APPENDIX I
(See Paragraph-6)
FORM 1M
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
(i).Name of the Mining Lease site P P Kharpatil Consts Pvt Ltd
(ii).Location / site (GPS Co-ordinate) 18°51’31.86”N 73°2’50.70”E 18°51’31.92”N 73°2’52.18”E 18°51’32.70”N 73°2’55.43”E 18°51’29.22”N 73°2’56.71”E 18°51’28.67”N 73°2’54.33”E 18°51’28.69”N 73°2’51.44”E 18°51’29.07”N 73°2’51.21”E 18°5
Annexure-GPS file      
(iii).
Type of LeaseIndivisual Area
Size of the Mining Lease (in ha.)1.57 ha.
(iv).Capacity of the Mining Lease (TPA) 50000
(v).Period of Mining Lease 5
(vi).Expected cost of the Project 25
(vii).
Have you hired Consultant/Registered Qualified Person(RQP) for preparing document?Yes
Accreditation No.List A-131 
Name of Consultant/RQPSadekar Enviro Engineers Pvt Ltd
Address 310, Dempo Tower, EDC Patto, Panaji-403001, Goa State
Mobile No.9820144125
Landline No.25833321
Email Idprs@sadekarenviro.com
(II) Environmental Sensitivity
S.No Areas Distance in kilometer / Details
1. (i).  Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms.  5.06 km
2. (ii). Nearest Infrastructural along with distance in kms  1.24 km
(iii). Nearest Railway Line along with distance in kms  5.25 km
(iv). Nearest National Highway along with distance in kms  5.15 km
(v). Nearest State Highway along with distance in kms  7.72 km
(vi). Nearest Major District Road along with distance in kms Not Applicable km
(vii). Nearest Any Other Road along with distance in kms  0.55 km
(viii). Nearest Electric transmission line pole or tower distance in kms  1.39 km
(ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms  1.18 km
(x). Nearest In-take for drinking water pump house distance in kms  Not Applicable. km
(xi). Nearest In-take for Irrigation canal pumps distance in kms  Not Applicable. km
3. Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Not applicable
4. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Not applicable
5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Not applicable
6. Inland, coastal, marine or underground waters Coast – 6.56 km away from project site in west Patalganga River–5.34 km away from project site in SE Karanja Creek – 6.69 Kms away from the project site in west direction Ransai Dam- 3.88 Kms Away From the Project site in the NE direction
7. State, National boundaries Not applicable
8. Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas NH 66 which is approximately 5.15 Km in the East direction.
9. Defence installations Not applicable
10. Densely populated or built-up area, distance from nearest human habitation Habitation is beyond 0.98 Km (Chirner) from quarry area
11. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) School and small temples present in nearby vicinity
12. Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Underground water & agricultural land is present in nearby area.
13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) Not Applicable
14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) The Area falls in Zone 3 as per Seismic zone Classification No Historical Data suggests evidence for Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions
15.
Is proposed mining site located over or near fissure/fracture for ground water recharge?No
16.
Whether the proposal involves approval or clearance under the following Regulations or Acts namely?
(a).
The Forest (Conservation) Act,1980?No
(b).
The Wildlife (Protection) Act,1972?No
(c).
The Coastal Regulation Zone (C.R.Z) notification,2011?No
17.
Is forest land involved (ha)?No
18.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
19.
New/Expansion/ModernizationNew
Proposal NumberDIA/MH/MIN/9113/2017
File NumberKhasha/Kharpatil/9/2017
Date of Apply EC18 Sep 2017
Details of State of the project
S.No. State Name District Name Tehsil Name
(1.)MaharashtraRaigadUran
(III) EC Attachments
1 Uploaded PFR (Pre Feasibility Report) File Annexure-PFR file
2 Uploaded Approved Mining Plan File Annexure-Approved Mining Plan file
3 Uploaded District survey report Annexure-District Survey Report
4 Uploaded Cover Letter Annexure-Cover Letter
Uploaded Additional attachments, if any
S.No. Attached File Date of Submission
(1.)7/1218 Sep 2017
(2.)Grampanchayat NOC18 Sep 2017
(3.)7/1218 Sep 2017
(4.)Grampanchayat NOC18 Sep 2017
(5.)Lease Application18 Sep 2017
(IV) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge.
(IV).(i)
NameM/S P.P. KHARPATIL CONSTS PVT. LTD.
DesignationDirector
Company M/S P.P. KHARPATIL CONSTS PVT. LTD.
AddressSurvey no. 89/6, Village- Chirner,Taluka - Uran, District - Raigad, Maharashtra
Print