Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed expansion of Odisha Waste Management Project (Division of Ramky Enviro Engineers Ltd) at Plot No. 420 / 648 / 1 under Khata no. 61, Village - Kanchichuan, Tehsil - Sukinda, District - Jajpur,
(b)Name of the Company / Organisation RAMKY ENVIRO ENGINEERS LTD
(c)Registered Address Ramky Enviro Engineers Limited 13th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad,Rangareddi,Telangana-500032
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjiv Kumar
(b)Designation (Owner/ Partner/ CEO) IWMHead
(c)Address Ramky Enviro Engineers Limited 13 th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad,,Serilingampalle,Rangareddi,Telangana-500032
(d)Pin code 500032
(e)E-mail consultancygroup@ramky.com
(f)STD Code. 40(f)Telephone No. 23015000
(g)Fax No. 04023015000
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
(b)Category A
(c)Proposal Number IA/OR/MIS/90750/2008
(d)Master Proposal Number(Single Window) SW/90746/2019
(e)EAC concerned (for category A Projects only) Infrastructure and Miscellaneous Projects  +  CRZ
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. No 420/648/1 under Khata no. 61
(b)Pincode 755018
(c)Bounded Latitudes (North) FROM 20.946 To 20.956
(d)Bounded Longitudes (East) FROM 85.891 To 85.894
(e)Survey of India Topo Sheet No. F45N16, F45T13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 74
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 12
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaJajpurSukindakanchichuan
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of EC NIL
(c)Date of Issue of EC NIL
(d)Previous EC Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :06 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :2
Sukinda Bhawan
State :Orissa
District :Jajpur
Tehsil :Sukinda
Village :Kanchichuan
200Attached as annexure in EIA ReportOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubneshwar
(iii)Letter No. 101-490/EPE
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Secured Landfill and Landfill after treatment205287492OthersTons Per Day (TPD)Road
(2.)Incinerator (HZ & BMW)02727OthersTons Per Day (TPD)Road
(3.)Bio Medical Waste012.512.5OthersTons Per Day (TPD)Road
(4.)E Waste08282OthersTons Per Day (TPD)Road
(5.)Spent Solvent Recycling02727Kilo Litre per Day(KLD)Road
(6.)Plastic Recycling01010OthersTons Per Day (TPD)Road
(7.)Plastic Recycling01010OthersTons Per Day (TPD)Road
(8.)Lead Recycling Facility06565OthersTons Per Day (TPD)Road
(9.)Alternative Fuels and Raw Material05555OthersTons Per Day (TPD)Road
(10.)Used Oil Recylcing05454Kilo Litre per Day(KLD)Road
(11.)Paper Recycling01010OthersTons Per Day (TPD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)ICHWTSDF28.3 ha0 ha28.3 haArea
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Sep 2018
(iv)Valid Upto 31 Mar 2023
(v)File No. 155/RO-SPCB/KALINGA NAGAR (WPC/APC)
(vi)Application No. 2264303
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 150
(b) Funds Allocated for Environment Management (Capital) (in Crores) 15.6
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.84
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 10
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 10
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal10OthersTons Per Day (TPD)Local DealersRoad5 Open MarketCopy of Linkage
(2.)HSD20OthersKLLocal DealersRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 09
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube57.140.357.1100 (24 hrs)
(2.)SO2Micro Gram per Meter Cube15.47.115.480 (24 hrs)
(3.)NOxMicro Gram per Meter Cube25.415.125.480 (24 hrs)
(4.)OthersNH3Micro Gram per Meter Cube22.215.522.2400
(5.)PM2.5Micro Gram per Meter Cube24.616.224.560 (24 hrs)
    14.2.     No. of Ground Water monitoring locations : 07
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l980585002000
(2.)Total Hardnessmg/l57769200600
(3.)TSSmg/l0000
(4.)Chloridesmg/l264152501000
(5.)Fluoridemg/l1.10.51.01.5
(6.)pHNA7.67.16.58.5
(7.)Heavy MetalsIronmg/l0.20.20.30.3
    14.3.     No. of Surface Water monitoring locations : 02
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.77.5A
(2.)BODmg/l65D
(3.)OthersTDSmg/l154112A
(4.)CODmg/l2826A
(5.)DOmg/l6.15.8A
    14.4.     No. of Ambient Noise monitoring locations : 07
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.353.355/65
(2.)Leq(Night)A-weighted decibels(dB(A))43.54245/55
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.96.6
(2.)K(Potassium)Kilogram per hectare4020
(3.)Electric ConductivityMillisiemens per Centimetre182109
(4.)N(Nitrogen)Kilogram per hectare272180
(5.)P(Phosphorus)Kilogram per hectare11.84.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 6 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTankers/Ground water1705 Not Appliacble modeOthersRoadOthersTankers/Ground water008 Jan 2019170
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial2325Chemical Treatment, Sand filter and activated carbon filterReuse within the Plant & Recycling23
(2.)Domestic710Septic tank and Soak pit or Mobile STPGreen Belt Renewal Plant7
16.1.
(a)Total Waste Water Generation 30
(b)Total Discharged Water 0
(c)Total Reused Water 30
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Incinerator AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1600Tons0RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube15.40.753.218.680
(2.)PM10Microgram per Meter Cube57.10.750.5957.69100
(3.)PM2.5Microgram per Meter Cube24.50.750.5925.0960
(4.)NOxMicrogram per Meter Cube25.40.753.428.880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)IncineratorHazardous/ Bio Medical Waste300.85NOx3.10
(2.)Spent Solvents/Used Oil BoilerCoal300.85NOx1.9
(3.)IncineratorHazardous /Bio Medical Waste300.85PM100.39
(4.)Spent Solvents/Used Oil BoilerCoal300.85PM100.46
(5.)Spent Solvents/Used Oil BoilerCoal300.85SO22.89
(6.)IncineratorHazardous/Bio Medical Waste300.85SO21.55
(7.)DG SetDiesel100.2PM100.02
(8.)DG SetDiesel100.2SO20.02
(9.)DG SetDiesel100.2NOx0.44
(10.)Lead RecoveryLead Acid Batteries300.5OthersLead0.02
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source North Eastern Electricity Supply Company of Odisha
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 28.32
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 28.32
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 28.32
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Others 0
    Total 28.32
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)LandFill8.73
(2.)Built Up Area1.52
(3.)Green belt9.35
(4.)OthersOthers8.72
Total 28.32
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0None in 10 km Radius
(2.)ESAsNone0None in 10 km Radius
(3.)CorridorsNone0None in 10 km Radius
(4.)Critically Polluted AreaNone0None in 10 km Radius
(5.)ESZsNone0None in 10 km Radius
(6.)Wildlife CorridorsNone0None in 10 km Radius
(7.)WLSNone0None in 10 km Radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBalibo Reserved Forest3Reserved Forest
(2.)Defence InstallationsNone0None in 10 km Radius
(3.)OthersOtherNone0None in 10 km Radius
(4.)Archaeological SitesNone0None in 10 km Radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 28.32
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired None
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Brahmani River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 65
(d)Temporary Employment- During Operation 45
(e)No. of working days 365
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt9.3509.35
(2.)Percentage of Total Project Area33033
(3.)No. of Plants5455854514000
(4.)Funds Allocated05050
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalFacilitating better management of hazardous wastes. Provides a one stop solution for the management of various types of wastes. Minimizes pollution load on environment with an additional benefit of green and clean surroundings. Possibility for recovery of materials thereby conserving the natural resources. Management of wastes is relatively easier and economically viable at a common facility Reduced environmental liability due to captive storage of hazardous waste in the premises of industries
(2.)SocialThe proposed project would proactively promote the public interest through provision of basic amenities such as roads, transportation, electricity, education, sanitation and healthcare facilities. This would also encourage community growth, development and improved socio-economic conditions and quality of life of the people living in the project area. Better standards of living and great social awareness.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Infrastructure and Miscellaneous Projects  +  CRZ
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 5
(d)Total plot area (sqm) 283000
(e)Total built up area (sqm) 102263
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 1000
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 540
5.
Energy Saving Measures:
(a)Source/Mode LED bulbs shall be used for street lights, power s
(b)Percentage 10
(c)Quantity 100
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No discharge to water bodies
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
Additional Detail Sought Additional Detail Sought, 3.
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 061
(ii)Name of the EIA Consultant RAMKY ENVIRO SERVICES PRIVATE LIMITED
(iii)Address Ramky Grandiose, Ramky Tower Complex, Gachibowli, Hyderabad
(iv)Mobile No. 9949991029
(v)Landline No. 0402301535
(vi)Email Id drchakradhar@ramky.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Infrastructure and Miscellaneous Projects  +  CRZ
(ix)Validity of Accreditation 20 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NA

Kindly see the final minutes of 39th meeting of EAC (Infra-2)

05 Apr 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjiv Kumar
DesignationIWMHead
Name of Company (Applicant Name should not be given here)RAMKY ENVIRO ENGINEERS LTD
AddressRamky Enviro Engineers Limited 13th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad
Print