Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EIA Study for Offshore Oil and Gas Development and Production from Discovered Small Field of B-9 Cluster fields at Mumbai Offshore Basin.
(b)Name of the Company / Organisation ADANI WELSPUN EXPLORATION LIMITED
(c)Registered Address Welspun House, 3rd Floor, Kamala City, Senapati Bapat Marg, Lower Parel (W), Mumbai 400013,Mumbai City,Maharashtra-400013
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Arvind Hareendran Hareendran
(b)Designation (Owner/ Partner/ CEO) VP
(c)Address Welspun House, 3rd Floor, Kamala City, Senapati Bapat Marg, Lower Parel West,Mumbai,,Mumbai,Mumbai City,Maharashtra-400013
(d)Pin code 400013
(e)E-mail arvind.hareendran@adani.com
(f)STD Code. 22(f)Telephone No. 66136296
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
(b)Category A
(c)Proposal Number IA/MH/IND2/82182/2017
(d)Master Proposal Number(Single Window) SW/82155/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Mumbai Offshore
(b)Pincode 400013
(c)Bounded Latitudes (North) FROM 19.4500 To 20.3000
(d)Bounded Longitudes (East) FROM 71.0000 To 71.4500
(e)Survey of India Topo Sheet No. 00
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 00
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraMumbai CityMumbaiMumbai Offshore Basin
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/565/2017-IA II (I)
(b)Date of Apply of TOR 12 Dec 2017
(c)Date of Issue of TOR / Standard ToR 13 Mar 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason With reference to ToR, Public Hearing is exempted
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Laying of sub-sea pipelines.130 km. (approx.)
(2.)Drilling of wells.12 Nos.
(3.)Installation of well head platforms4 Nos.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Oil800OthersbopdPipe Conveyor
(2.)Natural Gas32OthersmmscfdPipe Conveyor
(3.)Natural Gas21OthersmmscfdPipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1600
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 00
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.38
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 12
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 12
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)diesel12Kilo Litre per DayOpen MarketOthersThrough Tanks100 LOACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Feb 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 00
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10NA00000000
(2.)PM2.5NA00000000
(3.)NOxNA00000000
(4.)SO2NA00000000
    14.2.     No. of Ground Water monitoring locations : 00
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA00000000
(2.)TDSNA00000000
(3.)Total HardnessNA00000000
(4.)FluorideNA00000000
(5.)Heavy Metals00NA00000000
(6.)pHNA00000000
(7.)ChloridesNA00000000
    14.3.     No. of Surface Water monitoring locations : 05
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.28.0D
(2.)DOmg/l5.24.4D
(3.)BODmg/l22D
(4.)CODmg/l0000D
    14.4.     No. of Ambient Noise monitoring locations : 00
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))000000
(2.)Leq(Night)A-weighted decibels(dB(A))000000
    14.5.     No. of Soil Sample Monitored locations : 00
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)OthersN/A0000
(2.)P(Phosphorus)OthersN/A0000
(3.)pHOthersN/A0000
(4.)K(Potassium)OthersN/A0000
(5.)Electric ConductivityOthersN/A0000
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 00 To 00
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 00 To 00
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Sea5000 Not Appliacble modeOthersNAOthersNAN/A16 Oct 201850
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage Water1620As per CPCB GuidelinesDischarge into Seawater Body16
16.1.
(a)Total Waste Water Generation 16
(b)Total Discharged Water 16
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Drill CuttingsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500Tons00OthersVesselsAuthorized Recyclers
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)00Kilolitre00OthersVesselsAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2NA0000000000
(2.)NOxNA0000000000
(3.)PM10NA0000000000
(4.)PM2.5NA0000000000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)00000000PM1000
(2.)00000000SO200
(3.)00000000NOx00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1200
(b)Source D.G. Sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) As per requirement.
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 00
(c)Government Land 00
(d)Revenue Land 00
(e)Other Land 00
    Total Land 0.0
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 00
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 00
(e)Settlements 00
(f)Industrial 00
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : 00 00
    Total 0
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersMumbai Offshore Area0000
Total 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANOT Applicable0000
(2.)ESZsNOT Applicable0000
(3.)Critically Polluted AreaNOT Applicable0000
(4.)WLSNOT Applicable0000
(5.)ESAsNOT Applicable0000
(6.)Wildlife CorridorsNOT Applicable0000
(7.)CorridorsNOT Applicable0000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestN/A0000
(2.)Defence InstallationsN/A0000
(3.)Archaeological SitesN/A0000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 00
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired N/A
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 0
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Total Area of Green Belt 00
(b)Percentage of Total Project Area NaN
(c)No. of Plants to be Planted 00
(d)Funds Allocated for Plantation 00
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialOf the total primary energy consumption basket, oil and gas constitute 45% share in the total energy basket mix. About 78 per cent of India’s petroleum consumption is met from imports (mostly of crude oil), while about 25% of natural gas (including LNG) consumption comes from imports. It is estimated that in the coming years, the import dependency for crude oil alone would reach above 90% level. Thus, Development of existing oil reserves has become a necessity to bridge the rising demand-supply
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
Additional Detail Sought Additional Detail Sought, 3.
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1417/SA 030
(ii)Name of the EIA Consultant Asian Consulting Engineers Pvt Ltd.
(iii)Address II Floor, 66, Hemkunt Colony, Near Nehru Place , New Delhi- 110 048 INDIA
(iv)Mobile No. 9810969369
(v)Landline No. 41634926
(vi)Email Id info@asianconsulting.org
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 17 Nov 2017
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe EAC, after deliberations, found the proposal deficientin respect of compliance of many of the terms and conditions stipulated in the ToR dated13th March 2018, as under:- (i) Baseline air quality of the areas immediately affected by the development drilling, particularly with reference to Hydrogen Sulphide, Sulphur Dioxide, NOx and background levels of Hydrocarbons and VOCs. (ii) Details on estimation and computation of air emissions (such as Nitrogen Oxides, Sulphur Oxides, Carbon Monoxide, Hydrocarbons, VOCs, etc) resulting from flaring, DG sets, combustion, etc. in all project phases. (iii) Baseline data collection within 1km of each development well, in respect of oil/metal/hydrocarbon content in the surface water and sediments. (iv) Details of DG Sets and other utilities. (v) Prediction of various parameters vis-à-vis estimated gas production. (vi) Source of fresh water,water balance and effluent treatment mechanism. (vii) Procedure for handling oily water discharges from deck washing, drainage systems, bilges, preventing spills and spill contingency plans, treatment and disposal of produced water. (viii) Details of blowout preventer installation. (ix) Risk assessment and mitigation measures including independent reviews of well design, drilling and proper cementing and casing practices. (x) Details of all environment and safety related documentation within the company (regarding Life of pipeline, Corrosion prevention method, inspection etc)in the form of guidelines, manuals, monitoring programmes including Occupational Health Surveillance Programme etc. (xi) Applicability of OISD Standards. The proposal was deferred for the needful. 22 Apr 2019
2. ADS LetterWith reference to the subject line, we are hereby submitting the EIA Addendum Report of “Offshore Oil and Gas Development and Production from Discovered Small Field of B-9 Cluster fields at Mumbai Offshore Basin”, in compliance to the terms and conditions given in minutes of 6th EAC (Industry-2) meeting held during 8-9 April 2019 (Agenda no. 6.3.3). In view of above, we hereby request you to kindly review the enclosed report and consider the project in upcoming EAC meeting. 17 Jul 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantArvind Hareendran Hareendran
DesignationVP
Name of Company (Applicant Name should not be given here)ADANI WELSPUN EXPLORATION LIMITED
AddressWelspun House, 3rd Floor, Kamala City, Senapati Bapat Marg, Lower Parel (W), Mumbai 400013