of Plants to be Planted 30000
(d)Funds Allocated for Plantation 3000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialUpliftment of project affected persons, improvement in the quality of life in the project affected area and its surroundings.
(2.)FinancialAddition of 166.19 MU of energy in the northern grid.
(3.)EnvironmentalGeneration of clean electricity replacing the requirement of Thermal Power Plant.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Hydroelectric Project
2. Name of the River SUPIN
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? Yes
(a) Status of Cumulative Impact Assessment and Carrying Capacity Study of River Basin Not
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Run of River7.23330000
5.
Powerhouse Installed Capacity Yes
(a) Type of Powerhouse Underground
(b) Capacity (in megawatts) 44
(c) No. of Tunnels 1
(d) No. of Units 2
(e) Bank of River Left
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 166.19
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)90 %9013198400
(2.)50 %13743198300
(3.)75 %10796200900
(c) Machine Availability (in percent) 95
(d) Cost of Electricity Generation (in INR) 4771500000
(e) Internal Rate of Return (in percent) 14.45
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 358554
(c) Utilized for Construction (in cubic meter)107566
(d) No. of Muck Disposal sites6
(e) Total Muck Disposal Area (in hectare)7.6432
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 6
(c) Name of the umbrella Fish Species (Scientific Name)Schizothorax richardsonii, Schizothorax progestus
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Non-Lean Non-Monsoon6.4422
(2.)Monsoon11.7025
(3.)Lean3.1520
11. Free Flow Stretch (in km) 5
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) Yes
(a) Quantity of the material (in cubic meter). 2300
(b) Length of the dam (in meter) 29.21
(c) Decommissioning Plan Copy of Decommissioning Plan
15.
Details of Coffer Dam (Downstream) Yes
(a) Quantity of the material (in cubic meter). 1883
(b) Length of the dam (in meter) 38.15
(c) Decommissioning Plan Copy of Decommissioning Plan
Additional Detail Sought Additional Detail Sought, 3.
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0106
(ii)Name of the EIA Consultant WAPCOS Limited
(iii)Address 76C, Sector 18, Gurgaon, Haryana
(iv)Mobile No. 9811487830
(v)Landline No. 0124239739
(vi)Email Id environment@wapcos.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 01 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NA

Deferred

06 Aug 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDEVJANI PATRA
DesignationDGM
Name of Company (Applicant Name should not be given here)SJVN CORPORATE ENVIRONMENT
AddressSJVN Corporate Office, Shakti Sadan, Shanan, Shimla (HP)