APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | P.Balakumaran, Savudu Quarry
from over an Extent of 4.68.82Ha in S.F.No: 473/4B, 474/2, 474/3A, 474/3B, 474/3C,
475/1A2, 475/1B2, 475/2 & 476/1 of W.Pudupatti village, Srivilliputhur Taluk,
Virudhu |
| (ii). | Location / site (GPS Co-ordinate) | 09°37'18.64"N to 09°37'28.68"N
77°36'40.70"E to 77°36'52.86"EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 4.68.82 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 68557 | | (v). | Period of Mining Lease | 3 | | (vi). | Expected cost of the Project | 81.09 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | * | Name of Consultant/RQP | Ilavarsan S | Address | Fairlands, Salem | Mobile No. | 9443356539 | Landline No. | 2431989 | Email Id | pproponent@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 0 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 0 km | | (iii). Nearest Railway Line along with distance in kms | 14 km | | (iv). Nearest National Highway along with distance in kms | 36 km | | (v). Nearest State Highway along with distance in kms | 5 km | | (vi). Nearest Major District Road along with distance in kms | 0.100 km | | (vii). Nearest Any Other Road along with distance in kms | 0 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 0.500 km | | (x). Nearest In-take for drinking water pump house distance in kms | 1 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No protected areas to be identified with in 10
km distance. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Venkateswarapuram reserved forest is situated
at 1.0Km South Western side.
Saptur reserved forest is situated at 8.0Km
North Western side.
Lake is situated within 500m radius from lease
applied area.
Odai is located within the radius of 500m.
Sasuragiri river passing 4.0Km North Eastern
from the lease applied area.
W.Pudupatti lake is Situated 1.5Km North
Eastern from the lease applied area. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | --------------- | 6. | Inland, coastal, marine or underground waters | There is no Inland, coastal, marine or
underground water around the site. | 7. | State, National boundaries | There is no State or National boundaries within
a radius of 10Km. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | There are no Tourist, pilgrim areas within 10
Km radius | 9. | Defence installations | No defense installation found 10km near the
site | 10. | Densely populated or built-up area, distance from nearest human habitation | 1. Watrap 3.0Km - NE 1000
2. W.Pudupatti 2.5Km - SE 1500
3. Kansapuram 1.0Km - NW 900 | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Srivilliputhur is having all the facilities, which
are at a distance of 12km on the South eastern
side of the area. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | The quarry operation is restricted to only 2m
depth below the ground level and proposed to
excavate for a period of Three years only.
Hence the ground water will not be affected
beside the area is devoid of agriculture,
Forestry, Tourist place etc. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | This is a fresh lease applied area. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | The area is not susceptible to natural hazards
like landslides, Savudu quake; it is a high stable
land. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/TN/MIN/14529/2018 | File Number | To be assigned | Date of Apply EC | 17 Oct 2018 |
| |
|