APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | BuILDING Stone Quarry of Mr Ganeshan |
| (ii). | Location / site (GPS Co-ordinate) | 11° 12'8.75"N - 11° 12'14.08"N
76°7'3.88"E - 76°7'9.08"EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 1.5866 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 43735 | | (v). | Period of Mining Lease | 10 | | (vi). | Expected cost of the Project | 40 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | DMG/KERALA/RQP/7/2016 | Name of Consultant/RQP | Nazar Ahamed K.V | Address | N Square MES LLP,Edappal | Mobile No. | 9447177533 | Landline No. | 2677533 | Email Id | geologistna@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 3 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 1.5 km | | (iii). Nearest Railway Line along with distance in kms | 16 km | | (iv). Nearest National Highway along with distance in kms | 11 km | | (v). Nearest State Highway along with distance in kms | 1.5 km | | (vi). Nearest Major District Road along with distance in kms | 2 km | | (vii). Nearest Any Other Road along with distance in kms | 1.5 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 1.5 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 3 km | | (x). Nearest In-take for drinking water pump house distance in kms | 2 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 2 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No Areas protected under international conventions national or local legislation For their ecological, landscape, cultural or other related value. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No forest land or mountains within 1Km,
Chaliyar River-3km,
Parappanangadi Coastal Area-33km | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No important or sensitive species of flora or fauna for
breeding, nesting, foraging, resting, over
wintering, migration | 6. | Inland, coastal, marine or underground waters | Parappanangadi Coastal Area-33km | 7. | State, National boundaries | State Boundaries-50km | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | No tourist, pilgrim areas within the 1km | 9. | Defence installations | No defense Installation within 1km | 10. | Densely populated or built-up area, distance from nearest human habitation | The nearest human settlements are 263.5m away from project site. | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Sehion Marthoma Church Kattumunda-12km,
Pathiyalam Masjid-1.5km,
Chavidikuzhi Temple-1.5km,
Community Health Center Edavanna-4km,
Jamia Nadwiyya School-5km | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Karukamana,Pullipadam Forest area-12km | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | Nill | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | No, Permit area is not susceptible to natural Hazard, as there is no history of such incidents | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/KL/MIN/14390/2018 | File Number | DEIAA/MAL/EC/077/2018 | Date of Apply EC | 24 May 2018 |
| |
|