APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | M/s. Mahavir Roads & Infrastructure Pvt. Ltd.
Survey no. : 387 P
Village : Turbhe
Tahsil : Thane
District : Thane |
| (ii). | Location / site (GPS Co-ordinate) | Longitude : 73°02’10”E
Latitude : 19°04'47.8”.NAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 1.215 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 130000 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 80 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 109 | Name of Consultant/RQP | Pollution & Ecology Control Services | Address | Near Dhantoli Police Station, Dhantoli Nagpur 440012 | Mobile No. | 9373128182 | Landline No. | 2293225 | Email Id | pecs_nagpur@rediffmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 2 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 1 km | | (iii). Nearest Railway Line along with distance in kms | 2 km | | (iv). Nearest National Highway along with distance in kms | 4.5 km | | (v). Nearest State Highway along with distance in kms | 5 km | | (vi). Nearest Major District Road along with distance in kms | 1 km | | (vii). Nearest Any Other Road along with distance in kms | 0.2 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0.5 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 2.5 km | | (x). Nearest In-take for drinking water pump house distance in kms | 20 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 20 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | 15 km Sanjay Gandhi National Park
21 km Flamingo Bird Sanctuary | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | 4.5 km Protected mangroves forest
15 km Sanjay Gandhi National Park
21 km Flamingo Bird Sanctuary | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | 21 km Flamingo Bird Sanctuary | 6. | Inland, coastal, marine or underground waters | 22 km Arabian Sea | 7. | State, National boundaries | No | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | 4.5 km NH-4 | 9. | Defence installations | 16 km Trombay | 10. | Densely populated or built-up area, distance from nearest human habitation | 1.5 km - Turbhe | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | 1.5 km Turbhe
1.5 km College, School. Hospital | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | 10 to 20 km Mumbai Tourist places | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | Yes, Thane-Belapur industrial belt | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | No | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | Yes | Status | In-Principle(Stage-I) Approval Obtained | File number | 8-33/99-FC | Date of In-Principle | 19 Sep 2006 | Area diverted | 1.215 | Uploaded Clearance Letter | Annexure-Uploaded clearance letter | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | Yes | Uploaded details | 1.215 | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/MH/MIN/2210/2016 | File Number | To be assigned | Date of Apply EC | 23 Oct 2016 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Thane | Thane | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | NMDKCMS | Designation | Owner | Company | NMDKCMS | Address | Project Proponent, Navi Mumbai, Tah. Thane, Dist. Thane |
| |
|