APPENDIX I
(See Paragraph-6)
FORM 1M
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
(i).Name of the Mining Lease site Mr. Manjunaik, Roughstone Quarry over an extent of 4.10.0Ha. S.F.No.136(Part-3) in Venkateshapuram Village, Shoolagiri Taluk, Krishnagiri District.
(ii).Location / site (GPS Co-ordinate) 12° 44’ 34.91” N To 12° 44’ 46.30” N to 77° 56’ 40.25” E To 77° 56’ 46.63” E
Annexure-GPS file      
(iii).
Type of LeaseIndivisual Area
Size of the Mining Lease (in ha.)4.10.0 ha.
(iv).Capacity of the Mining Lease (TPA) 4186420
(v).Period of Mining Lease 5
(vi).Expected cost of the Project 187
(vii).
Have you hired Consultant/Registered Qualified Person(RQP) for preparing document?No
Reason for not hiring the Consultant/RQP -
(II) Environmental Sensitivity
S.No Areas Distance in kilometer / Details
1. (i).  Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms.  0 km
2. (ii). Nearest Infrastructural along with distance in kms  1.5 km
(iii). Nearest Railway Line along with distance in kms  0 km
(iv). Nearest National Highway along with distance in kms  0 km
(v). Nearest State Highway along with distance in kms  0 km
(vi). Nearest Major District Road along with distance in kms 0 km
(vii). Nearest Any Other Road along with distance in kms  1.6 km
(viii). Nearest Electric transmission line pole or tower distance in kms  0 km
(ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms  0 km
(x). Nearest In-take for drinking water pump house distance in kms  1.5 km
(xi). Nearest In-take for Irrigation canal pumps distance in kms  0 km
3. Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
There are no such protected areas like ecological landscape, cultural area etc. identified within the 10km radius.
4. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests There are no sensitive water bodies, biospheres, national parks, sanctuaries, reserve forest in 10 kms radius from proposed project site. No Coastal zone is located in the nearby area. Bay of Bengal lays more than 124 kms.
5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration There is no protected sensitive species are identified within the 10km radius.
6. Inland, coastal, marine or underground waters There is no Inland, coastal and marine or underground water around the site.
7. State, National boundaries There is no Interstate boundary within the radius of 10km.
8. Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas There is no tourist places and the pilgrim sites near the area.
9. Defence installations No Defense installations found within 10km Radius.
10. Densely populated or built-up area, distance from nearest human habitation Hosur-10.0km
11. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) Hosur having all the facilities which are at a distance of 10Km western side from the lease area.
12. Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) The quarry operation is restricted to only 99m depth (1m Top soil + 98m Rough Stone) Above Ground level 43m and Below Ground Level 56m above ground level for a period of five years. Hence the ground water will not be affected beside the area is devoid of agriculture, Forestry, Tourist place etc.,
13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) This is the fresh quarry project, hence the area has not subjected to pollution or environmental damage. The atmosphere is quite fresh and it is proposed to carry out the quarrying operations an Eco friendly manner.
14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) The areas are not susceptible to natural hazards like landslides, earthquake, it is a high stable land. There are no evidences recorded in the past history.
15.
Is proposed mining site located over or near fissure/fracture for ground water recharge?No
16.
Whether the proposal involves approval or clearance under the following Regulations or Acts namely?
(a).
The Forest (Conservation) Act,1980?No
(b).
The Wildlife (Protection) Act,1972?No
(c).
The Coastal Regulation Zone (C.R.Z) notification,2011?No
17.
Is forest land involved (ha)?No
18.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
19.
New/Expansion/ModernizationNew
Proposal NumberDIA/TN/MIN/15279/2018
File NumberTo be assigned
Date of Apply EC18 May 2018
Details of State of the project
S.No. State Name District Name Tehsil Name
(1.)Tamil NaduKrishnagiriHosur
(III) EC Attachments
1 Uploaded PFR (Pre Feasibility Report) File Annexure-PFR file
2 Uploaded Approved Mining Plan File Annexure-Approved Mining Plan file
3 Uploaded District survey report Annexure-District Survey Report
4 Uploaded Cover Letter Annexure-Cover Letter
Uploaded Additional attachments, if any
S.No. Attached File Date of Submission
(1.)Approval letter18 May 2018
(IV) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge.
(IV).(i)
NameMANJU NAIK
DesignationOwner
Company MANJU NAIK
AddressManju Naik, S/o. M. Shama Naik, Sevanayakana Doddi, Ragihalli Post, Anekal Taluk, Bangalore District-560 083.
Print