APPENDIX I
(See Paragraph-6)
FORM 1M
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
(i).Name of the Mining Lease site Shri Rajeev Dadabhau Sonule Gat NO 209 (Part) Vill-Gatewadi Tah-Parner Dist-Ahmadnager
(ii).Location / site (GPS Co-ordinate) 18°55'51.45"N 74°26'21.20"E 18°55'49.03"N 74°26'25.75"E 18°55'47.62"N 74°26'25.40"E 18°55'48.82"N 74°26'23.03"E 18°55'48.45"N 74°26'22.37"E 18°55'48.80"N 74°26'19.36"E
Annexure-GPS file      
(iii).
Type of LeaseIndivisual Area
Size of the Mining Lease (in ha.)1.00 ha.
(iv).Capacity of the Mining Lease (TPA) 15937
(v).Period of Mining Lease 5
(vi).Expected cost of the Project 25
(vii).
Have you hired Consultant/Registered Qualified Person(RQP) for preparing document?Yes
Accreditation No.RA074/033 
Name of Consultant/RQPShri Kishor L. Jadhav
Address Earthcare Labs Pvt Ltd. C-11 AmarEnclave, Commercial Wing,Jog Layout, Prasant Nager, Nagpur-15
Mobile No.9822203750
Landline No.2281470
Email Idearthcare2000@gmail.com
(II) Environmental Sensitivity
S.No Areas Distance in kilometer / Details
1. (i).  Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms.  4.76 km
2. (ii). Nearest Infrastructural along with distance in kms  0.70 km
(iii). Nearest Railway Line along with distance in kms  20.95 km
(iv). Nearest National Highway along with distance in kms  24.96 km
(v). Nearest State Highway along with distance in kms  2.91 km
(vi). Nearest Major District Road along with distance in kms 1.25 km
(vii). Nearest Any Other Road along with distance in kms  1.16 km
(viii). Nearest Electric transmission line pole or tower distance in kms  0.70 km
(ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms  3.72 km
(x). Nearest In-take for drinking water pump house distance in kms  29.16 km
(xi). Nearest In-take for Irrigation canal pumps distance in kms  29.16 km
3. Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Not Existing in 5 km Radius
4. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Not Existing in 5 km Radius
5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Not Existing in 5 km Radius
6. Inland, coastal, marine or underground waters Not Existing in 5 km Radius
7. State, National boundaries Not Existing in 5 km Radius
8. Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas Not Existing in 5 km Radius
9. Defence installations Not Existing in 5 km Radius
10. Densely populated or built-up area, distance from nearest human habitation Village- Gatewadi 0.70 km towards NE Direction
11. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) Shree Samarth Academy 5.00 km towards East Direction
12. Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Not Existing in 5 km Radius
13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) Not Existing in 5 km Radius
14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Not Existing in 5 km Radius
15.
Is proposed mining site located over or near fissure/fracture for ground water recharge?No
16.
Whether the proposal involves approval or clearance under the following Regulations or Acts namely?
(a).
The Forest (Conservation) Act,1980?No
(b).
The Wildlife (Protection) Act,1972?No
(c).
The Coastal Regulation Zone (C.R.Z) notification,2011?No
17.
Is forest land involved (ha)?No
18.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
19.
New/Expansion/ModernizationNew
Proposal NumberDIA/MH/MIN/4170/2017
File Number3
Date of Apply EC19 Jan 2017
Details of State of the project
S.No. State Name District Name Tehsil Name
(1.)MaharashtraAhmednagarParner
(III) EC Attachments
1 Uploaded PFR (Pre Feasibility Report) File Annexure-PFR file
2 Uploaded Approved Mining Plan File Annexure-Approved Mining Plan file
3 Uploaded District survey report Annexure-District Survey Report
4 Uploaded Cover Letter Annexure-Cover Letter
Uploaded Additional attachments, if any
S.No. Attached File Date of Submission
(1.)Undertaking Form19 Jan 2017
(IV) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge.
(IV).(i)
NameSHRI RAJEEV DADABHAU SONULE
DesignationProritoer
Company SHRI RAJEEV DADABHAU SONULE
AddressShri Rajeev Dadabhau Sonule Gat No 209 (part) Vill-Gatewadi,Tah-Parner Dist-Ahmadnager.
Print