Form-5
APPLICATION FOR EXTENSION OF VALIDITY OF TOR
(To be filled up by User Agency)
1.
Details of Project
Proposal No. :
IA/UP/THE/137558/2020
(a) Name of the project :
Proposed Expansion Project Phase-II, 3x660 MW of M/s Lalitpur Power Gen. Co. Ltd.
(b) Name of Company / Organisation. :
LALITPUR POWER GENERATION COMPANY LIMITED
(c) Registered Address. :
Vill. Badagaon (Chiglaua)-Mirchwara
(d) Legal Status of the Company. :
Private
(e) Joint Venture (Yes/No) :
No
2.
Address for the Correspondence
(a) Name of Applicant. :
Ajay
(b) Designation (Owner/Partner/CEO) :
President EHS & DB
(c) Address :-
Vill. Badagaon (Chiglaua)-Mirchwara
State :
Uttar Pradesh
District :
Lalitpur
Town / Village :
No
(d) Pin Code :
201301
(e) Email :
avsingh@lpgcl.com
(f) Telephone no :
4045376
(g) Fax no :
2552254
(h) Mobile no :
9873561813
(i) Contact Person. :
Ajay
(j) Website (if any) :
www.bajajgroup.org
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006
(a). Major Activity. :
1(d) Thermal Power Plants
Minor Activity :
No
Major Sub Activity. :
No
Minor Sub Activity :
No
(b). Category :
A
Reason for applicant at central level/state level(in case of B1 and B2 projects):
No
4.
Location of Project
(a) Plot No/Survey No/Khasra No :
1939,1934,1972,1935,1663,1708,1741, 1780,1725, 1809 1870
(b) Village :
Mirchwara and Buraugaon
(c) Tehsil :
Mahroni
(d) District :
Lalitpur
(e) State :
Uttar Pradesh
(f) Pin Code :
284123
(g) Bounded Latitudes (North) :
Yes
From :
Degree:24, Minutes : 47, Second :05.00
To :
Degree:24, Minutes : 48, Second :26.76
(h) Bounded Longitudes (East) :
Yes
From :
Degree:78, Minutes : 38, Second :02.54
To :
Degree:78, Minutes : 38, Second :58.00
(i) Survey of India Topo Sheet No :
54 L/9, L/10, L/13, L/14
5
Details of Terms and Reference
(a) Project Name :
Proposed Expansion Project Phase-II, 3x660 MW of M/s Lalitpur Power Gen. Co. Ltd.
(b) MoEF&CC / SEIAA File No :
J-13012/08/2016-IA.I (T)
(c) Date of issue of ToR :
31/01/2017
(d) Uploaded ToR letter (PDF Only):
6.
Reason for Seeking Extension of Validity of the ToR:-
Uploaded Supporting Doument ,if any:
7.
Baseline Data/EIA/EMP Details
Whether baseline data was collected (Yes/No) :
Yes
Period of baseline data collection :
October 2016 - December 2016, January 2017 - February 2017 and October 2019 - December 2019
8.
Whether EIA/EMP was prepared
Whether EIA/EMP was prepared based on the ToR (Yes/No) :
Yes
When was the EIA/EMP prepared :
6/12/2017
9.
Public Hearing
Whether Public Hearing was conducted (Yes/No) :
No
10
Any Amendment in the ToR is needed ?:-
a.
Details of Configuration (Multiple Entries Allowed)
Details of Configurations
S.no
Plant/ Equipment/ Facility
Existing Configuration
Proposed Configuration
Final configuration after Amendment
Remarks if Any
1
coal based thermal power plant
3x660 MW (Phase-I)
3x660 MW (phase II)
6x660 MW including phase I and Phase II
Applied for TOR validity extension
b.
Details of Production :-
Details of Products
S.no
Product / Activity (Capacity/ Area).
Quantity From
Quantity To
Unit
Mode of Transport/ Transmission of Product
1
1980
0
1980
MW
765 KV transmission line to UPPCL GRID
c.
Details of Amendment Required
Any Other Amendment Required
S.no
Reference of Approved ToR
Description as per Approved ToR
Description as per Proposal.
Remarks
1
NIL
NIL
No amendment is proposed
No amendment is proposed
11.
Details of EIA Consultant
Have you hired Consultant for preparing document (Yes/No) ? :
Yes
(i) Accereditation No :
QCI/NABET/ENV/ACO/19/0957
(ii) Name of EIA Consultant :
Vimta Labs Limited
(iii)Address :
142, IDA, phase - 2, Cherlapally, Hyderabad - 500051
(iv)Mobile No:
9000711309
(v)Landline No :
04027264141
(vi)E-mail Id :
janardhan@vimta.com
(vii)Category of Accreditation :
A
(viii)Sector of Accreditation :
A
(ix)Validity of Accreditation :
19.11.2020
(x)Uploaded certificate of Accreditation certified by QCI/NABET (Upload PDF Only):
12.
Document to be Attached
(a) Uploaded Copy of revised Form-I (in case of Amendment in ToR also required):
(b) Uploaded revised Pre-feasibilty report (in case of Amendment in ToR also required):
(c)Uploaded Cover Letter duly signed by the project proponent or authorized person:
(d)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:
(e)Uploaded Additional File, If any:
(f)Uploaded Proposal Presentation :
No Data
Essential Details Sought
Essential Details Sought
S.no.
EDS Sought Date
EDS Sought
Letter
1.
29/01/2020
The correction have been made as per the instruction received
2.
29/01/2020
The details regarding earlier EDS were not submitted. Pls submit the information at the earliest for consideration: 1. the period of baseline data collection. 2. whether draft EIA/EMP has been prepared or not. 3.If yes, whether the draft EIA report has been submitted to SPCB for conducting public hearing. Please provide the details. 4.If draft EIA is submitted to SPCB, the status of public hearing. If not, please provide the reasons for delay in preparation of EIA report and submission to SPCB for public hearing.
Additional Detail Sought:
NIL
13.
Undertaking:-
(a):
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up.
(b)Name :
Ajay Vikram Singh
(c)Designation:
President EHS & DB
(d)Company:
LALITPUR POWER GENERATION COMPANY LIMITED
(e)Address:
Vill. Badagaon (Chiglaua)-Mirchwara