1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Katwa Super Thermal Power Project (2 X 660 MW) | (b)Name of the Company / Organisation | NTPC Limited | (c)Registered Address | NTPC Engineering Office Complex Sector-24, Noida,NTPC Engineering Office Complex Sector-24, Noida,Gautam Buddha Nagar,Uttar Pradesh-201301 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vijay Prakash | (b)Designation (Owner/ Partner/ CEO) | Head of Deptt Env Engg | (c)Address | NTPC Engineering Office Complex Sector-24, Noida,NTPC Engineering Office Complex Sector-24, Noida,,Gautam Buddha Nagar,Uttar Pradesh-201301 | (d)Pin code | 201301 | (e)E-mail | environment.ntpc@gmail.com | (f)STD Code. | 120(f)Telephone No. | 2410331 | (g)Fax No. | 24105060 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(d) Thermal Power Plants
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/WB/THE/25248/2014 | (d)Master Proposal Number(Single Window) | SW/87869/2018 | (e)EAC concerned (for category A Projects only) | Thermal Projects | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 00 | (b)Pincode | 713150 | (c)Bounded Latitudes (North) | | From | | Degree | 23.6 | Minutes | | Second | | From | | Degree | 23.63 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 88.05 | Minutes | | Second | | From | | Degree | 88.08 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 79A/2 and 73M/14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 16 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 2.7 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | West Bengal | Barddhaman | Katwa - I | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-13012/24/2014-IA.I(T) | (b)Date of Apply of TOR | 21 Oct 2014 | (c)Date of Issue of TOR / Standard ToR | 12 Dec 2014 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 30 Jun 2015 | Distance of Public Hearing Venue from the Proposed Project : | 6 |
| At the premises of office of the Sub-Divisional Officer, Katwa | State : | West Bengal | District : | Barddhaman | Tehsil : | Katwa - I | Village : | Srikhanda, Debkundu and Koshigram |
| 150 | major issues raised was related to compensation, employment and CSR etc. | Others | Additional District Magistrate (LR) | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | SUPER THERMAL POWER PROJECT | 2X660 | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | POWER GENERATION | 1320 | Mega Watt(MW) | | Others | Transmission Line | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 7466 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1498.88 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 29.86 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 6460000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 6460000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coal | 6460000 | Tons per Annum | | CIL | Rail | | 0 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 07 Jan 2015 To 31 May 2015 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 11.8 | 9 | 11.3 | 80 | (2.) | SO2 | | Micro Gram per Meter Cube | 5.8 | 4 | 5 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 64 | 47 | 62 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 32 | 19 | 30 | 60 | |
14.2. No. of Ground Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 6 | 5 | 0 | 0 | (2.) | TDS | | | mg/l | | 436 | 342 | 2000 | 1000 | (3.) | pH | | | NA | | 7.42 | 7.32 | 6.5 | 8.5 | (4.) | Chlorides | | | mg/l | | 20 | 10 | 800 | 1000 | (5.) | Fluoride | | | mg/l | | 0 | 0 | 0 | 0 | (6.) | Total Hardness | | | mg/l | | 250 | 90 | 300 | 600 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.16 | 7.52 | C | (2.) | DO | | mg/l | | 5.6 | 4.5 | C | (3.) | BOD | | mg/l | | 3.2 | 2.2 | C | (4.) | COD | | mg/l | | 12 | 8 | C | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 41.8 | 34.4 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 50.6 | 39.6 | 55 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.98 | 6.52 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.0093 | 0.0012 | (3.) | K(Potassium) | Kilogram per hectare | | 270 | 232 | (4.) | N(Nitrogen) | Kilogram per hectare | | 170 | 123 | (5.) | P(Phosphorus) | Kilogram per hectare | | 49.4 | 36.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 4 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 4 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 95040 | 7 | Copy of Permission Letter | Pipeline | | Intake Well | | 57-JS(W) | 28 May 2007 | 95040 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | NA | 1236 | 0 | NA | Reuse within the Plant & Recycling | | 1236 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1236 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1236 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Ash | Fly Ash | | 2701000 | Tons | 0.5 | Others | Pipeline | Others | Ash Dyke | (2.) | Ash | Bottom Ash | | 675250 | Tons | 0.5 | Others | Pipeline | Others | Ash Dyke | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 64 | 4 | 1.2 | 65.2 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 32 | 4 | 1.2 | 33.2 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 5.8 | 4 | 3.9 | 9.7 | 80 | (4.) | NOx | | Microgram per Meter Cube | 11.8 | 4 | 3.9 | 15.7 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Stack | Coal | 150 | 8.35 | SO2 | | 60 | (2.) | Stack | Coal | 150 | 8.35 | PM10 | | 18 | (3.) | Stack | Coal | 150 | 8.35 | NOx | | 60 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | (b)Source | Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 MW | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 318.1 | (c)Government Land (ha.) | 40.46 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 358.56 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 358.56 | 358.56 | Total (ha.) | 358.56 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 115.74 | | (2.) | Ash Pond | | 133.55 | | (3.) | Township | | 24.28 | | (4.) | Green belt | | 36.42 | | (5.) | Water Reservoir | | 8.1 | | (6.) | Others | MAkeup Water Pipeline and Railway Siding | 40.47 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | Not Applicable | (2.) | NPA | NA | 0 | Not Applicable | (3.) | ESAs | NA | 0 | Not Applicable | (4.) | ESZs | NA | 0 | Not Applicable | (5.) | Wildlife Corridors | NA | 0 | Not Applicable | (6.) | Critically Polluted Area | NA | 0 | Not Applicable | (7.) | Corridors | NA | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | Not Applicable | (2.) | Archaeological Sites | | NA | 0 | Not Applicable | (3.) | Defence Installations | | NA | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 358.56 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Ponds and Rivers | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 2.7 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 365 | (f)Total Manpower | 350 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 36.42 | (b)Percentage of Total Project Area | 10.16 | (c)No. of Plants to be Planted | 25000 | (d)Funds Allocated for Plantation | 50000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment, infrastructure development | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Thermal Projects |
|
1. | Specifications of Plant: | (b) Technology Proposed | Supercritical | (b) Plant Load Factor(%) | 90 | (c) Station Heat Rate (Kcal/Kwh) | 2317.44 | (d) Steam Rate/Flow Rate | 1708 | (e) Boiler Temperature | 593 | (f) Boiler Pressure | 247 | (g) Type of Stack | Bi-flue | (h) No. of Stacks | 1 | |
|
S. No. | Stack ID | Stack Height (m) | Stack Diameter at exit (m) | Exit Velocity of Stack Gas (m/s) | Exit Temperature of Stack Gas (Degree Celsius) |
---|
(1.) | 0 | 150 | 8.2 | 18 | 50 | |
|
2. Details of Fuel Linkage |
---|
S. No. | Type of Fuel | Type of Linkage | Other Type of Linkage | Details | Characteristics |
---|
(1.) | Coal | Linkage | | Source of Linkage : | CIL | Quantity of Linkage Granted : | 6460000 | Date of Linkage : | 15 May 2018 | Duration of Linkage : | 25 |
| Gross Calorific Value (Kcal/Kg) : | 3000 | Ash Content (%) : | 39 | Sulphur Content (%) : | 0.5 | Moisture (%) : | 12 | Mercury (mg/kg) : | 0 | Fixed Carbon (%) : | 21 | Volatile Matter (%) : | 21 |
| |
|
3. Details of Transportation of Fuel |
---|
S. No. | Fuel | Rail | Road | Pipe Conveyor | Conveyor Belt | Arial Ropeway | Other Mode of Transportation | Total Distance | Total Quantity |
---|
(1.) | Coal | | | | | | | 0 | 0 | |
TOTAL | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | |
|
4. | Details of Cooling System: | (a) Type of Cooling System | Water Cooled | (b) Type of Draft | Forced Draft | (c) Type of Air Circulation | Parallel Flow | (d) Cycle of Cooling (COC) | 5 | (e) Water Req. For Cooling (m3/day) | 95040 | (f) Boiler Blow Down Temperature | 106 | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1013/008 | (ii)Name of the EIA Consultant | EMTRC CONSULTANTS PRIVATE LIMITED | (iii)Address | EMTRC CONSULTANTS PRIVATE LIMITED P-501, ANUPAM APARTMENTS, EAST ARJUN NAGAR, DELHI-110032 | (iv)Mobile No. | 9810032481 | (v)Landline No. | 0112230117 | (vi)Email Id | moitra@emtrc.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Thermal Projects | (ix)Validity of Accreditation | 10 Dec 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | Eds Raise Letter | The ToR was issued on 12.12.2014 which was valid for three years, i.e. till 11.12.2017. Further, ToR was again extended for one more year on 15.9.2017 which was valid till 11.12.2018. As per the EIA report, the baseline has been collected during January 2015-May 2015 which is more than three years old. Further, Public Hearing has been conducted on 30.6.2015 which is also more than three years. | 21 Feb 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Vijay Prakash | Designation | Head of Deptt Env Engg | Name of Company (Applicant Name should not be given here) | NTPC Limited | Address | NTPC Engineering Office Complex