Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Common Effluent Treatment Plant (CETP) proposed by M/s. Enviro Technology Limited
(b)Name of the Company / Organisation M/S. ENVIRO TECHNOLOGY LIMITED
(c)Registered Address Plot No 2413/14,Notified GIDC Estate, Ankleshwar, Distt: Bharuch-393002(GUJ),Bharuch,Gujarat-393002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant BD Dalwadi
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address Plot No 2413/14, Notified GIDC Estate, Anklehwar, Distt Bharuch,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail darjiam@beil.co.in
(f)STD Code. 2646(f)Telephone No. 25135
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity7(h) Common Effluent Treatment Plants (CETPs)
(b)Category A
(c)Proposal Number IA/GJ/MIS/84597/2018
(d)Master Proposal Number(Single Window) SW/96471/2019
(e)EAC concerned (for category A Projects only) Infrastructure and Miscellaneous Projects  +  CRZ
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 2413 and 2413
(b)Pincode 393002
(c)Bounded Latitudes (North) FROM 21.61954 To 21.62014
(d)Bounded Longitudes (East) FROM 73.02458 To 73.02778
(e)Survey of India Topo Sheet No. 46C14,46G2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 295
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7.2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvarGIDC Ankleshwar
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of EC NIL
(c)Date of Issue of EC NIL
(d)Previous EC Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason GIDC, Ankleshwar, Notified industrial area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-283/2009(ENV)/161 dated 7-3-2019
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)sewage170017003400Cubic Meter per DayRoad
(2.)Industrial Waste water180035005300Cubic Meter per DayRoad
(3.)Raw water7254651190Cubic Meter per DayPipe Conveyor
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Equalization tank for Low Ammonia stream-1,232m x 15.25m x 2.5m ht + 0.5m FB21m x 17m x 5m ht + 0.5FBModifiedModified
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 19 Jul 2018
(iv)Valid Upto 18 Mar 2024
(v)File No. GPCB/ANK-CCA-128()13)/ID-15074/462327
(vi)Application No. CCA NO: AWH-93835
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 19.35
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.11
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.19
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.03
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5548
(b)Existing quantity of raw material/fuel 3500
(c)Total quantity of raw material/fuel 9048
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)EFFLUENT5548Cubic Meter per DayMember IndustriesRoad10 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Dec 2018 To 15 Jan 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube85.4545.1378.7100
(2.)SO2Micro Gram per Meter Cube20.671.139.1280
(3.)NOxMicro Gram per Meter Cube9.945.636.880
(4.)PM2.5Micro Gram per Meter Cube30.6411.6224.9760
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.367.116.58.5
(2.)TDSmg/l402315315002000
(3.)Fluoridemg/l0.170.11.01.5
(4.)Chloridesmg/l13204342501000
(5.)Heavy MetalsZincmg/l0.070.018550
(6.)TSSmg/l0000
(7.)Total Hardnessmg/l1168196200600
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.56.8B
(2.)CODmg/l25.28.5B
(3.)pHNA8.438.21B
(4.)BODmg/l7.22.8B
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))615175
(2.)Leq(Night)A-weighted decibels(dB(A))574770
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare275227
(2.)P(Phosphorus)Kilogram per hectare44.527.4
(3.)K(Potassium)Kilogram per hectare428.5372.2
(4.)pH8.437.79
(5.)Electric ConductivityOthersmicrosiemens/ cm734.6102.9
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC water supply4652Copy of Permission LetterPipelineOthersPipelineGIDC/RM/ALT/ANK/224715 Jun 2016650
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industries55483500CETPOthersPipe005548
16.1.
(a)Total Waste Water Generation 5548
(b)Total Discharged Water 5548
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)CETP Sludge WasteIndustrial Waste36000Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube852086100
(2.)SO2Microgram per Meter Cube20.60222380
(3.)NOxMicrogram per Meter Cube21.50222480
(4.)PM2.5Microgram per Meter Cube30213260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)nana00Othersna1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 600
(b)Source DGVCL (Dakshin Gujarat Vij Company Ltd.)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 1010
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 26.543
(d)Revenue Land 0
(e)Other Land 0
    Total Land 26.543
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 16052
(b)Waste/Barren Land 2496
(c)Grazing/ Community Land 3543
(d)Surface Water Bodies 1552
(e)Settlements 5242
(f)Industrial 2530
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant26.543
Total 26.543
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)ESAsNA0NA
(3.)ESZsNA0NA
(4.)Critically Polluted AreaAnkleshwar0unit is located within CPA
(5.)Wildlife CorridorsNA0NA
(6.)NPANA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 26.543
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 7.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 112
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 5
(e)No. of working days 361
(f)Total Manpower 137
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt00.79600.796
(2.)Percentage of Total Project Area029.9929.99
(3.)No. of Plants012001200
(4.)Funds Allocated07200072000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalEnvironmental Protection
(2.)SocialEmployment Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Infrastructure and Miscellaneous Projects  +  CRZ
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 663 m2
5.
Energy Saving Measures:
(a)Source/Mode 0
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
Additional Detail Sought:   NIL ,w ,3.NIL
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0040
(ii)Name of the EIA Consultant SHIVALIK SOLID WASTE MANAGEMENT LIMITED
(iii)Address SCO-20-21, Dhakoli, Baltana, Kalka Shimla Highway, Near Hotel Dolphin,
(iv)Mobile No. 8288079363
(v)Landline No. 0176250949
(vi)Email Id s.brahma@beil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Infrastructure and Miscellaneous Projects  +  CRZ
(ix)Validity of Accreditation 16 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBD Dalwadi
DesignationCEO
Name of Company (Applicant Name should not be given here)M/S. ENVIRO TECHNOLOGY LIMITED
AddressPlot No 2413/14,Notified GIDC Estate, Ankleshwar, Distt: Bharuch-393002(GUJ)