APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | KADAUTITOLA STONE QUARRY |
| (ii). | Location / site (GPS Co-ordinate) | Latitude: 21°14'32.13"N to 21°14'39.38"N
Longitude: 80°25'57.39"E to 80°26'2.72"EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 2.00 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 24000 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 25 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | NABET/EIA/1518/SA025 | Name of Consultant/RQP | EXCEL ENVIRO TECH | Address | AHMEDABAD | Mobile No. | 9595688316 | Landline No. | 09595688 | Email Id | milind.kundal@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 0.44 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 0.38 km | | (iii). Nearest Railway Line along with distance in kms | 7.1 km | | (iv). Nearest National Highway along with distance in kms | 19 km | | (v). Nearest State Highway along with distance in kms | 35 km | | (vi). Nearest Major District Road along with distance in kms | 2.6 km | | (vii). Nearest Any Other Road along with distance in kms | 4.5 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0.35 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 0.05 km | | (x). Nearest In-take for drinking water pump house distance in kms | 00 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 00 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | None within 5 km | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | None within 5 km | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Open mixed jungle : 1 km NE
Reserved Forest: 5.5 km SE
Fairly Dense Jungle: 2.7 km, W
Protected Forest: 6 km W | 6. | Inland, coastal, marine or underground waters | Pujaritola Dharan Reservoir : 58m W
Bagh River: 725 m SE
Pujaritola Dam: 620 m SE
Bagh Left Bank canal: 190 m NE
Bagh Right Bank canal: 1.6 km SE | 7. | State, National boundaries | Maharashtra Madhya Pradesh 14 Km, N
Maharashtra Chattisgarh 7.7 km, SE | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | NH 6: 19 Km, S
SH 249: 35 km NW
Amgaon Deori Road: 2.6 Km, W
Mohadi Hardoli Road: 4.5 Km, SW | 9. | Defence installations | None within 10 km radius area | 10. | Densely populated or built-up area, distance from nearest human habitation | Makkatola village: 0.4 Km, N
Kadautitola village: 0.54 km W | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | School, Temple, community facilities are present Makkatola & kadautitola village | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | The applied area consists of good reserves of Stone (Rhyolite). Pujaritola Dharan Reservoir is located 60m W to the applied area. There are no scarce resources such as forest, fishery or tourism spot in the applied mining area or in the vicinity of the project site. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | There is no such area within 5 km radius of the project site. There are some existing stone quarries in the vicinity of the project. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | The applied area falls in Seismic Zone II, which is least active zone. Pujaritola Dharan Reservoir is located 60 m W to the project site. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/MH/MIN/14377/2018 | File Number | 14377/2018 | Date of Apply EC | 05 Apr 2018 |
| |
|