APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | R.Anupkumar Lohia, Multi- Coloured
Granite quarry from over an Extent of 4.80.0Ha in S.F.No. 442/3 (P) at
K.Pitchampatti Village of Karur Taluk, Karur District |
| (ii). | Location / site (GPS Co-ordinate) | 10°46’07.00’’N to 10°46’15.62’’N
78°03’23.52’’ E to 78°03’34.46’’ EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 4.80.0 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 35050 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 140.7 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 183/2004/A | Name of Consultant/RQP | Ifthikhar Ahmed M | Address | Fairlands, Salem | Mobile No. | 9443356539 | Landline No. | 2431989 | Email Id | pproponent@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 0 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 1 km | | (iii). Nearest Railway Line along with distance in kms | 7 km | | (iv). Nearest National Highway along with distance in kms | 13 km | | (v). Nearest State Highway along with distance in kms | 8 km | | (vi). Nearest Major District Road along with distance in kms | 0.040 km | | (vii). Nearest Any Other Road along with distance in kms | 0 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 1 km | | (x). Nearest In-take for drinking water pump house distance in kms | 1 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | There are no such protected areas like ecological
landscape, cultural area etc. identified within the
10Km radius. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | There is no bird sanctuary, Wild life sanctuary, CRZ,
Western Ghats, HACA, Eco sensitive zone and forest
within the radius of 10Km.
Kandedutha Manickam Lake is situated 1km from the
Southwestern side of the area.
Kodaganar River is flow about 8km from the
Northwestern side of the area. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | ----------------- | 6. | Inland, coastal, marine or underground waters | There is no Inland, coastal, and marine or
underground water around the site. | 7. | State, National boundaries | There is no State, National boundaries within the
radius of 10km. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | There is no tourist, pilgrim areas within 10Km radius. | 9. | Defence installations | No defense installation is found within 10Km radius
from the project area. | 10. | Densely populated or built-up area, distance from nearest human habitation | 1. K.Pitchampatti 3 km - NE 1500
2. Pappanaickaur 1.5 km - NW 500
3. Kollapatti 2.0 km - SW 700
4. Chatrapatti 2 km - SE 500 | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Palayam is having all the basic facilities like hospitals
schools, places of worship, community facilities is at a
distance of 12km on the Southeastern side of the lease
area. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | The quarry operation is restricted up to depth of
41.5m at present scenario considering for the entire
lease period. Hence the ground water will not be
affected beside the area is devoid of agriculture,
Forestry, Tourist place etc. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | The atmospheric air is quite fresh. The area has not
been subjected to pollution or environmental damage.
The project area is a dry land covered mostly by rocky
exposures. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | The areas are not susceptible to natural hazards like
landslides, earthquake, it is a high stable land. There
are no records in the past for such type of activities. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/TN/MIN/17922/2018 | File Number | DIA/TN/MIN/17922/2018 | Date of Apply EC | 05 Oct 2018 |
| |
|