Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mining of beach sand minerals of 750000 TPA in Alappad, Panmana and Ayanivelikulangara villages in Karunagapally taluk, Kollam
(b)Name of the Company / Organisation INDIAN RARE EARTHS LIMITED
(c)Registered Address CHAVARA KOLLAM,Kollam,Kerala-691583
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant S SURYAKUMAR
(b)Designation (Owner/ Partner/ CEO) CGM
(c)Address NIL
(d)Pin code 691583
(e)E-mail cgm-ch@irel.co.in
(f)STD Code. 476(f)Telephone No. 2680701
(g)Fax No. 04762680141
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/KL/MIN/85725/2008
(d)Master Proposal Number(Single Window) SW/85723/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy.No.253to259,267,268,269,278,279,290,291,292,293
(b)Pincode 690547
(c)Bounded Latitudes (North) FROM 9.015547 To 9.034388
(d)Bounded Longitudes (East) FROM 76.508305 To 76.521441
(e)Survey of India Topo Sheet No. 58 C/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Kerala
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KeralaKollamKarunagappallyAlappad, Panmana and Ayanivelikulangara
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of EC NIL
(c)Date of Issue of EC NIL
(d)Previous EC Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 May 2018
Distance of Public Hearing Venue from the Proposed Project :9
FKM Auditorium Chavara
State :Kerala
District :Kollam
Tehsil :Karunagappally
Village :Chavara
3651 There is no mention about environment impact in the public hearing. The environment impact study should be clarified. Salt intrusion in Vellanathuruthu as a result of mining has adverselOthersADM
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. EP.12.1/2010-11/26/Kerala dated 11.01.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)180237150750000987150Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Dredger/Excavater101Only Capacity expansion
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 13 Feb 2019
(iv)Valid Upto 31 Oct 2021
(v)File No. PCB/HO/KLM/ICO/15/08(2)
(vi)Application No. 5559670
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 9
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.46
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.09
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.13
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 750000
(b)Existing quantity of raw material/fuel 237150
(c)Total quantity of raw material/fuel 987150
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sand750000Tons per AnnumLITRES/YEARPanmanaRoad2 OthersCONTRACTCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2015 To 31 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube103380
(2.)NOxMicro Gram per Meter Cube103380
(3.)PM2.5Micro Gram per Meter Cube20101060
(4.)PM10Micro Gram per Meter Cube663663100
    14.2.     No. of Ground Water monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)OthersTotal Alkalinitymg/l35612200600
(2.)Heavy MetalsLeadmg/l0.030.010.050.05
(3.)Total Hardnessmg/l702140200600
(4.)pHNA7.866.556.58.5
(5.)Fluoridemg/l0.50.21.01.5
(6.)TSSmg/l10.70.3100500
(7.)TDSmg/l115330500200
(8.)Chloridesmg/l7057.415.92501000
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.387.38E
(2.)CODmg/l700500E
(3.)DOmg/l7.687.68E
(4.)BODmg/l500400E
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))655070
(2.)Leq(Day)A-weighted decibels(dB(A))745475
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre64
(2.)pHOthersna8.55.9
(3.)N(Nitrogen)Percent0.70.09
(4.)K(Potassium)Percent0.710.32
(5.)P(Phosphorus)Percent0.710.32
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.2 To 1.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.4 To 1.7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersArtificial pond, water will be recirculated.1776100Copy of Permission LetterPipelineOthersRecirculationNA16 Nov 20180
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA00NAOthersNA00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NAOthersNA0Tons0OthersNAOthersNA
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5NA00000
(2.)PM10Microgram per Meter Cube630.1003598100
(3.)NOxNA00000
(4.)SO2NA00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1188400
(b)Source KSEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 113.79
(c)Government Land 48
(d)Revenue Land 0
(e)Other Land 18.21
    Total Land 180
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 700
(e)Settlements 6082
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 14270
(j)Others : 0 0
    Total 21052
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt5.82
Total 5.82
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)CorridorsNA0NA
(5.)Wildlife CorridorsNA0NA
(6.)Critically Polluted AreaNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)OthersNANA0NA
(3.)Archaeological SitesNA0NA
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 1200
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 18.21
(b)Land yet to be acquired(Ha) 113.79
(c)Status of Land acquisition if not acquired in progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 3
(b)No. of Households 753
(c)No. of PDFs (Project Displaced Families) 753
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 100
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area T S CANAL
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Arabian Sea
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 150
(e)No. of working days 300
(f)Total Manpower 230
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Percentage of Total Project Area03.233.23
(2.)Total Area of Green Belt2.735.828.55
(3.)No. of Plants218465683
(4.)Funds Allocated101020
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalMonazite radio active mineral will be mined out.
(2.)SocialCreate temporary job opportunities to local people.
(3.)FinancialThe Monazite and Zircon minerals produced by IREL are used for strategic applications by Department of Atomic Energy in the Nuclear Energy Programmes.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 5
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)iLIMINITEMajor
(2.)SILLIMANITEMajor
(3.)RUTILEMajor
(4.)ZIRCONMajor
(5.)MONOZITEMajor
2.
Mine Capacity in ROM (Run of Mine) 750000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. AMD/MRG/IREL-Chavara/MMP/180
(b)Date of Approval 15 Nov 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Atomic
(e)Approved Mining Lease Area 180
(f)Approved Capacity 750000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 6.321
(b)Mineable Reserves (Million Ton) 6.025
(c)Extractable Reserves(Million Ton) 6.025
(d)Percent(%) of Extraction 16
(e)Grade of Coal /Ore /Mineral 17.62
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) NA
(i)Mining Method Opencast
(j)Life of Mine (Years) 30
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 180
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 08 Jun 2007
(iii)Validity of LOI 24
(iv)Reference No. of LOI G.O.(Rt) .No. 746/07/ID
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 180
(iii)Validity of the lease deed From : 10 Aug 2011 To : 09 Aug 2031
(iv)Date of Execution of Mining Lese 07 Jun 2011
(v)Reference Number G.O.(Rt) .No. 746/07/ID
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof validity continues
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface In pit
(b)Surface to Siding/Loading loading
(c)Transportation / Conveyor Details tippers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)FOREST LAND000
(3.)WASTE LAND000
(4.)GRAZING LAND000
(5.)SETTLEMENTS32.146395.866427
(6.)SURFACE WATER BODIES52.505648.395700
(7.)OTHERS(Specify)sea010837.99510837
TOTAL84.64517882.2517964
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0000
(2.)BUILT UP AREA (COLONY/OFFICE)1001
(3.)GREEN BELT5.82005
(4.)INTERNAL OB DUMPS0000
(5.)TOP SOIL STORAGE0000
(6.)EXTERNAL OB DUMPS0000
(7.)ROADS0000
(8.)VIRGIN AREA47.9750047
TOTAL54.79500053
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 50
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 80
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 5200
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan NO
Total Area Excavated (in hectare) 0
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)201617237150237150237150237148.850
(2.)201718237150237150237150231703.920
(3.)20131423715023715023715000
(4.)20141523715023715023715000
(5.)20151623715023715023715000
(6.)20111223715023715023715000
(7.)20121323715023715023715000
Additional Detail Sought:   NIL ,w ,3.NIL
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/RA075/243
(ii)Name of the EIA Consultant CSIR-NIIST
(iii)Address CSIR – National Institute for Interdisciplinary Science and Technology (NIIST) Council of Scientific & Industrial Research (CSIR), Ministry of Science and Technology, Govt of India . Industrial Estat
(iv)Mobile No. 9447206472
(v)Landline No. 0471251537
(vi)Email Id ansari@niist.res.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 11 Jun 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS SURYAKUMAR
DesignationCGM
Name of Company (Applicant Name should not be given here)INDIAN RARE EARTHS LIMITED
AddressCHAVARA KOLLAM
Print