Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Amtipani Chirodih Bauxite Mining Project (M L Area- 130.01 ha) with production capacity of 4.5 Lac TPA (ROM) near Villages: Amtipani Chirodih Bahagara, Taluka: Bishunpur, District: Gumla (Jharkhand).
(b)Name of the Company / Organisation M/S. MINERAL & MINERAL LTD
(c)Registered Address Court Road, Lohardaga, Jharkhand,Lohardaga,Jharkhand-835302
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Basudev Gangopadhyay
(b)Designation (Owner/ Partner/ CEO) Generalmanager
(c)Address M/s. Mineral Mineral Ltd, Court Road, PO Lohardaga, Jharkhand,,Lohardaga,Lohardaga,Jharkhand-835302
(d)Pin code 835302
(e)E-mail basudev1965@yahoo.co.in
(f)STD Code. 6526(f)Telephone No. 224118
(g)Fax No. 224118
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/JH/MIN/63495/2017
(d)Master Proposal Number(Single Window) SW/104279/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Map is enclosed with EIA/EMP Report
(b)Pincode 835302
(c)Bounded Latitudes (North) FROM 232010.801 To 232125.361
(d)Bounded Longitudes (East) FROM 841706 To 841741
(e)Survey of India Topo Sheet No. 73A3, 73A7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1065
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandGumlaBishunpurAmtipaniChirodihBahagar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/31/2017-IA-II(M)
(b)Date of Apply of TOR 27 Mar 2017
(c)Date of Issue of TOR / Standard ToR 07 Jun 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :8.6
Village Banari, Block Bishunpur, District: Gumla (Jharkhand)
State :Jharkhand
District :Gumla
Tehsil :Bishunpur
Village :Banari
254Educational facility, Health facility, drinking water facility, infrastructure facility, issue of transportation, electricity, dirct employment, women empowerment, use of reclaimed land,OthersDirector of DRDA
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Amtipani Chirodih Bauxite MineArea- 130.01 ha
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Mining lease area130.01HectaresOthers.
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 26.70
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.6675
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 361350
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 361350
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD361350OthersLiterOpen marketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 29 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube86.45685.792100
(2.)SO2Micro Gram per Meter Cube13.36.513.16480
(3.)PM2.5Micro Gram per Meter Cube44.526.744.14460
(4.)NOxMicro Gram per Meter Cube18.68.618.480
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA....
(2.)pHNA7.627.126.58.5
(3.)Fluoridemg/l0.150.081.01.5
(4.)Heavy Metals.NA....
(5.)Chloridesmg/l19.579.782501000
(6.)TDSmg/l130985002000
(7.)Total Hardnessmg/l88.4340.80200600
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l102.4020.40E
(2.)pHNA7.777.42E
(3.)BODmg/l29.706.0E
(4.)DOmg/l5.605.10D
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.842.5I-70-75,C-55-65,R-45-55, S-40-50
(2.)Leq(Night)A-weighted decibels(dB(A))44.139.2I-70-75, C-55-65, R-45-55, S-40-50
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.295.76
(2.)P(Phosphorus)Kilogram per hectare143.8184.76
(3.)K(Potassium)Kilogram per hectare264.03145.92
(4.)N(Nitrogen)Kilogram per hectare248.87148.04
(5.)Electric ConductivityMillisiemens per Centimetre0.210.13
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 02.28 To 11.87
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.10 To 6.25
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMine sump300 Not Appliacble PipelineOthersMine sumpNil07 Jun 201730
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Doemstic from mine office210Soak Pit Via septic tankOthersDisposed in soak pit via septic tank02
(2.)vehicular equipment maintenance220Oil Water separatorOthers.20
16.1.
(a)Total Waste Water Generation 4
(b)Total Discharged Water 2
(c)Total Reused Water 2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SoilOthersMine waste540876Tons0OthersHaul RoadOthersGreenbelt/Plantation
(2.)WasteOthersMine waste1183442Tons0OthersHaul RoadOthersBackfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube10.302.1012.580
(2.)PM2.5Microgram per Meter Cube39.400.7240.1360
(3.)PM10Microgram per Meter Cube70.201.8772.08100
(4.)NOxMicrogram per Meter Cube15.303.1918.5080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)....Others..
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 25 KVA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 123.59
(c)Government Land 6.42
(d)Revenue Land 0
(e)Other Land 0
    Total Land 130.01
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 123.59
(b)Waste/Barren Land 6.42
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : . 0
    Total 130.01
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area7777.0 (Backfilled 73.93 ha & water body 3.07 ha)
(2.)Green belt7.15
(3.)OthersRoad, builtup area & undisturbed area45.86Road, Builtup area & undisturbed area
Total 130.01
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0No CPA within 10 km of mine site
(2.)ESZsPalamau Wildlife sanctuary8.09.
(3.)CorridorsNone0No Corridors within 10 km of mine site
(4.)ESAsNone0No ESA within 10 km of mine site
(5.)NPANone0No NPA within 10 km of mine site
(6.)WLSPalamau Wildlife sanctuary8.09.
(7.)Wildlife CorridorsNone0No Wildlife corridors with in 10 km of mine site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest22 PF & 7 RF.Forest exist in study area (adjacent to 9.5 km)
(2.)Archaeological SitesNone0No
(3.)Defence InstallationsNone0No
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) .
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 123.59
(c)Status of Land acquisition if not acquired Mining lease is falling under CNT land, hence land
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 3
(b)No. of Households 871
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 265
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species As per Biological study report, there are 8 number of Schedule I species found within study area i.e. Wild Dog (Cuon alpines), Wolf (Canis lupus), Asian Elephant (Elephas maximus), Sloth Bear (Melurs
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 200 lakh
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 1015
(iii)Date of issue 11 Jun 2018
(iv)Recommendation None
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area North Koel River & 10 nalas
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 6.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 155
(e)No. of working days 295
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 7.15
(b)Percentage of Total Project Area 5.50
(c)No. of Plants to be Planted 17875
(d)Funds Allocated for Plantation 3575000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue generation will be due to the project
(2.)EnvironmentalGreenbelt/Plantation will be developed within the ML Area
(3.)SocialEmployement will be generated due to this project
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)BauxiteMajor
2.
Mine Capacity in ROM (Run of Mine) 4.5 Lakh TPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. RAN/GML/BX/MP-04/2017-18
(b)Date of Approval 26 May 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 130.01
(f)Approved Capacity 450000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 2.45
(b)Mineable Reserves (Million Ton) 1.93
(c)Extractable Reserves(Million Ton) 1.93
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral siutable for alumina refineries
(f)Stripping Ratio 1 : 3.26
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) None
(h)Average Gradient(Degree) None
(i)Mining Method Opencast
(j)Life of Mine (Years) 7
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 130.01
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 10 Jan 2017
(iii)Validity of LOI 50
(iv)Reference No. of LOI B.M-4-1047/94/59/M
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 130.01
(iii)Validity of the lease deed From : 11 Jan 2017 To : 10 Jan 2067
(iv)Date of Execution of Mining Lese 11 Jan 2017
(v)Reference Number JH04416033189259P
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof This is fresh Mine
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 1456204
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 1456204
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 77
(b)Depth (in meter) 10
(c)Volume (in Million Cubic meter) 7.70
12.
Details of Quarry:
(a)Final Void of 3.07 (hectare) at a Depth of 10 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 77
13.
Details of Transportation:
(a)In Pit/Underground to Surface By trucks with tarpaulin cover
(b)Surface to Siding/Loading By Rail from siding to the Plant
(c)Transportation / Conveyor Details By Road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND123.590123.590
(2.)FOREST LAND000.000
(3.)WASTE LAND6.4206.420
(4.)GRAZING LAND000.000
(5.)SURFACE WATER BODIES000.000
(6.)SETTLEMENTS000.000
TOTAL130.010130.01
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT7.15007.150
(2.)EXTERNAL OB DUMPS0000.000
(3.)TOP SOIL STORAGE0000.000
(4.)ROADS002.682.680
(5.)BUILT UP AREA (COLONY/OFFICE)000.500.500
(6.)EXCAVATION/QUARRY03.0773.9377.000
(7.)VIRGIN AREA0042.6842.680
(8.)INTERNAL OB DUMPS0000.000
TOTAL7.153.07119.790130.01
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 77
(d)Safety Zone(in hectare) 7.15
(e)Final Void of 3.07 (hectare) at a Depth of 10 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 2.68
(h)Total afforestation plant (in hectare) 7.15
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)......
Additional Detail Sought Additional Detail Sought, 3.
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt Ltd
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram Haryana-122001
(iv)Mobile No. 9509267011
(v)Landline No. 0124414192
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NA

Based on the presentation made by PP and the discussion held, the Committee observed the following and deferred the proposal and asked the PP to submit following information for further consideration.

(i).

Print