Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Nandolia Organic Chemcals Pvt. Ltd.
(b)Name of the Company / Organisation NANDOLIA ORGANIC CHEMICALS PVT. LTD.
(c)Registered Address Plot No. 2920, Phase-III, GIDC Industrial Estate, Panoli, Taluka Ankleshwar,Bharuch,Gujarat-394116
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Abid Nandolia
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. 2920, Phase-III, GIDC Industrial Estate, Panoli,,Anklesvar,Bharuch,Gujarat-394116
(d)Pin code 394116
(e)E-mail factory@nandoliachemicals.com
(f)STD Code. 2646(f)Telephone No. 272649
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
(b)Category A
(c)Proposal Number IA/GJ/IND2/74191/2018
(d)Master Proposal Number(Single Window) SW/85492/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. C-101 & 102
(b)Pincode 392140
(c)Bounded Latitudes (North) FROM 21.77527778 To 21.77555556
(d)Bounded Longitudes (East) FROM 72.82027778 To 72.82166667
(e)Survey of India Topo Sheet No. F43M9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 20
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 30
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 2
(c)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchVagraSaykha
(2.)MaharashtraPalgharNo DataTarapur MIDC
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/136/2018-IA-II(I)
(b)Date of Apply of TOR 11 Apr 2018
(c)Date of Issue of TOR / Standard ToR 18 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Unit is located in Notified industrial area of Say
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Manufacturing PlantPesticides & Pesticides Specific Intermediates4850 MT/Month
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pesticides & Pesticides Specific Intermediates4850OthersMT/MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 30.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 20
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 8000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 8000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Carbon disulphide9816Tons per AnnumLocal MarketRoad10 Open MarketCopy of Linkage
(2.)Potassium Carbonate228Tons per AnnumLocal MarketRoad10 Open MarketCopy of Linkage
(3.)Sodium hydroxide11520Tons per AnnumLocal MarketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube81.0672.481100
(2.)NOxMicro Gram per Meter Cube19.4813.631980
(3.)SO2Micro Gram per Meter Cube17.6412.571780
(4.)PM2.5Micro Gram per Meter Cube45.7842.764560
(5.)OthersOzoneMicro Gram per Meter Cube11.8510.1911180
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.337.448.58.5
(2.)Total Hardnessmg/l165.3101.6300600
(3.)TDSmg/l6382155002000
(4.)Chloridesmg/l78.5759.122501000
(5.)TSSmg/l14390100
(6.)OthersCalciummg/l133.438.6475200
(7.)Fluoridemg/l0011.5
(8.)Heavy MetalsCoppermg/l000.051.5
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.28.2C
(2.)OthersTSSmg/l55C
(3.)DOmg/l4.84.8C
(4.)CODmg/l8.48.4C
(5.)BODmg/l11C
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.741.245
(2.)Leq(Day)A-weighted decibels(dB(A))53.147.255
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram291.4196.8
(2.)Electric ConductivityMillisiemens per Centimetre5545
(3.)K(Potassium)Milligram per Kilogram862248
(4.)pHOthersNA7.897.21
(5.)P(Phosphorus)Milligram per Kilogram92.5364.57
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply4995Copy of Permission LetterPipelineOthersGIDC PipelineGIDC/BRH/WS/13615 Mar 2018600
(2.)OthersGIDC Water Supply4995Copy of Permission LetterPipelineOthersGIDC PipelineGIDC/BRH/WS/13615 Mar 2018600
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial564600ETP, MEEDischarge into Seawater Body,OthersLoss15549
16.1.
(a)Total Waste Water Generation 564
(b)Total Discharged Water 549
(c)Total Reused Water 15
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Sludge from ETPIndustrial Waste2400Tons30RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)AshIndustrial Waste300Tons20RoadRoadOtherssale
(3.)Bags and ContainersIndustrial Waste500Tons25RoadAuthorized Recyclerssold to GPCB authorised recyclers
(4.)Used Filters/Used Cloths & MaterialsIndustrial Waste0.12Tons15RoadCo-Processing
(5.)Process residue from CresolHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Tons15RoadOthersCo-Processing or Sent to incineration facility
(6.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Tons15RoadOthersCo-processing or sent to incineration facility
(7.)Used OilIndustrial Waste300Kilolitre15RoadAuthorized Recyclers
(8.)Solvent Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)300Tons15RoadCo-Processing
(9.)Used HyflowIndustrial Waste30Tons15RoadCo-Processing
(10.)Residue from Salts MEEIndustrial Waste2400Tons30RoadTreatment, Storage and Disposal Facility(TSDF)
(11.)Process ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons15RoadCo-Processing
(12.)Expired PesticidesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)300Tons15RoadOtherssent to Incineration Facility
(13.)Sludge from ScrubbersIndustrial Waste0.12Tons30RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube72.406.090.33572.735100
(2.)NOxMicrogram per Meter Cube16.186.090.19616.37680
(3.)PM2.5Microgram per Meter Cube45.786.090.33545.11560
(4.)SO2Microgram per Meter Cube13.866.090.55714.41780
(5.)Others(Specify)NH3Microgram per Meter Cube06.090.0360.036400
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Bolier-1 (6 TPH)Coal/Agrowaste/Briquette300.8PM10150
(2.)Thermic Fluid HeaterCoal/Agrowaste/Briquette300.8PM10150
(3.)DG SetDiesel100.2PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 750
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 750
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 1.95
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1.95
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 9706.81
(b)Waste/Barren Land 1171.69
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 102.13
(e)Settlements 375.56
(f)Industrial 9.31
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Miscellaneous 105.75
    Total 11471.249999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.525
(2.)OthersInfrastrucuture0.7815
(3.)Green belt0.6435
Total 1.95
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPA-0-
(2.)ESAs-0-
(3.)ESZs-0-
(4.)Wildlife Corridors-0-
(5.)WLS-0-
(6.)Critically Polluted Area-0-
(7.)Corridors-0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest-0-
(2.)Archaeological Sites-0-
(3.)Defence Installations-0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.95
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 50
(e)No. of working days 320
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt .6435
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 50
(d)Funds Allocated for Plantation 25
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
Additional Detail Sought Additional Detail Sought, 3.
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay order against QCI
(ii)Name of the EIA Consultant Aqua Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJARAT)
(iv)Mobile No. 9904433995
(v)Landline No. 0261246085
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 05 Apr 2016
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NANA 20 Mar 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAbid Nandolia
DesignationDirector
Name of Company (Applicant Name should not be given here)NANDOLIA ORGANIC CHEMICALS PVT. LTD.
AddressPlot No. 2920, Phase-III, GIDC Industrial Estate, Panoli, Taluka Ankleshwar
Print