Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Installation of Petro Resid Fluidized Catalytic Cracking Unit (PRFCC) and Associated Facilities at BPCL Mumbai Refinery
(b)Name of the Company / Organisation BHARAT PETROLEUM CORPORATION LIMITED
(c)Registered Address BPCL Mumbai Refinery, Mahul, Chembur,Mumbai (Suburban),Maharashtra-400074
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant V D Patre
(b)Designation (Owner/ Partner/ CEO) Senior Manager
(c)Address BPCL Mumbai Refinery, Technology Department, First floor, South Block.,Mahul, Chembur, Mumbai,Kurla,Mumbai (Suburban),Maharashtra-400074
(d)Pin code 400074
(e)E-mail patrevd@bharatpetroleum.in
(f)STD Code. 22(f)Telephone No. 25533197
(g)Fax No. 25542970
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity4(a) Petroleum refining industry
(b)Category A
(c)Proposal Number IA/MH/IND2/96004/2018
(d)Master Proposal Number(Single Window) SW/96000/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Modernization
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 234/482
(b)Pincode 400074
(c)Bounded Latitudes (North) FROM 190138.1 To 190138.9
(d)Bounded Longitudes (East) FROM 725324.3 To 725348.0
(e)Survey of India Topo Sheet No. 47B13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraMumbai (Suburban)KurlaMahul
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of EC NIL
(c)Date of Issue of EC NIL
(d)Previous EC Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason No pollution load is envisaged due to the proposed
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-870/RON/2018-NGP/4792
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)0033Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Mumbai RefineryRefineryPRFCCRefinery with PRFCC Unit
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Jun 2017
(iv)Valid Upto 31 Aug 2021
(v)File No. Format 1.0/BO/CAC-Cell/UAN No 0000021287/1st CAC/1
(vi)Application No. 0000021287
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6877
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.65
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 19.46
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.9
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Vaccum residue3Tons per AnnumrefineryOtherspipeline0.2 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 04 Mar 2016 To 02 Jun 2016
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube29.114.327.760
(2.)NOxMicro Gram per Meter Cube26.614.726.580
(3.)PM10Micro Gram per Meter Cube78.156.377.8100
(4.)SO2Micro Gram per Meter Cube10.95.810.880
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.816.7377
(2.)TDSmg/l476475002000
(3.)Chloridesmg/l76.212.52501000
(4.)Fluoridemg/l0.640.231.01.5
(5.)Heavy MetalsMercurymg/l0.0010.00010.0010.001
(6.)TSSmg/l1351520
(7.)Total Hardnessmg/l221.530.2300600
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l143.8E
(2.)BODmg/l2984E
(3.)CODmg/l66810E
(4.)pHNA7.926.45E
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))73.867.575
(2.)Leq(Night)A-weighted decibels(dB(A))67.860.370
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH9.526.39
(2.)K(Potassium)Milligram per Kilogram2251.6344.3
(3.)Electric ConductivityOthersmhos/cm09860.186
(4.)P(Phosphorus)Milligram per Kilogram7.65.3
(5.)N(Nitrogen)Milligram per Kilogram607.3139.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.77 To 6.42
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.80 To 7.10
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface43440.5Copy of Permission LetterPipelineBarrageAE/E/243/MW/IR05 Jul 201216500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process32645760ETPReuse within the Plant & Recycling3264
16.1.
(a)Total Waste Water Generation 3264
(b)Total Discharged Water 0
(c)Total Reused Water 3264
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)PRFCC CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.8Tons1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube10.850.57.3518.380
(2.)PM10Microgram per Meter Cube78.10.5078.2100
(3.)PM2.5Microgram per Meter Cube29.10.5029.260
(4.)NOxMicrogram per Meter Cube26.550.512.939.4680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)PRFCCVR903.2SO21
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50000
(b)Source Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 183.7
(d)Revenue Land 0
(e)Other Land 0
    Total Land 183.7
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 183.7
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : No 0
    Total 183.7
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant183.7
Total 183.7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNo0NO WLS
(2.)Critically Polluted AreaNo0NP CPA
(3.)CorridorsNo0No Corridors
(4.)ESZsNo0No ESZs
(5.)ESAsNo0No ESAs
(6.)NPANo0No NPA
(7.)Wildlife CorridorsNo0No Wildlife Corridors
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNo0No Forest
(2.)Defence InstallationsNo0No Defence Installation
(3.)Archaeological SitesNo0No Archaeological sites
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 183.7
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt202
(2.)Percentage of Total Project Area101
(3.)No. of Plants340003400
(4.)Funds Allocated516
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalDecrease the pollution load
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
Additional Detail Sought:   NIL ,w ,3.NIL
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0041
(ii)Name of the EIA Consultant Engineers India Limited
(iii)Address EWS DIVISION, TOWER-1, GF, EIL OFFICE COMPLEX, GURUGRAM
(iv)Mobile No. 9818688520
(v)Landline No. 1243802034
(vi)Email Id rb.bhutda@eil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 15 Sep 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantV D Patre
DesignationSenior Manager
Name of Company (Applicant Name should not be given here)BHARAT PETROLEUM CORPORATION LIMITED
AddressBPCL Mumbai Refinery, Mahul, Chembur
Print