APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Khursura Sand Mine Project of Sarpanch/Sachiv Gram Panchayat Khursura |
| (ii). | Location / site (GPS Co-ordinate) | 1. 22°10'58.69"N, 80° 0'59.19"E
2. 22°11'1.99"N, 80° 0'56.75"E
3. 22°11'2.86"N, 80° 0'57.96"E
4. 22°10'59.34"N, 80° 1'0.35"EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 0.500 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 10516 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 0.50 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 40/2013 | Name of Consultant/RQP | Balraj Singh Choudhary | Address | Ward No.16, Seoni Pran Moti,Chhindwara | Mobile No. | 9424936014 | Landline No. | 0 | Email Id | balrajgeo@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 0.0 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 1.40 km | | (iii). Nearest Railway Line along with distance in kms | 0 km | | (iv). Nearest National Highway along with distance in kms | 70 km | | (v). Nearest State Highway along with distance in kms | 20 km | | (vi). Nearest Major District Road along with distance in kms | 20 km | | (vii). Nearest Any Other Road along with distance in kms | 0.50 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0.9 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 0 km | | (x). Nearest In-take for drinking water pump house distance in kms | 0.300 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | None within 1.0km periphery of the mine area. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | None within 1.0km periphery of the mine area. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | None within 1.0km periphery of the mine area. | 6. | Inland, coastal, marine or underground waters | None within 1.0km periphery of the mine area. | 7. | State, National boundaries | More than 100km from mine site. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | No | 9. | Defence installations | No | 10. | Densely populated or built-up area, distance from nearest human habitation | Small village hutments are located at 1.0km of the mine area. | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | All these man made mand uses are located at tehsil keolari which is about 38km from mine area. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | None within 1.0km periphery of the mine area. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | None within 1.0km periphery of the mine area. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | None within 1.0km periphery of the mine area. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/MP/MIN/16974/2018 | File Number | 194-10/09/2018 | Date of Apply EC | 05 Sep 2018 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Madhya Pradesh | Seoni | Keolari | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | GRAM PANCHAYAT SAND MINE SEONI | Designation | Owner | Company | GRAM PANCHAYAT SAND MINE SEONI | Address | Gram Panchayat Bhawan, Seoni |
| |
|