1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed 1x660 MW Coal based Supercritical Sagardighi Thermal Power Phase-III Expansion Unit–5, Village Manigram, Chandpara, Kanchanpara, Harirampur, at District Murshidabad, West Bengal by M/s The We | (b)Name of the Company / Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED | (c)Registered Address | Bidyut Unnayan Bhaban, LA Block, 3/C Sector-III, Salt Lake City, Kolkata-98,,Kolkata,West Bengal-700098 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Indranil Dutta | (b)Designation (Owner/ Partner/ CEO) | Director(Projects) | (c)Address | Bidyut Unnayan Bhaban, LA Block, 3/C Sector-III, Salt Lake City, Kolkata-98,,,Kolkata,West Bengal-700098 | (d)Pin code | 700098 | (e)E-mail | bitubiswas@gmail.com | (f)STD Code. | 33(f)Telephone No. | 23393203 | (g)Fax No. | 23350424 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(d) Thermal Power Plants
| Minor Activity | 1(a) Mining of minerals
| (b)Category | A | (c)Proposal Number | IA/WB/THE/107519/2019 | (d)Master Proposal Number(Single Window) | SW/107512/2019 | (e)EAC concerned (for category A Projects only) | Thermal Projects | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 46 | (b)Pincode | 742237 | (c)Bounded Latitudes (North) | | From | | Degree | 24.355 | Minutes | | Second | | From | | Degree | 24.377 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 88.091 | Minutes | | Second | | From | | Degree | 88.117 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 78D/3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 34.35 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 10 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-13012/01/2019-IA.I(T) | (c)Date of Issue of TOR | 26 Mar 2019 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 11 Jun 2019 | (c)Date of Issue of EC | 24 Mar 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Sep 2016 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| SgTP Township | State : | West Bengal | District : | Murshidabad | Tehsil : | Sagardighi | Village : | SgTPP Township |
| 57 | Details discussed in the attached proceedings | Others | Add. District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 102-124/05/EPE | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 28 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Electricity | 1600 | 660 | 2260 | Mega Watt(MW) | | Others | Transmission Line | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Thermal Power Plant | 1600MW | 660MW | 2260MW | Expansion | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 10 Jun 2019 | (iv)Valid Upto | 29 Feb 2024 | (v)File No. | 182/ML-Co-S/12/0116 | (vi)Application No. | C0090063 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 4402 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 180 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 11 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 3 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 392840000 | (c)Total quantity of raw material/fuel | 392840000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coal | 3390000 | Tons per Annum | | Pachwara North | Road,Rail | | 160 | Captive | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jan 2019 To 31 Mar 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 37.49 | 21.64 | 37.49 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 18.75 | 10.75 | 18.75 | 80 | (3.) | Others | O3 | Micro Gram per Meter Cube | 35.47 | 32.98 | 35.47 | 100 | (4.) | PM10 | | Micro Gram per Meter Cube | 87.48 | 55.39 | 87.48 | 100 | (5.) | NOx | | Micro Gram per Meter Cube | 36.58 | 26.37 | 36.58 | 80 | |
14.2. No. of Ground Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | - | 7.71 | 7.28 | 8.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 265.1 | 220.9 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 27.8 | 18 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.63 | 0.53 | 1 | 1.5 | (5.) | Others | Ca | | mg/l | | 68.3 | 47.2 | 75 | 200 | (6.) | Heavy Metals | | Fe | mg/l | | 0.23 | 0.18 | 0.3 | 0.3 | (7.) | TDS | | | mg/l | | 428 | 340 | 500 | 2000 | (8.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 8.04 | 6.57 | D | (2.) | BOD | | mg/l | | 10 | 6.1 | D | (3.) | DO | | mg/l | | 6.98 | 4.39 | D | (4.) | COD | | mg/l | | 71.6 | 38.1 | D | (5.) | Others | TSS | mg/l | | 48 | 28 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.62 | 41.84 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.2 | 46.1 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | us/cm | 640 | 74 | (2.) | pH | Parts per Million | | 7.89 | 6.75 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 18.61 | 5.08 | (4.) | K(Potassium) | Milligram per Kilogram | | 0 | 0 | (5.) | N(Nitrogen) | Milligram per Kilogram | | 252.76 | 152.9 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 21.26 To 60.96 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.56 To 27.42 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Bhagirathi River | 46509.4 | 5 | Copy of Permission Letter | Pipeline | | Intake Well | | 41/I-4M-26/06 | 10 Sep 2009 | 146794.53 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Diff. Sources | 23136 | 23136 | Chemical dossing, RO and Foculation | Reuse within the Plant & Recycling | | 23136 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 23136 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 23136 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Ash | Fly Ash | | 1088000 | Tons | 5 | Road | | Others | Cement Industry & Brick Manufacturer | (2.) | Ash | Bottom Ash | | 272000 | Tons | 1 | Others | Pipeline | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 69.89 | 2 | 18.31 | 88.201 | 100 | (2.) | NOx | | Microgram per Meter Cube | 29.08 | 2 | 103.64 | 132.7201 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 27.95 | 2 | 7.32 | 35.2701 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 12.58 | 80 | 123.34 | 135.9201 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Captive Coal | Coal | 150 | 7.18 | NOx | | 58.86 | (2.) | Captive Coal Mine | Coal | 150 | 7.18 | PM10 | | 17.66 | (3.) | Captive Coal | Coal | 150 | 7.18 | SO2 | | 58.86 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2500 | (b)Source | Station Transformer | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | No DG set | (e)Stack Height (in m) | 150 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 705.36 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 705.36 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 705.36 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : nil | 0 | Total (ha.) | 705.36 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 365 | | (2.) | Ash Pond | | 185 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not critically Polluted | 10 | 10km Area is not critically Polluted | (2.) | ESAs | No ESA | 10 | No ESA | (3.) | ESZs | No ESZ | 10 | No ESZ with 10KM | (4.) | WLS | No WLS | 10 | No WLS | (5.) | NPA | No NPA | 10 | No NPA | (6.) | Wildlife Corridors | No Wildlife Corridors | 10 | No Wildlife Corridors within 10KM | (7.) | Corridors | No corridor | 10 | No ones corridor | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | No archaeological site available | 10 | No archaeological site available with in 10KM | (2.) | Defence Installations | | No defence installation available with in 10KM | 10 | No defence installation available with in 10KM | (3.) | Forest | | No Forest | 10 | No forest with in 10KM | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 705.36 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 80 | (b)Permanent Employment-During Operation | 200 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 1350 | (f)Total Manpower | 400 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 110 | 10 | 120 | (2.) | Percentage of Total Project Area | 30.13 | 2.87 | 33 | (3.) | No. of Plants | 35410 | 10000 | 45410 | (4.) | Funds Allocated | 5000000 | 1000000 | 6000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | TOTAL FINANCIAL AND SOCIAL PICTURE WILL BE CHANGED BECAUSE RS. 4402 CR
PROJECT HUGE PERMANENT AND TEMPORARY EMPLOYMENT WILL BE CREATED | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Thermal Projects |
|
1. | Specifications of Plant: | (b) Technology Proposed | Supercritical | (b) Plant Load Factor(%) | 90 | (c) Station Heat Rate (Kcal/Kwh) | 2151 | (d) Steam Rate/Flow Rate | 1883 | (e) Boiler Temperature | 596 | (f) Boiler Pressure | 270 | (g) Type of Stack | Single flue | (h) No. of Stacks | 1 | |
|
S. No. | Stack ID | Stack Height (m) | Stack Diameter at exit (m) | Exit Velocity of Stack Gas (m/s) | Exit Temperature of Stack Gas (Degree Celsius) |
---|
(1.) | 3 | 150 | 7.18 | 22 | 140 | |
|
2. Details of Fuel Linkage |
---|
S. No. | Type of Fuel | Type of Linkage | Other Type of Linkage | Details | Characteristics |
---|
(1.) | Coal | Captive | | Source of Linkage : | Pachwara North | Quantity of Linkage Granted : | 3390000 | Date of Linkage : | 15 Apr 2015 | Duration of Linkage : | 29 |
| Gross Calorific Value (Kcal/Kg) : | 5492 | Ash Content (%) : | 19.97 | Sulphur Content (%) : | 0.5 | Moisture (%) : | 7.96 | Mercury (mg/kg) : | 0.3 | Fixed Carbon (%) : | 39.5 | Volatile Matter (%) : | 32.57 |
| |
|
3. Details of Transportation of Fuel |
---|
S. No. | Fuel | Rail | Road | Pipe Conveyor | Conveyor Belt | Arial Ropeway | Other Mode of Transportation | Total Distance | Total Quantity |
---|
(1.) | Coal | Distance : | 105 | Quantity : | 3390000 |
| | | | | | 160 | 3390000 | |
TOTAL | Distance : 105 Quantity : 3390000 | Distance : 55 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | |
|
4. | Details of Cooling System: | (a) Type of Cooling System | Water Cooled | (b) Type of Draft | Natural Draft | (c) Type of Air Circulation | Parallel Flow | (d) Cycle of Cooling (COC) | 5 | (e) Water Req. For Cooling (m3/day) | 80000 | (f) Boiler Blow Down Temperature | 0 | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1417/SA 0013 | (ii)Name of the EIA Consultant | Development Consultant Pvt. Ltd | (iii)Address | 24 Park Street, Kolkata – 700016 | (iv)Mobile No. | 9830558701 | (v)Landline No. | 0334012530 | (vi)Email Id | arindas@in.dclgroup.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Thermal Projects | (ix)Validity of Accreditation | 31 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Ref. Letter No. Nil dated 24.07.2019 | 06 Aug 2019 | 2. | ADS Raise Letter | Please upload the additional information as per the document enclosed | 24 Jul 2019 | 3. | ADS Reply Letter | Additional Documents | 19 Jul 2019 | 4. | NA | the reply provides only a letter from WBPCB. However, the reply to remaining points are not available. Please submit the requisite information for consideration. | 17 Jul 2019 | 5. | ADS Reply Letter | WBPCB Letter | 15 Jul 2019 | 6. | NA | Committee
after deliberations, deferred the project for want of information
| 11 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Indranil Dutta | Designation | Director(Projects) | Name of Company (Applicant Name should not be given here) | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED | Address | Bidyut Unnayan Bhaban, LA Block, 3/C Sector-III, Salt Lake City, Kolkata-98 |
|