APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Masonry Stone Mining Project
ML No.-384/07 |
| (ii). | Location / site (GPS Co-ordinate) | 270 20’ 52.16” N 750 15’ 14.55”EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 1 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 100000 | | (v). | Period of Mining Lease | 20 | | (vi). | Expected cost of the Project | 25 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | No | Reason for not hiring the Consultant/RQP | not required | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | None km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | Approx 1.0 Km toward km | | (iii). Nearest Railway Line along with distance in kms | (Approx. 30 in E di km | | (iv). Nearest National Highway along with distance in kms | Approx 29.40 Km tow km | | (v). Nearest State Highway along with distance in kms | Approx 20 Km toward km | | (vi). Nearest Major District Road along with distance in kms | Approx 5.0 Km toward km | | (vii). Nearest Any Other Road along with distance in kms | None km | | (viii). Nearest Electric transmission line pole or tower distance in kms | Approx 1.0 Km toward km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | none km | | (x). Nearest In-take for drinking water pump house distance in kms | Approx 1.0 Km toward km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | Approx 1.0 Km toward km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | None, within 10 km radius area of mine site. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | ? PF Approx-1.0 Kms Towards NE Direction
? Nimawas Block PF Approx 4.0 Km Towards SW Direction | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | None, within 10 km radius area of mine site. | 6. | Inland, coastal, marine or underground waters | None, within 10 km radius area of mine site. | 7. | State, National boundaries | None, within 10 km radius area of mine site. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | NH-8 Approx 29.40 Km towards ESE
SH-8 A Approx 20 Km towards WNW | 9. | Defence installations | None, within 10 km radius area of mine site. | 10. | Densely populated or built-up area, distance from nearest human habitation | Kantia Approx 1.0 Km towards SE Direction | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Kantia Approx 1.0 Km towards SE Direction
Danta Approx. 8.0 in SW direction | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | ? PF Approx-1.0 Kms Towards NE Direction
? Nimawas Block PF Approx 4.0 Km Towards SW Direction | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | None, within 10 km radius area of mine site. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | None, within 10 km radius area of mine site. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/RJ/MIN/6603/2017 | File Number | To be assigned | Date of Apply EC | 22 May 2017 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Rajasthan | Sikar | Danta Ramgarh | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | RAJENDRA KUMARSHARMA | Designation | onwer | Company | RAJENDRA KUMARSHARMA | Address | Danta, Sikar |
| |
|