1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) LPG BOTTLING PLANT AT RASAYANI WITH LPG RECEIPT BY PIPELINE/TANK LORRIES
(b)Name of the Company / Organisation BHARAT PETROLEUM CORPORATION LIMITED RASAYANI
(c)Registered Address Bharat Bhavan 1, 3rd Floor 4&6 Currimbhoy Road Ballard Estate, Mumbai,Mumbai City,Maharashtra-400001
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kalyan Mukherjee
(b)Designation (Owner/ Partner/ CEO) HeadInfraTaskForceWest
(c)Address Bharat Bhavan , 4 and 6 Currimbhoy Road, Ballard Estate, Mumbai,,Mumbai,Mumbai City,Maharashtra-400001
(d)Pin code 400001
(e)E-mail abhisheksingh@bharatpetroleum.in
(f)STD Code. 22(f)Telephone No. 22713374
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
(b)Category A
(c)Proposal Number IA/MH/IND2/73343/2018
(d)Master Proposal Number(Single Window) SW/99114/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey no. 13(part) 14, 15, 16, 19, 20(part), 21(p
(b)Pincode 410207
(c)Bounded Latitudes (North) FROM 185323.01 To 185334.30
(d)Bounded Longitudes (East) FROM 731013.15 To 73109.84
(e)Survey of India Topo Sheet No. 47F/1 47 F/5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 97
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraRaigadKhalapurParade
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/202/2018-IA-II(I)
(b)Date of Apply of TOR 20 Jul 2018
(c)Date of Issue of TOR / Standard ToR 20 Aug 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :0.6
Rasrang hall HOC colony Rasayani
State :Maharashtra
District :Raigad
Tehsil :Khalapur
Village :Parade
250Major issues raised during public hearing like employment generation and lpg gas supply as well as environment impact from the proposed project activityDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)LPG bottling plant at Rasayani61506150
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)16150OthersMetric TonsOthersPipeline/Tank lorries
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 315
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.00
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.34
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)LPG00Tons per AnnumNANAOthersNA00 Open MarketNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube29252980
(2.)PM2.5Micro Gram per Meter Cube46254660
(3.)PM10Micro Gram per Meter Cube795379100
(4.)SO2Micro Gram per Meter Cube19121980
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersNA8.26.68.08.0
(2.)Total Hardnessmg/l5010200600
(3.)TDSmg/l6121405002000
(4.)Heavy MetalsLeadmg/l00000.010.01
(5.)TSSmg/l00000000
(6.)Chloridesmg/l110192501000
(7.)Fluoridemg/l0.60.5311.5
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.27A
(2.)BODmg/l0000B
(3.)CODmg/l2412B
(4.)DOmg/l6.11B
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))46.742.870
(2.)Leq(Day)A-weighted decibels(dB(A))54.850.175
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare322197
(2.)P(Phosphorus)Kilogram per hectare17013
(3.)K(Potassium)Kilogram per hectare1418
(4.)Electric ConductivityMillisiemens per Centimetre1.0020.151
(5.)pH7.46.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.93 To 3.93
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.77 To 2.77
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC5500Copy of Permission LetterPipelineOtherswater requirement shall be met by MIDC000002 Mar 201955
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic17.520.5STPReuse within the Plant & Recycling,Green Belt Renewal Plant17.5
(2.)Cylinder washing58ETPReuse within the Plant & Recycling,Green Belt Renewal Plant5
16.1.
(a)Total Waste Water Generation 22.5
(b)Total Discharged Water 0
(c)Total Reused Water 22.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Kilolitre1RoadAuthorized Recyclers
(2.)damaged cylindersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons1RoadOtherswill be sold as scrap metals
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube48490.344960
(2.)NOxMicrogram per Meter Cube0001280
(3.)SO2Microgram per Meter Cube19200.252080
(4.)PM10Microgram per Meter Cube85860.586100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set 250 KVAHSD40.1SO2250
(2.)DG set 750 KVAHSD60.2SO2250
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1500
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 DG of 750 KVA and 7 DG of 250 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 00
(c)Government Land 00
(d)Revenue Land 00
(e)Other Land 19.55
    Total Land 19.55
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 00
(i)Marine Area 0
(j)Others : project area 19.55
    Total 19.55
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Othersnot applicable00The proposed project is for LPG bottling plant
Total 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsKarnala Bird Sanctuary2.52.5 km from the project site
(2.)Critically Polluted AreaNA00NA
(3.)WLSNA00NA
(4.)NPANA00NA
(5.)ESAsNA00NA
(6.)Wildlife CorridorsNA00NA
(7.)CorridorsNA00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserved Forests near Kaire1.2South
(2.)Archaeological SitesManikgad Fort7.5South
(3.)Defence InstallationsNone00NA
(4.)OthersWater BodyPatalganga River1.0Abbutting
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Selec
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 19.55
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Patal Ganga River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 00
(e)No. of working days 30
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 6.46
(b)Percentage of Total Project Area 33.04
(c)No. of Plants to be Planted 1000
(d)Funds Allocated for Plantation 1200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalSince the project involves receipt, storage, dispatch of LPG no manufacturing process is involved hence no adverse environmental impacts are envisaged
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
Additional Detail Sought:   NIL ,w ,3.NIL
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0094
(ii)Name of the EIA Consultant ULTRA-TECH Environmental Consultancy and Laborator
(iii)Address Unit Nos. 224, 225 & 226 Jai Commercial Complex, Eastern Express Highway, Opp. Cadbury Factory, Khopat, Thane 400 601, Maharashtra, India
(iv)Mobile No. 9820620617
(v)Landline No. 0222534277
(vi)Email Id shekhartamhane@ultratech.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKalyan Mukherjee
DesignationHeadInfraTaskForceWest
Name of Company (Applicant Name should not be given here)BHARAT PETROLEUM CORPORATION LIMITED RASAYANI
AddressBharat Bhavan 1, 3rd Floor 4&6 Currimbhoy Road Ballard Estate, Mumbai
Print