Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Warehouse Project at at Yelumala, Distt.- Sangareddy, Telangana by M/s All Cargo Logistics Ltd
(b)Name of the Company / Organisation ALL CARGO LOGISTICS PVT LTD
(c)Registered Address Ashoka My Home Chambers, 2nd Floor, Flat No. - 201,,Sangareddy,Telangana-500003
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bhupendra Kaushik
(b)Designation (Owner/ Partner/ CEO) Manager
(c)Address Ashoka My Home Chambers, 2nd Floor, Flat No.- 201,,S.P. Road, Secunderabad,Patancheru,Sangareddy,Telangana-500003
(d)Pin code 500003
(e)E-mail allcargologistics2019@gmail.com
(f)STD Code. 9140(f)Telephone No. 40035961
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/TG/MIS/101910/2019
(d)Master Proposal Number(Single Window) SW/101905/2019
(e)EAC concerned (for category A Projects only) Infrastructure and Miscellaneous Projects  +  CRZ
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. at Yelumala, Distt.- Sangareddy, Telangana
(b)Pincode 502300
(c)Bounded Latitudes (North) FROM 17.458841 To 17.467574
(d)Bounded Longitudes (East) FROM 78.219208 To 78.223252
(e)Survey of India Topo Sheet No. 56K3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 569
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 522
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaSangareddyPatancheruYelumala
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Its a construction project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)NA0Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 110
(b) Funds Allocated for Environment Management (Capital) (in Crores) 25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 12
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 12
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Bitumen12Tons per AnnummarketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 Mar 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube9.89.89.780
(2.)NOxMicro Gram per Meter Cube46.646.646.580
(3.)PM10Micro Gram per Meter Cube96.396.396.2100
(4.)PM2.5Micro Gram per Meter Cube48.348.348.260
(5.)OthersCOMicro Gram per Meter Cube810810805.84000
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.47.47.58.5
(2.)Total Hardnessmg/l459459200600
(3.)Heavy MetalsHGmg/l0000
(4.)TSSmg/l00000000
(5.)TDSmg/l113011305002000
(6.)Chloridesmg/l3103102501000
(7.)Fluoridemg/l.6.611.5
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l00A
(2.)BODmg/l00A
(3.)DOmg/l00A
(4.)CODmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.563.565
(2.)Leq(Night)A-weighted decibels(dB(A))48.748.755
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Millisiemens per Centimetre00
(2.)P(Phosphorus)Percent00
(3.)Electric Conductivity456456
(4.)pH7.97.9
(5.)K(Potassium)Milliequivalents per 100 Gram8787
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.40 To 33.50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.20 To 28.32
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater15400Copy of Permission LetterPipelineTube Well0001 Apr 2019154
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste71100STPReuse within the Plant & Recycling71
16.1.
(a)Total Waste Water Generation 71
(b)Total Discharged Water 0
(c)Total Reused Water 71
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Munipal Solid WasteMunicipal Solid Waste0.695Tons00RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube96.5000.298.7100
(2.)NOxMicrogram per Meter Cube46.6000.248.680
(3.)SO2Microgram per Meter Cube9.8000.211.580
(4.)PM2.5Microgram per Meter Cube48.3000.249.760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DGLSD1800NOx00
(2.)DGLSD1800PM1000
(3.)DGLSD1800SO200
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 750
(b)Source Southern Power Distribution Company of Telangana L
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 400 kva
(e)Stack Height (in m) 18
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 00
(c)Government Land 00
(d)Revenue Land 00
(e)Other Land 12
    Total Land 12
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 00
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 00
(e)Settlements 00
(f)Industrial 00
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : TOTAL PROJECT AREA 12
    Total 12
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt2.4
(2.)Built Up Area5.57
Total 7.97
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0000
(2.)WLSNA0000
(3.)NPANA0000
(4.)ESAsNA0000
(5.)Wildlife CorridorsNA0000
(6.)CorridorsNA0000
(7.)ESZsNA0000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestMedaplli Reserve Forest9.75RF
(2.)Archaeological SitesNA0000
(3.)Defence InstallationsNA0000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 12
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 40
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 40
(d)Temporary Employment- During Operation 2400
(e)No. of working days 365
(f)Total Manpower 2580
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.4
(b)Percentage of Total Project Area 20.00
(c)No. of Plants to be Planted 1550
(d)Funds Allocated for Plantation 1500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialBetter Infrastructure & Employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Infrastructure and Miscellaneous Projects  +  CRZ
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 12
(b)Total No. of Flats to be Build 4
(c)No. of Buildings 4
(d)Total plot area (sqm) 120000
(e)Total built up area (sqm) 55775.83
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 29
(b)Capacity 42.39
(c)No. of Recharge Pits 29
(d)Capacity 42.39
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 12270.68 m2
5.
Energy Saving Measures:
(a)Source/Mode LED
(b)Percentage 1
(c)Quantity 7.5
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
Additional Detail Sought:   NIL ,w ,3.NIL
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0064
(ii)Name of the EIA Consultant GRC INDIA PVT LTD
(iii)Address F 375 SECTOR-63 NOIDA
(iv)Mobile No. 8377904041
(v)Landline No. 0120404463
(vi)Email Id eia@grc-india.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Infrastructure and Miscellaneous Projects  +  CRZ
(ix)Validity of Accreditation 04 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhupendra Kaushik