APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Basalt&Murrum Mining Project
Sy No- 174 & 175,Mauja Yeldari, Taluka- Pusad, District- Yavatmal, Maharashtra |
| (ii). | Location / site (GPS Co-ordinate) | Sr. No. Latitude Longitude
A 19055’21.3 ”N 77029’ 54.5 ”E
B 19055’20.4 ”N 77029’ 49.8 ”E
C 19055’20.5”N 77029’ 51.6”E
D 19055’20.8 ”N 77029’ 51.8 ”E
E 19055’20.8”N 77029’ 53.1 ”E
F 19055’20.6”NAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 1.60 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 39641 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 25 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 1619/RA0037 | Name of Consultant/RQP | Vardan Environet | Address | Gurugram Haryana | Mobile No. | 9024032841 | Landline No. | 2983404 | Email Id | vardan.jaipur@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | none km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | Approx 0.86 Km towar km | | (iii). Nearest Railway Line along with distance in kms | (Approx. 41.50 Km in km | | (iv). Nearest National Highway along with distance in kms | None km | | (v). Nearest State Highway along with distance in kms | SH-183 Approx 1.0 K km | | (vi). Nearest Major District Road along with distance in kms | None km | | (vii). Nearest Any Other Road along with distance in kms | Village Road Approx km | | (viii). Nearest Electric transmission line pole or tower distance in kms | Approx 0.86 Km towar km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | ? Pus Water Reservoi km | | (x). Nearest In-take for drinking water pump house distance in kms | Approx 0.86 Km towar km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | None km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | None, within 10 km distance from the periphery of lease area. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | ? River Approx 6.82 km towards E
? Pus Water Reservoir approx 9.0 km towards NW
? Water Reservoir approx 4.27 km towards NW
? Water Reservoir approx 1.92 km towards WNW
? Water Reservoir approx 3.12 km towards SSW | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | None, within 10 km distance from the periphery of lease area. | 6. | Inland, coastal, marine or underground waters | None, within 10 km distance from the periphery of lease area. | 7. | State, National boundaries | None, within 10 km distance from the periphery of lease area. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | SH-183 Approx 1.0 Km towards S
SH-213Approx 6.0 Km towards SE
Village Road Approx 0.50 Km towards W
Washim (Approx. 41.50 Km in NW direction)
Nagpur Airport (Approx. 207.0 in NE direction) | 9. | Defence installations | None, within 10 km distance from the periphery of lease area. | 10. | Densely populated or built-up area, distance from nearest human habitation | GajipurApprox 0.86 Km towards WNW
Yeldari Approx1.6 Km towards S
Pusad Approx 7.5 Km towards E | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | GajipurApprox 0.86 Km towards WNW
Yeldari Approx1.6 Km towards S
Pusad Approx 7.5 Km towards E | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | ? River Approx 6.82 km towards E
? Pus Water Reservoir approx 9.0 km towards NW
? Water Reservoir approx 4.27 km towards NW
? Water Reservoir approx 1.92 km towards WNW
? Water Reservoir approx 3.12 km towards SSW | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | None, within 10 km distance from the periphery of lease area. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | None, within 10 km distance from the periphery of lease area. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/MH/MIN/14061/2018 | File Number | DIA/MH/MIN/14061/2018 | Date of Apply EC | 22 Mar 2018 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Yavatmal | Pusad | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | YELDARI STONE QUARRY | Designation | owner | Company | YELDARI STONE QUARRY | Address | Mauja- Yeldari, Taluka-Pusad
District-Yavatmal |
| |
|