APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Eklara Sandghat (Minor Mineral) Mining Project Adjacent Khasra No. 2, 151, 143, 139 for Eklara, Tehsil – Anjangaon, District - Amravati, State - Maharashtra. |
| (ii). | Location / site (GPS Co-ordinate) | Sr. No Latitude “N” Longitude “E”
1 21° 3'11.30"N 77°22'29.63"E
2 21° 3'9.18"N 77°22'29.15"E
3 21° 3'7.58"N 77°22'28.57"E
4 21° 3'6.41"N 77°22'27.88"E
5 21° 3'6.47"N 77°22'27.71"E
6 2Annexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 0.08 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 634.5 | | (v). | Period of Mining Lease | 01 | | (vi). | Expected cost of the Project | 2.179 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | NABET/EIA/1619/IA 007 | Name of Consultant/RQP | GMECINTERNATIONAL | Address | SAHARAN TOWER 308, OFFICERS CAMPUS EXTENSION, NEAR SANSKAR SCHOOL, SIRSI ROAD KHATIPURA JAIPUR-302012 | Mobile No. | 9928793002 | Landline No. | 2353241 | Email Id | info@gmecinternational.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 0.0 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 0.50 km towards N km | | (iii). Nearest Railway Line along with distance in kms | 4.40 km towards SW km | | (iv). Nearest National Highway along with distance in kms | 0.0 km | | (v). Nearest State Highway along with distance in kms | 6.40 km towards West km | | (vi). Nearest Major District Road along with distance in kms | 0.0 km | | (vii). Nearest Any Other Road along with distance in kms | 0.0 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0.50 km towards N km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | Bhuleshwari River km | | (x). Nearest In-take for drinking water pump house distance in kms | 0.50 km towards N km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0.0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | NO | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | The quarry area is itself part of water body i.e. Bhuleshwari River, there are number of tributes of Bhuleshwari River is also available in Study Area. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | NO | 6. | Inland, coastal, marine or underground waters | The project lies in Bhuleshwari River. | 7. | State, National boundaries | NO | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | SH-212 is available at 6.40 km towards West and SH-201 is available at 11.40 km towards East from the project site. | 9. | Defence installations | NO | 10. | Densely populated or built-up area, distance from nearest human habitation | Eklara is available at 0.50 km towards North from the study area. | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | a) School: -The Primary school facility is available at village – Eklara (0.50 km, in North direction from the quarry area)
b) Hospital: -Hospital facility is available Daryapur (14.70 Km, in South West direction from the quarry area),
c) Temple: Mandir at Eklara (0.50 km, in North direction), from the study area. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Quarry mine area is falls in Bhuleshwari River. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | NO | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | The area is falls in Seismic Zone –III | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/MH/MIN/15064/2018 | File Number | DIA/MH/MIN/15064/2018 | Date of Apply EC | 15 May 2018 |
| |
|