APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Building Stone Quarry of C.P. Thomas |
| (ii). | Location / site (GPS Co-ordinate) | 11°4'14.72"N - 11°4'17.35"N
76°1'59.62"E - 76°2'4.46"EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 0.7909 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 15004 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 30 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | DMG/KERALA/RQP/7/2016 | Name of Consultant/RQP | Nazar Ahamed K.V | Address | N Square Mining and Environmental Solutions LLP | Mobile No. | 9447177533 | Landline No. | 2677533 | Email Id | geologistna@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 16 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 0.6 km | | (iii). Nearest Railway Line along with distance in kms | 16 km | | (iv). Nearest National Highway along with distance in kms | 12 km | | (v). Nearest State Highway along with distance in kms | 1 km | | (vi). Nearest Major District Road along with distance in kms | 0.8 km | | (vii). Nearest Any Other Road along with distance in kms | 0.1 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 2 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 2.5 km | | (x). Nearest In-take for drinking water pump house distance in kms | 2.5 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 2.5 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No area protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Kadalundy River-4Km,
Parappanagadi Coastal area -21Km, Kannamangalam Forest Range-8Km | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | 6. | Inland, coastal, marine or underground waters | Parappanagadi Coastal area -21Km, | 7. | State, National boundaries | No State, National boundaries within 2Km | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | No tourist,pilgrim area within 1Km radius. | 9. | Defence installations | No Defence installations within 1Km | 10. | Densely populated or built-up area, distance from nearest human habitation | Nearest House is 86.55m | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Hospital -Primary Health center 3KM,
Fathima matha Church-0.6Km,
Kadaparamb Juma masjid -1.5Km,
Thiruvanthakunnu Temple-3Km,
Alphonsa School-0.6Km. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Kannamangalam Forest Range-8Km
Mini ootty View Point-3Km
Cheruppadimala-6.5Km | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No areas already subjected to pollution or environmental damage. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | No, areas is not susceptible to natural hazard as there is no history of such incidents. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/KL/MIN/14655/2018 | File Number | DEIAA/MAL/EC/079/2018 | Date of Apply EC | 24 May 2018 |
| |
|