APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | A.Bellarmine Jose,Rough stone
quarry from over an Extent of 2.66.03Ha in S.F.No. 409/4A5B at Nattalam Village of
Vilavancode Taluk, Kanniyakumari District. |
| (ii). | Location / site (GPS Co-ordinate) | 08°16'04.27'N to 08°16'11.19''N 77°13'44.25''E to 77°13'54.83''EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 2.66.0 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 260322 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 57.32 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | No | Reason for not hiring the Consultant/RQP | Aware of the project and the project is site speci | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 1 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 0.01 km | | (iii). Nearest Railway Line along with distance in kms | 3 km | | (iv). Nearest National Highway along with distance in kms | 4 km | | (v). Nearest State Highway along with distance in kms | 2 km | | (vi). Nearest Major District Road along with distance in kms | .500 km | | (vii). Nearest Any Other Road along with distance in kms | 1 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 4 km | | (x). Nearest In-take for drinking water pump house distance in kms | 1 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | There are no such protected areas like ecological
landscape, cultural area etc. identified within the
15 Km radius. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | There is no eco-sensitive areas, forest within the
radius of 15km
Odai & Tank are present in the 500m radius of
the lease applied area.
Thamiraparani River is flow about 4.0Km from
the Northwestern side of the area.
CRZ Zone is situated about 7km away from the
Southwestern side of the lease applied area.
The Western Ghats region is located 10km away
from the North eastern side of the lease area. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | There is no protected sensitive species are
identified within the 15km radius. | 6. | Inland, coastal, marine or underground waters | There is no Inland, coastal, and marine or
underground water around the site. | 7. | State, National boundaries | The Interstate boundary is situated 8km away
from the North western side. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | There is no tourist, pilgrim areas within 15 Km
radius | 9. | Defence installations | No defense installation found within 15Kms from
the project area. | 10. | Densely populated or built-up area, distance from nearest human habitation | Nattalam - 1.0km | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Marthandam is having all the facilities which are at
a distance of 4.5km on Northwestern side of lease
area. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | The quarry operation is restricted to only 88m
depth from the top of the hill (63m AGL + 25m
BGL) for a period of Five years. Hence the ground
water will not be affected beside the area is
devoid of agriculture, Forestry, Tourist place etc., | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | This is the fresh quarry project, hence the area
has not subjected to pollution or environmental
damage. The atmosphere is quite fresh and it is
proposed to carry out the quarrying operations an
Eco friendly manner. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | The areas are not susceptible to natural hazards
like landslides, earthquake, it is a high stable
land. There are no evidences recorded in the past
history. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/TN/MIN/6640/2017 | File Number | To be assigned | Date of Apply EC | 22 Jun 2017 |
| |
|