Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Production Expansion of Limestone Mine from (9.10 MTPA To 14.10 MTPA) at Villages- Bhatkotari, Lasravan, Phalwa and Rasulpura, Taluka- Nimbahera, District-Chittorgarh, Rajasthan
(b)Name of the Company / Organisation WONDER CEMENT LIMITED
(c)Registered Address Wonder Cement Ltd., R.K. Nagar, Nimbahera, Chittorgarh (Rajasthan),chittorgarh,Rajasthan-312601
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shashi Mohan Joshi
(b)Designation (Owner/ Partner/ CEO) President (Works)
(c)Address Wonder Cement Ltd., R.K. Nagar,,Nimbahera,chittorgarh,Rajasthan-312601
(d)Pin code 312601
(e)E-mail sm.joshi@wondercement.com
(f)STD Code. 1477(f)Telephone No. 307105
(g)Fax No. 307333
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/RJ/MIN/8511/2012
(d)Master Proposal Number(Single Window) SW/102675/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. ML.no. 22/2007
(b)Pincode 312601
(c)Bounded Latitudes (North) FROM 243914.4 To 244027.67
(d)Bounded Longitudes (East) FROM 743513.51 To 743746.16
(e)Survey of India Topo Sheet No. 45L/10, 45L/6, 45L/9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 454
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanchittorgarhNimbaheraBhatkotari, Lasravan, Phalwa and Rasulpura
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/319/2012.IA.II(M)
(b)Date of Apply of EC 19 Jul 2013
(c)Date of Issue of EC 19 Dec 2013
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :11 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
public place at near Surpur Balaji Temple, Vill-Rasulpura, Tehsil-Nimbahara
State :Rajasthan
District :chittorgarh
Tehsil :Nimbahera
Village :Rasulpura
100Employment for local and CSR activitiesOthersAdditional District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/Mines/517/872/2014/607
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Limestone Mine9.105.014.1OthersMillion TPARoad,Conveyor Belt
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Crusher2 x 1400 TPH1 x 1400 TPH3 x 1400 TPH
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 27 Apr 2017
(iv)Valid Upto 30 Apr 2022
(v)File No. F(Mines)/Chittorgarh(Nimbahera)/1867(1)/2017-2018/
(vi)Application No. Order.no. 2017-2018/Mines/9241
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 30
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.3
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6
(b)Existing quantity of raw material/fuel 12
(c)Total quantity of raw material/fuel 18
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD18Kilo Litre per DaylocalRoad180 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube39.210.734.660
(2.)SO2Micro Gram per Meter Cube21.38.020.880
(3.)NOxMicro Gram per Meter Cube32.711.229.980
(4.)PM10Micro Gram per Meter Cube74.732.269.8100
    14.2.     No. of Ground Water monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l2408.3533.95002000
(2.)Total Hardnessmg/l1080335200600
(3.)Fluoridemg/l1.10.41.01.5
(4.)pHNA8.06.756.58.5
(5.)Chloridesmg/l889.642.542501000
(6.)Heavy MetalsZincmg/l3.40.01515
(7.)TSSmg/l1100
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.517.47D
(2.)DOmg/l5.85.5D
(3.)BODmg/l33D
(4.)CODmg/l55D
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.745.675
(2.)Leq(Night)A-weighted decibels(dB(A))56.742.270
    14.5.     No. of Soil Sample Monitored locations : 15
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare698.29266.57
(2.)Electric ConductivityMillisiemens per Centimetre408116.9
(3.)N(Nitrogen)Kilogram per hectare222.4115.3
(4.)P(Phosphorus)Kilogram per hectare531.1492.8
(5.)pH8.196.95
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 36.4 To 44.1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.4 To 8.7
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA-21-4(212)/WR/CGWA/2007-1570
(f)Date of Issue 09 Oct 2015
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater300.1Copy of Permission LetterPipelineTube WellRef: no. 21-4(212)/WR/CGWA/2007-157009 Oct 20152470
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)vehicle cleaning3340Oil Water SeparatorsReuse within the Plant & Recycling33
16.1.
(a)Total Waste Water Generation 33
(b)Total Discharged Water 0
(c)Total Reused Water 33
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Kilolitre1.5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube21.30.7021.3180
(2.)NOxMicrogram per Meter Cube32.70.7032.7180
(3.)PM2.5Microgram per Meter Cube39.20.7039.2160
(4.)PM10Microgram per Meter Cube74.70.72.0476.741100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CrusherElectricity311.5OthersPM4.71 Kg/Hr
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1750
(b)Source Captive Power Plant at WLC Cement Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 672.354
(c)Government Land 28.476
(d)Revenue Land 0
(e)Other Land 40.100
    Total Land 740.93
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 26620
(b)Waste/Barren Land 5852
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 2222
(e)Settlements 1980
(f)Industrial 1761
(g)Forest 3872
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Mining Area 1672
    Total 43979
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area170.50
(2.)OB Dump Area32.79
(3.)Green belt35.9
(4.)Built Up Area7.2Infrastructure( office,workshop,others), roads
(5.)Main Plant7.70Crusher Plant
(6.)OthersIncluding remaining land486.84stacks, stock and remaining land
Total 740.93
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANil0Nil
(2.)ESZsNil0Nil
(3.)Wildlife CorridorsNil0Nil
(4.)Critically Polluted AreaNil0Nil
(5.)WLSNil0Nil
(6.)ESAsNil0Nil
(7.)CorridorsNil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKotmanga PF & Kannauj- Banasana RF3.3WSW & WNW
(2.)Defence InstallationsNil0Nil
(3.)Archaeological SitesNil0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 457.29
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species peacock, Leopard and Indian wolf
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 140
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. CWW letter 5521
(iii)Date of issue 06 Sep 2013
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Mulira Dam
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 3.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 48
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 306
(f)Total Manpower 48
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt30.9535.9
(2.)No. of Plants547461250067246
(3.)Funds Allocated21900000200000023900000
(4.)Percentage of Total Project Area25.544.1329.669999999999998
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will provide direct employment to a large number of personnel. This project will also generate indirect employment to a considerable number of families, who will render their services for the employees of the project. The project will also encourage ancillary industries in the region, which will not only increase the employment potential but also the economic base of the region will be further strengthened.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
2.
Mine Capacity in ROM (Run of Mine) 14.53 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 584(4)(3)(1764)/2018
(b)Date of Approval 19 Dec 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 740.93
(f)Approved Capacity 14.1
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 510.29
(b)Mineable Reserves (Million Ton) 436.73
(c)Extractable Reserves(Million Ton) 436.73
(d)Percent(%) of Extraction 0
(e)Grade of Coal /Ore /Mineral Cement Grade Limestone
(f)Stripping Ratio 1 : 0.05
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 29
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)21400 2M
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 740.93
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 23 Aug 2008
(iii)Validity of LOI 2058
(iv)Reference No. of LOI Govt.order.no.F5(76)Khan/Gr.2/07
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 740.93
(iii)Validity of the lease deed From : 08 Sep 2008 To : 08 Sep 2058
(iv)Date of Execution of Mining Lese 08 Sep 2008
(v)Reference Number Govt.order.no.F5(76)Khan/Gr.2/07
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Still in validity period
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 2
(ii)Total Area (in Hectare) 8
(iii)Height (in meter) 30
(iv)Quantity (in Million Cubic meter) 463056
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 337.65
(b)Depth (in meter) 120
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 170.50 (hectare) at a Depth of 320 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 170.50
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumper
(b)Surface to Siding/Loading not applicable
(c)Transportation / Conveyor Details Dumpers and Belt Conveyors are used for transport
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)GRAZING LAND40.1040.100
(2.)SURFACE WATER BODIES000.000
(3.)SETTLEMENTS000.000
(4.)OTHERS(Specify)Private & Government land700.830700.830
(5.)WASTE LAND000.000
(6.)AGRICULTURE LAND000.000
(7.)FOREST LAND000.000
TOTAL740.930740.93
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000.000
(2.)VIRGIN AREA00272.28272.280
(3.)ROADS001010.000
(4.)BUILT UP AREA (COLONY/OFFICE)0000.000
(5.)GREEN BELT43.220043.220
(6.)EXCAVATION/QUARRY54337.650391.650
(7.)INTERNAL OB DUMPS23.780023.780
(8.)EXTERNAL OB DUMPS0000.000
TOTAL121337.65282.280740.93
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 337.65
(d)Safety Zone(in hectare) 0
(e)Final Void of 337.65 (hectare) at a Depth of 120 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 121
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan 0
Total Area Excavated (in hectare) 337.65
Total Area Backfilled after Excavation (in hectare) 23.78
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20133.753.753.7522963170
(2.)20143.753.753.7533598200
(3.)20123.753.753.75475850
(4.)20159.109.109.1033797750
(5.)20169.109.109.1041634220
(6.)20179.109.109.1048194730
(7.)20189.109.109.1066617250
Additional Detail Sought:   NIL ,w ,3.NIL
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/19/0957 dated April 16, 2019
(ii)Name of the EIA Consultant Vimta Labs Limited
(iii)Address 142, IDA Phase-2, Cherlapally, Hyderabad -500051
(iv)Mobile No. 9000711309
(v)Landline No. 0402726414
(vi)Email Id env@vimta.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 19 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShashi Mohan Joshi
DesignationPresident (Works)
Name of Company (Applicant Name should not be given here)WONDER CEMENT LIMITED
AddressWonder Cement Ltd., R.K. Nagar, Nimbahera, Chittorgarh (Rajasthan)
Print