APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | N. Dhanamohan Kumar,Gravel Quarry
from over an Extent of 0.70.0Ha in S.F.No: 109 (P) at Appanaickenapatti Village of Sulur
Taluk, Coimbatore District. |
| (ii). | Location / site (GPS Co-ordinate) | 10°59’03.80’’N to 10°59’07.99’’N 77°09’39.90’’E to 77°09’42.95’’EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 0.70.0 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 2912 | | (v). | Period of Mining Lease | 3 | | (vi). | Expected cost of the Project | 4.54 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 019/87/A | Name of Consultant/RQP | A.Jagannathan | Address | Fairlands Salem | Mobile No. | 9443356539 | Landline No. | 2431989 | Email Id | infogeoexploration@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 0 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 0.1 km | | (iii). Nearest Railway Line along with distance in kms | 8.5 km | | (iv). Nearest National Highway along with distance in kms | 4.5 km | | (v). Nearest State Highway along with distance in kms | 3 km | | (vi). Nearest Major District Road along with distance in kms | 0 km | | (vii). Nearest Any Other Road along with distance in kms | 0.1 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 0 km | | (x). Nearest In-take for drinking water pump house distance in kms | 1 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No protected areas to be identified with in
10km distance. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | There is no wild life, bird sanctuary, Social
forest 10km near the quarrying lease applied
area.
There is no coastal zone, Forest, CRZ, Eco
sensitive zone within the radius of 10Km, the
area does not fall in HACA region.
Sulur lake is situated 6.5km from the North
western side of the area.
Noyyal river is passing on the 7.0km from the
North western side of the area. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | There is no protected sensitive species
identified within the 10km radius. | 6. | Inland, coastal, marine or underground waters | There is no Inland, coastal, marine or
underground water around the site. | 7. | State, National boundaries | There is no State or National boundaries within
a radius of 10Km. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | The Tourist, pilgrim areas within 10Km radius | 9. | Defence installations | No defense installation found 10km near the
site | 10. | Densely populated or built-up area, distance from nearest human habitation | Karadivai 4.0Km (SE) | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Sulur is having all the facilities, which are at a
distance of 6km on the North western side of the
area. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | The quarry operation is restricted to only 2m
below the ground level and proposed to
excavate for a period of Three years only.
Hence the ground water will not be affected
beside the area is devoid of agriculture,
Forestry, Tourist place etc. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | This is a fresh lease applied area. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | The area is not susceptible to natural hazards
like landslides, Earth quake; it is a high stable
land. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/TN/MIN/8428/2017 | File Number | To be assigned | Date of Apply EC | 16 Aug 2017 |
| |
|